[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140397":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1140397,799,1,"单选题","根据建设工程的总进度目标要求，项目管理的主要任务是在项目的（ ）阶段对项目的目标进行控制。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","决策",false,{"key":16,"text":17,"correct":14},"B","计划",{"key":19,"text":20,"correct":21},"C","实施",true,{"key":23,"text":24,"correct":14},"D","分析","本题主要考查项目管理的任务。 建设工程项目的总进度目标指的是整个项目的进度目标，它是在项目决策阶段项目定义时确定的，项目管理的主要任务是在项目的实施阶段对项目的目标进行控制。 综上所述，本题正确选项为C项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]