[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140395":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1140395,799,1,"单选题","建设工程管理的核心任务是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","目标控制",false,{"key":16,"text":17,"correct":14},"B","提高建设项目生命周期价值",{"key":19,"text":20,"correct":14},"C","实现业主的建设目标和为工程的建设增值",{"key":22,"text":23,"correct":24},"D","为工程的建设和使用增值",true,"本题考核的是建设工程管理的核心任务。 建设工程管理工作是一种增值服务工作，其核心是为工程的建设和使用增值。 综上所述，正确选项为D。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]