[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":629},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,46,50,2696,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,213,228,243,257,271,286,301,313,325,337,348,359,371,383,395,407,419,431,442,454,465,477,489,501,511,522,533,545,557,569,581,593,605,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1139939,1,"单选题","根据《建设工程工程量清单计价规范》（GB50500—2013），施工企业综合单价的计算有以下工作，①测算人、料、机的数量；②确定组合定额子目；③计算各子目工程量；④计算清单项目的管理费和利润；⑤确定人、料、机单价；⑥计算清单项目的人、料、机总费用，正确的步骤是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","①-③-②-⑥-⑤-④",false,{"key":24,"text":25,"correct":26},"B","②-③-①-⑤-⑥-④",true,{"key":28,"text":29,"correct":22},"C","③-①-②-⑥-⑤-④",{"key":31,"text":32,"correct":22},"D","①-③-②-④-⑥-⑤","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1139940,"某土方工程，招标工程量清单中挖土方工程数量为2000 立方米，投标人根据地质资料和施工方案计算的实际挖土方量为2600 立方米。每立方米挖土方的：人、料、机费为65 元，每立方米人工运土的人、料、机费用25元，每立方米机械运土的人、料、机费用58 元，企业管理费取人、料、机总费用的14%，利润率取人、料、机总费用与管理费之和的8%，规费和税金的综合费率为16%，不考率其他因素，则投标人挖土方的投标综合单价为（ ）元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"182.21",{"key":24,"text":41,"correct":22},"211.37",{"key":28,"text":43,"correct":26},"236.88",{"key":31,"text":45,"correct":22},"274.78",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1139941,"根据《建设工程工程量清单计价规范》（GB50500—2013），建设工程招标投标过程中，可以作为竞争性费用的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"安全文明施工费",{"key":24,"text":53,"correct":26},"总承包服务费",{"key":28,"text":55,"correct":22},"规费",{"key":31,"text":57,"correct":22},"税金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1139942,"根据《建设工程工程量清单计价规范》（GB 50500—2013），下列不可以作为安全文明施工费计费基数的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"定额基价",{"key":24,"text":65,"correct":22},"定额人工费",{"key":28,"text":67,"correct":22},"定额人工费+定额机械费",{"key":31,"text":69,"correct":26},"定额人工费+定额材料费+定额机械费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1139943,"根据《建设工程工程量清单计价规范》（GB50500—2013），招标控制价的编制的说法正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"工程造价咨询人不得同时接受招标人和投标人对同一工程的招标控制价和投标报价的编制",{"key":24,"text":77,"correct":22},"招标控制价应在开标后公布，一经公布不得上调或下浮",{"key":28,"text":79,"correct":22},"招标项目设有招标控制价的，招标人只需在招标文件中如实公布招标控制价的总价",{"key":31,"text":81,"correct":22},"招标人应将招标控制价及有关资料报送工程所在地工程造价管理机构审批",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1139944,"在实际施工过程中，若招标文件某分部分项工程量清单项目特征描述与设计图纸不符，投标人报价时应按（ ）确定综合单价。",[86,88,90,92],{"key":20,"text":87,"correct":22},"设计图纸",{"key":24,"text":89,"correct":22},"清单项目特征描述",{"key":28,"text":91,"correct":22},"建设单位的指令",{"key":31,"text":93,"correct":26},"实际施工的项目特征",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1139945,"发包人应在收到承包人的签证报告（ ）内给予确认或提出修改意见，否则视为该签证报告已经认可。",[98,100,102,104],{"key":20,"text":99,"correct":22},"24 小时",{"key":24,"text":101,"correct":26},"48 小时",{"key":28,"text":103,"correct":22},"3 天",{"key":31,"text":105,"correct":22},"7 天",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1139946,"根据《建设工程量清单计价规范》（GB50500-2013），分部分项工程清单综合单价应包含（ ）以及一定范围内的风险费用。",[110,112,114,116],{"key":20,"text":111,"correct":22},"人工费、材料费、施工机具使用费、企业管理费、规费",{"key":24,"text":113,"correct":22},"人工费、材料和工程设备费、施工机具使用费、规费、利润、税金",{"key":28,"text":115,"correct":22},"材料费、工程设备费、施工机具使用费、规费、税金、企业管理费",{"key":31,"text":117,"correct":26},"人工费、材料费和工程设备费、施工机具使用费、企业管理费、利润",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1139947,"根据《建设工程工程量清单计价规范》（GB50500-2013），下列计价公式不正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"分部分项工程费=?分部分项工程量′分部分项工程综合单价",{"key":24,"text":125,"correct":26},"措施项目费=?措施项目工程量′措施项目综合单价",{"key":28,"text":127,"correct":22},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"key":31,"text":129,"correct":22},"单项工程报价= ?单位工程报价",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1139948,"投标人经复核，认为招标人公布的招标控制价未按照《建设工程工程量清单计价规范》(GB50500-2013)的规定进行编制的，应在招标控制价公布后（ ）天内向招投标监督机构和工程造价管理机构投诉。",[134,136,138,140],{"key":20,"text":135,"correct":22},"10",{"key":24,"text":137,"correct":22},"7",{"key":28,"text":139,"correct":26},"5",{"key":31,"text":141,"correct":22},"3",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1139949,"工程量清单计价模式下，关于分部分项工程量和综合单价的编制，下列说法错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"分部分项工程量是按施工图图示尺寸和工程量清单计算规则计算得到的工程净量",{"key":24,"text":149,"correct":22},"工程量清单综合单价是指完成一个清单规定项目所需的人工费、材料费、工程设备费、施工机具使用费和企业管理费、利润以及一定范围内的风险费用",{"key":28,"text":151,"correct":26},"清单项目一般以一个“综合实体”考虑，一个清单项目只对应一个定额子目",{"key":31,"text":153,"correct":22},"编制投标报价的综合单价时一般采用企业定额",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1139950,"主要适用于施工过程中必须发生，但在投标时很难具体分项预测，又无法单独列出项目内容的措施项目的措施项目费的计价方法是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"综合单价法",{"key":24,"text":161,"correct":22},"定额基价法",{"key":28,"text":163,"correct":26},"参数法计价",{"key":31,"text":165,"correct":22},"分包法计价",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1139951,"实行招标的工程合同价款应在中标通知书发出之日起（ ）天内，由发承包双方依据招标文件和中标人的投标文件在书面合同中约定。",[170,172,174,176],{"key":20,"text":171,"correct":22},"20",{"key":24,"text":173,"correct":22},"25",{"key":28,"text":175,"correct":22},"28",{"key":31,"text":177,"correct":26},"30",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1139952,"编制招标控制价时，根据省级或行业建设主管部门的规定，总承包服务费的计价方式正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"招标人仅要求总包人对其发包的专业工程进行施工现场协调和统一管理、对竣工材料进行统一汇总时，按专业工程估算造价的2.5%计取",{"key":24,"text":185,"correct":26},"招标人要求总包人对其发包的专业工程既进行总承包管理和协调,又要求提供相应配合服务时,总承包服务费应根据招标文件列出的配合服务内容,按专业工程估算造价的3%-5%计取",{"key":28,"text":187,"correct":22},"招标人自供材料、设备的，按材料、设备价值的2%计算",{"key":31,"text":189,"correct":22},"招标人自供材料、设备的，不应计入总承包服务费",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1139953,"经工程造价管理机构复查后，招标控制价复查结论与原公布的招标控制价误差大于（ ）的，应责成招标人改正。",[194,196,198,200],{"key":20,"text":195,"correct":26},"±3%",{"key":24,"text":197,"correct":22},"±4%",{"key":28,"text":199,"correct":22},"±5%",{"key":31,"text":201,"correct":22},"±6%",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1139954,"在施工过程中，施工图纸或设计变更与招标工程量清单项目特征描述不一致，发承包双方应按（ ）依据合同约定重新确定综合单价。",[206,208,210,212],{"key":20,"text":207,"correct":22},"清单中的项目特征",{"key":24,"text":209,"correct":22},"施工图纸",{"key":28,"text":211,"correct":22},"设计变更",{"key":31,"text":93,"correct":26},{"id":214,"libraryId":5,"type":215,"typeLabel":216,"stem":217,"options":218,"answer":227,"analysis":33},1139955,2,"多选题","根据《建设工程工程量清单计价规范》（GB50500-2013），投标人在投标报价时不得作为竞争性费用的是（ ）。",[219,220,221,223,224],{"key":20,"text":55,"correct":26},{"key":24,"text":51,"correct":26},{"key":28,"text":222,"correct":22},"二次搬运费",{"key":31,"text":53,"correct":22},{"key":225,"text":226,"correct":22},"E","分部分项工程费","AB",{"id":229,"libraryId":5,"type":215,"typeLabel":216,"stem":230,"options":231,"answer":242,"analysis":33},1139956,"根据《建设工程工程量清单计价规范》(GB50500—2013)，关于国有资金的投资项目招标控制价的说法，正确的有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"招标控制价可以在公布后上调或下浮",{"key":24,"text":235,"correct":26},"招标控制价是对招标工程限定的最高限价",{"key":28,"text":237,"correct":22},"国有资金的投资项目宜编制招标控制价",{"key":31,"text":239,"correct":26},"投标人的投标报价低于成本价的，其投标应予以拒绝",{"key":225,"text":241,"correct":26},"投标人的投标报价高于招标控制价的，其投标应予以拒绝","BDE",{"id":244,"libraryId":5,"type":215,"typeLabel":216,"stem":245,"options":246,"answer":256,"analysis":33},1139957,"在计算措施项目费时，可以采用综合单价法的是（ ）。",[247,249,251,253,254],{"key":20,"text":248,"correct":26},"混凝土模板工程",{"key":24,"text":250,"correct":26},"脚手架工程",{"key":28,"text":252,"correct":26},"垂直运输工程",{"key":31,"text":222,"correct":22},{"key":225,"text":255,"correct":22},"室内空气污染测试费","ABC",{"id":258,"libraryId":5,"type":215,"typeLabel":216,"stem":259,"options":260,"answer":270,"analysis":33},1139958,"下列选项中，属于其他项目费的是（ ）。",[261,263,264,266,268],{"key":20,"text":262,"correct":26},"暂列金额",{"key":24,"text":53,"correct":26},{"key":28,"text":265,"correct":22},"夜间施工增加费",{"key":31,"text":267,"correct":22},"工程定位复测费",{"key":225,"text":269,"correct":26},"计日工","ABE",{"id":272,"libraryId":5,"type":215,"typeLabel":216,"stem":273,"options":274,"answer":285,"analysis":33},1139959,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于投标人投标报价编制的说法，正确的有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"投标报价由投标人自主确定",{"key":24,"text":278,"correct":22},"投标报价应根据投标人的投标战略确定，必要的时候可以低于成本",{"key":28,"text":280,"correct":26},"投标人必须按招标工程量清单填报价格",{"key":31,"text":282,"correct":26},"招标文件中要求投标人承担的风险费用，投标人应在综合单价中予以考虑",{"key":225,"text":284,"correct":22},"投标人可以根据项目的复杂程度调整招标人清单中的暂列金额的大小","CD",{"id":287,"libraryId":5,"type":215,"typeLabel":216,"stem":288,"options":289,"answer":300,"analysis":33},1139960,"下列属于招标人编制招标控制价和投标人编制投标报价共同依据的是（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":26},"建设工程清单计价规范",{"key":24,"text":293,"correct":26},"招标文件及招标工程量清单",{"key":28,"text":295,"correct":22},"常规施工方案",{"key":31,"text":297,"correct":26},"市场信息或工程造价管理机构发布的造价信息",{"key":225,"text":299,"correct":22},"招标过程中的补充通知、答疑纪要","ABD",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},1139961,"某工程招标控制价为1000 万元，中标人的投标报价为940 万元，各投标人的平均报价为9600 万元，则承包人的报价浮动率为（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"4%",{"key":24,"text":308,"correct":22},"5%",{"key":28,"text":310,"correct":26},"6%",{"key":31,"text":312,"correct":22},"7%",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},1139962,"根据《建设工程施工合同（示范文本）》(GF-2017-0201)，工程预付款支付应按照专用合同的约定执行，但最迟支付的时间是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":22},"签订施工合同后30 天内",{"key":24,"text":320,"correct":26},"开工通知载明的开工日期7 天前",{"key":28,"text":322,"correct":22},"收到中标通知书并确认后30 天内",{"key":31,"text":324,"correct":22},"实际开工前14 天",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},1139963,"关于工程质量保证金的说法，正确的是（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"承包人已经提供履约担保的，发包人可以同时预留工程质量保证金",{"key":24,"text":332,"correct":22},"承包人提供质量保证金的方式优先采取按相应比例的工程款扣回",{"key":28,"text":334,"correct":26},"发包人累计扣留的质量保证金不得超过工程价款结算总额的3%",{"key":31,"text":336,"correct":22},"最终结清时，承包人被预留的质量保证金是抵减发包人工程缺陷维修费用的上限",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1139964,"根据《建设工程施工合同（示范文本）》(GF-2017-0201)，承包人应在收到变更指令后（ ）内向监理人提交变更估价申请。",[341,342,344,346],{"key":20,"text":105,"correct":22},{"key":24,"text":343,"correct":26},"14 天",{"key":28,"text":345,"correct":22},"21 天",{"key":31,"text":347,"correct":22},"28 天",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":28,"analysis":33},1139965,"根据《建设工程工程量清单计价规范》，某灌注桩计量支付条款约定工程量以米计算，若设计长度为20 米的钻孔灌注桩承包人做了21 米，事后书面向监理工程师申请并得到业主确认，则承包人可以得到（ ）米工程价款。",[352,354,355,357],{"key":20,"text":353,"correct":22},"19",{"key":24,"text":171,"correct":22},{"key":28,"text":356,"correct":26},"21",{"key":31,"text":358,"correct":22},"22",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1139966,"施工过程中发生的计日工没有相应单价的，应如何处理（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":26},"发承包双方按合理的成本加利润重新商定综合单价",{"key":24,"text":366,"correct":22},"计日工发生时承包人提出的综合单价",{"key":28,"text":368,"correct":22},"计日工发生当月市场人工工资单价",{"key":31,"text":370,"correct":22},"计日工发生当月造价管理部门发布的人工指导价",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1139967,"根据《建设工程量清单计价规范》(GB50500-2013)，关于提前竣工的说法，正确的是（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":26},"招标人压缩的工期天数一般不得超过定额工期的20%",{"key":24,"text":378,"correct":22},"工程实施过程中，发包人要求合同工程提前竣工，可以不征求承包意见",{"key":28,"text":380,"correct":22},"发承包双方约定提前竣工每日历天应补偿额度，与计日工签证一并支付",{"key":31,"text":382,"correct":22},"赶工费用包括人工费、材料费、机械费以及合理的利润",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1139968,"某工程在保修期内，因工程质量问题导致卫生间漏雨，发包人多次通知承包人进行维修，但承包人不予理睬，此时发包人可以采取的恰当做法是（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"自行维修，维修费由发包人承担",{"key":24,"text":390,"correct":26},"自行维修，维修费由承包人承担",{"key":28,"text":392,"correct":22},"委托第三方进行维修，维修费由发包人承担",{"key":31,"text":394,"correct":22},"委托第三方进行维修，维修费由工程实际使用人承担",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1139969,"索赔费用的计算方法不包括（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"实际费用法",{"key":24,"text":402,"correct":22},"总费用法",{"key":28,"text":404,"correct":22},"修正总费用法",{"key":31,"text":406,"correct":26},"概算定额法",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},1139970,"根据《建设工程施工合同（示范文本）》(GF-2017-0201)，监理人未按合同约定时间对承包人提交的已完工程量报告进行核实的，则应采取的做法是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"要求承包人重新提交已完工程量报告",{"key":24,"text":414,"correct":26},"将计量报告中所列的工程量视为承包人实际完成的工程量",{"key":28,"text":416,"correct":22},"要求承包人提交证明已完工程量属实的证明材料",{"key":31,"text":418,"correct":22},"将计量报告中所列的工程量的80%视为承包人实际完成的工程量",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":24,"analysis":33},1139971,"在国际工程项目建筑安装工程费用中，包括在合同中的暂定金额是（ ）的备用金。",[423,425,427,429],{"key":20,"text":424,"correct":22},"承包方",{"key":24,"text":426,"correct":26},"业主方",{"key":28,"text":428,"correct":22},"供货方",{"key":31,"text":430,"correct":22},"咨询方",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1139972,"根据《建设工程施工合同（示范文本）》发包人累计扣留的质量保证金不得超过工程价款结算总额的（ ）。",[435,437,439,440],{"key":20,"text":436,"correct":22},"1%",{"key":24,"text":438,"correct":26},"3%",{"key":28,"text":308,"correct":22},{"key":31,"text":441,"correct":22},"10%",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},1139973,"某工程在施工过程中,因不可抗力造成损失，造成永久工程损失26 万元、承包人受伤人员医药费4.5 万元、承包人施工机具损坏损失12 万元、停工期间按照发包人要求清理和修复工程的费用3.5 万元。承包人及时向项目监理机构提出了索赔申请，承包人可以获得的索赔金额为（ ）万元。",[446,448,450,452],{"key":20,"text":447,"correct":22},"46",{"key":24,"text":449,"correct":22},"42.5",{"key":28,"text":451,"correct":22},"33",{"key":31,"text":453,"correct":26},"29.5",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1139974,"下列不属于导致工程量清单缺项原因的是（ ）。",[458,459,461,463],{"key":20,"text":211,"correct":22},{"key":24,"text":460,"correct":22},"工程量清单编制错误",{"key":28,"text":462,"correct":26},"施工方案调整",{"key":31,"text":464,"correct":22},"施工条件改变",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},1139975,"某独立土方工程，根据《建设工程工程量清单规范》（GB50500-2013），签订了施工合同，招标工程量为3000 ㎡，承包人标书中土方工程报价为55 元\u002F㎡。合同约定：当实际工程量超过估计工程量15%时，超过部分工程量单价调整为50 元\u002F㎡。工程结束时实际完成并经监理确认的土方工程为4500m3，则土方工程总价为（ ）元。",[469,471,473,475],{"key":20,"text":470,"correct":26},"242250",{"key":24,"text":472,"correct":22},"240000",{"key":28,"text":474,"correct":22},"247500",{"key":31,"text":476,"correct":22},"225000",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1139976,"关于安全文明费的支付，除专用合同条款另有约定外，下列说法正确的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"发包人应在开工前28 内预付安全文明施工费总额的50%",{"key":24,"text":484,"correct":22},"发包人逾期支付安全文明施工费超过7 天的，承包人有权暂停施工",{"key":28,"text":486,"correct":22},"安全文明施工费承包人承担，承包人不得以任何形式扣减该部分费用",{"key":31,"text":488,"correct":26},"承包人对安全文明施工费应专款专用，承包人应在财务账目中单独列项备查,不得挪作他用",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1139977,"某工程合同价为300 万元，本期完成合同价款100 万元，合同约定：采用调值公式进行动态结算，其中固定要素比重为0.2，调价要素分为 A、 B、C 三类，分别占合同价的比重为0.15、0.35、0.3，结算时价格指数分别增长了20%、15%、25%，则调整后的本期合同价款额为（ ）万元。",[493,495,497,499],{"key":20,"text":494,"correct":26},"115.75",{"key":24,"text":496,"correct":22},"116.24",{"key":28,"text":498,"correct":22},"119.75",{"key":31,"text":500,"correct":22},"120.75",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":28,"analysis":33},1139978,"根据《建设工程施工合同（示范文本）》，发生工程变更的，承包人应在收到变更指示后（ ）内，向监理人提交变更估价申请。",[505,506,507,509],{"key":20,"text":137,"correct":22},{"key":24,"text":135,"correct":22},{"key":28,"text":508,"correct":26},"14",{"key":31,"text":510,"correct":22},"15",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1139979,"增加工作内容产生的人工费应按（ ）计算。",[515,517,518,520],{"key":20,"text":516,"correct":22},"窝工费",{"key":24,"text":269,"correct":26},{"key":28,"text":519,"correct":22},"补贴费",{"key":31,"text":521,"correct":22},"加班费",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1139980,"下列选项中，关于安全文明施工费的说法，正确的是（ ）。",[526,527,529,531],{"key":20,"text":484,"correct":22},{"key":24,"text":528,"correct":22},"发包人应在开工后的28 天内预付安全文明施工费总额的60%",{"key":28,"text":530,"correct":22},"安全文明施工费由承包人承担",{"key":31,"text":532,"correct":26},"基准日后合同所适用的法律发生变化，增加的安全文明施工费由发包人承担",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1139981,"根据《建设工程施工合同（建设工程施工合同（示范文本）》（GF-2017-0201），合同约定按照价格调整公式对人工费、材料费、机械费的价格变化进行调整，承包人原因导致工程延误期间的价格调整说法正确的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"应使用计划竣工日期价格进行结算",{"key":24,"text":540,"correct":22},"应使用实际竣工日期的价格进行结算",{"key":28,"text":542,"correct":22},"应使用计划竣工日期和实际竣工日期价格中较高的一个进行结算",{"key":31,"text":544,"correct":26},"应使用计划竣工日期和实际竣工日期价格中较低的一个进行结算",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1139982,"某工程项目预付款120 万元，合同约定：每月进度款按结算价的80%支付；每月支付安全文明施工费20 万元；预付款从开工的第4 个月起分3 个月等额扣回，开工前6 个月结算价如下表，则第4 个月应支付的款项为（ ）万元。",[549,551,553,555],{"key":20,"text":550,"correct":22},"212",{"key":24,"text":552,"correct":22},"192",{"key":28,"text":554,"correct":26},"172",{"key":31,"text":556,"correct":22},"152",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":31,"analysis":33},1139983,"发包人和监理人均可以提出变更，但是变更指示均通过（ ）发出。",[561,563,565,567],{"key":20,"text":562,"correct":22},"建设单位",{"key":24,"text":564,"correct":22},"施工单位",{"key":28,"text":566,"correct":22},"设计单位",{"key":31,"text":568,"correct":26},"监理人",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},1139984,"根据《建设工程施工合同（示范文本）》(GF-2017-0201)，除专用合同条款另有约定的外，因工程量变化引起的综合单价调整应支付的时间是（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"变更事项完成后，立即支付",{"key":24,"text":576,"correct":22},"计入最终的结算款中支付",{"key":28,"text":578,"correct":26},"计入最近的一期进度款中支付",{"key":31,"text":580,"correct":22},"与最终索赔款项一起支付",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1139985,"某项目实际工程量相比清单工程量的减少了16%，招标控制价的综合单价为400 元，投标报价的综合单价为300 元，该工程投标报价下浮率为6%，则该工程的综合单价应（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"不做调整",{"key":24,"text":588,"correct":26},"调整为319.6 元",{"key":28,"text":590,"correct":22},"调整为239.7 元",{"key":31,"text":592,"correct":22},"调整为460 元",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},1139986,"根据《建设工程工程量清单计价规范》(GB50500-2013)，因不可抗力事件导致的损害及其费用增加，应由承包人承担的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"工程本身的损害",{"key":24,"text":600,"correct":22},"发包人现场的人员伤亡",{"key":28,"text":602,"correct":22},"已运至现场的水泥",{"key":31,"text":604,"correct":26},"承包人施工设备的损坏",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":24,"analysis":33},1139987,"下列选项中，关于设备费的索赔，说法不正确的是（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"工作内容增加引起的索赔，设备费的标准按机械台班费计算",{"key":24,"text":612,"correct":26},"窝工引起的索赔，按台班折旧费计算",{"key":28,"text":614,"correct":22},"发包人未按约定时间付款的，应按约定利率支付迟延付款的利息",{"key":31,"text":616,"correct":22},"工作变更引起的索赔，承包人可按原报价单中的利润百分率计算利润",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":28,"analysis":33},1139988,"根据《建设工程施工合同（示范文本）》(GF-2017-0201)，除专用合同条款另有约定的外，承包人提供的质量保证金的方式优先采用（ ）。",[621,623,625,627],{"key":20,"text":622,"correct":22},"相应比例的工程款",{"key":24,"text":624,"correct":22},"双方约定的其他方式",{"key":28,"text":626,"correct":26},"质量保证金保函",{"key":31,"text":628,"correct":22},"相应数额的银行存款证明",[630,633,636,639,642,645],{"id":15,"name":631,"category":7,"favorite":632},"领导干部任职前廉政法规知识测试题",92,{"id":634,"name":635,"category":7,"favorite":15},595,"建筑结构与设备",{"id":637,"name":638,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":640,"name":641,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":643,"name":644,"category":7,"favorite":8},534,"BIM工程师",{"id":646,"name":644,"category":7,"favorite":8},535]