[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":655},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,45,50,2696,[13,34,46,64,79,94,109,124,138,148,160,172,184,196,208,220,232,244,256,268,283,298,310,322,334,346,355,367,382,397,411,420,432,442,454,469,481,493,505,517,529,544,559,571,583,595,607,619,631,643],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1139888,1,"单选题","下列选项中，属于建设投资中动态投资的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","建筑安装工程费",false,{"key":24,"text":25,"correct":22},"B","设备及工器具购置费",{"key":27,"text":28,"correct":22},"C","铺底流动资金",{"key":30,"text":31,"correct":32},"D","价差预备费",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1139889,"某建设项目，建设期两年，共向银行贷款2000 万元，每年使用1000 万元，按年均衡发放贷款，银行贷款年利润5%，则在编制投资估算时建设期利息应为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":32},"101.25",{"key":24,"text":41,"correct":22},"102.50",{"key":27,"text":43,"correct":22},"126.25",{"key":30,"text":45,"correct":22},"127.50",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1139890,2,"多选题","施工机械使用费包括（ ）。",[52,54,56,58,60],{"key":20,"text":53,"correct":22},"大型机械设备进出场及安拆费",{"key":24,"text":55,"correct":32},"机械操作人员工资",{"key":27,"text":57,"correct":32},"机械经常修理费",{"key":30,"text":59,"correct":22},"仪器仪表使用费",{"key":61,"text":62,"correct":22},"E","工伤保险","BC",{"id":65,"libraryId":5,"type":48,"typeLabel":49,"stem":66,"options":67,"answer":78,"analysis":33},1139891,"估算建设项目设备购置费时，可以作为设备原价的有（ ）。",[68,70,72,74,76],{"key":20,"text":69,"correct":22},"国产标准设备成本价",{"key":24,"text":71,"correct":32},"国产标准设备出厂价",{"key":27,"text":73,"correct":32},"国产标准设备订货合同价",{"key":30,"text":75,"correct":32},"进口设备抵岸价",{"key":61,"text":77,"correct":22},"进口设备出厂价","BCD",{"id":80,"libraryId":5,"type":48,"typeLabel":49,"stem":81,"options":82,"answer":93,"analysis":33},1139892,"编制施工机械台班使用定额时，属于机械工作时间中损失时间的有（ ）。",[83,85,87,89,91],{"key":20,"text":84,"correct":32},"施工本身原因造成的停工时间",{"key":24,"text":86,"correct":32},"非施工原因造成的停工时间",{"key":27,"text":88,"correct":32},"违反劳动纪律引起的时间损失",{"key":30,"text":90,"correct":22},"工人正常的休息时间",{"key":61,"text":92,"correct":32},"低负荷下的工作时间","ABCE",{"id":95,"libraryId":5,"type":48,"typeLabel":49,"stem":96,"options":97,"answer":108,"analysis":33},1139893,"根据《建设工程工程量清单计价规范》GB50500-2013，属于规费的是（ ）。",[98,100,102,104,106],{"key":20,"text":99,"correct":32},"住房公积金",{"key":24,"text":101,"correct":32},"失业保险费",{"key":27,"text":103,"correct":32},"医疗保险费",{"key":30,"text":105,"correct":32},"工伤保险费",{"key":61,"text":107,"correct":22},"劳动保险费","ABCD",{"id":110,"libraryId":5,"type":48,"typeLabel":49,"stem":111,"options":112,"answer":123,"analysis":33},1139894,"流动资金的估算方法包括（ ）。",[113,115,117,119,121],{"key":20,"text":114,"correct":22},"概算定额法",{"key":24,"text":116,"correct":22},"概算指标法",{"key":27,"text":118,"correct":32},"扩大指标估算法",{"key":30,"text":120,"correct":32},"分项详细估算法",{"key":61,"text":122,"correct":22},"类似工程预算法","CD",{"id":125,"libraryId":5,"type":48,"typeLabel":49,"stem":126,"options":127,"answer":93,"analysis":33},1139895,"根据《建设工程工程量清单计价规范》GB50500-2013，施工仪器仪表台班单价包括的是（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":32},"维护费",{"key":24,"text":131,"correct":32},"校验费",{"key":27,"text":133,"correct":32},"动力费",{"key":30,"text":135,"correct":22},"修理费",{"key":61,"text":137,"correct":32},"折旧费",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":24,"analysis":33},1139896,"施工中发生的下列与材料有关的费用，不属于建筑安装工程费中的施工机械使用费的是（ ）。",[142,143,144,146],{"key":20,"text":137,"correct":22},{"key":24,"text":53,"correct":32},{"key":27,"text":145,"correct":22},"操作机械的司机的工资",{"key":30,"text":147,"correct":22},"机械设备日常保养所需的材料费用",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},1139897,"企业发放给员工的防暑降温饮料的费用应在（ ）列支。",[152,154,156,158],{"key":20,"text":153,"correct":32},"劳动保护费",{"key":24,"text":155,"correct":22},"职工福利费",{"key":27,"text":157,"correct":22},"财务费用",{"key":30,"text":159,"correct":22},"工会经费",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},1139898,"以扩大的分部分项工程为对象编制的定额是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"施工定额",{"key":24,"text":167,"correct":22},"预算定额",{"key":27,"text":169,"correct":32},"概算定额",{"key":30,"text":171,"correct":22},"概算指标",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},1139899,"编制和应用施工定额之所以有利于推广先进技术是因为（ ）。",[176,178,180,182],{"key":20,"text":177,"correct":32},"施工定额水平本身包含成熟先进的施工技术",{"key":24,"text":179,"correct":22},"施工定额的是强制实施的",{"key":27,"text":181,"correct":22},"施工定额是工程定额体系的基础",{"key":30,"text":183,"correct":22},"施工定额是用先进的技术方法测定出来的",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},1139900,"某项目进行砖砌工程施工，标准砖的总消耗量为1000 块，标准砖砌筑的损耗率为5%，则标准砖的净用量为（ ）块。",[188,190,192,194],{"key":20,"text":189,"correct":22},"950",{"key":24,"text":191,"correct":32},"953",{"key":27,"text":193,"correct":22},"1000",{"key":30,"text":195,"correct":22},"900",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":30,"analysis":33},1139901,"编制机械台班使用定额时，属于非施工本身造成的停工时间的是（ ）。",[200,202,204,206],{"key":20,"text":201,"correct":22},"筑路机在工作区末端调头的无负荷工作时间",{"key":24,"text":203,"correct":22},"把灰浆泵从一个工作地点转移到另一工作地点的工作中断时间",{"key":27,"text":205,"correct":22},"由于未及时供给机械燃料而引起的停工时间",{"key":30,"text":207,"correct":32},"暴雨引起的压路机的停工时间",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":30,"analysis":33},1139902,"某机械台班产量为12m3，与之配合的工人小组由5 人组成，则完成单位产品的人工时间定额为（ ）工日\u002F m3。",[212,214,216,218],{"key":20,"text":213,"correct":22},"0.17",{"key":24,"text":215,"correct":22},"0.27",{"key":27,"text":217,"correct":22},"0.40",{"key":30,"text":219,"correct":32},"0.42",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":27,"analysis":33},1139903,"概算定额是以（ ）为对象编制的定额。",[224,226,228,230],{"key":20,"text":225,"correct":22},"工序",{"key":24,"text":227,"correct":22},"建筑物或构筑物各分部分项工程",{"key":27,"text":229,"correct":32},"扩大的分部分项工程",{"key":30,"text":231,"correct":22},"整个建筑物和构筑物",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":24,"analysis":33},1139904,"某混凝土构件采用木模板施工，木模板一次净用量为200 ㎡，现场制作安装不可避免的损耗率为2％，木模板可周转使用5 次，每次补损率为5％，则木模板的周转使用量为（ ）㎡。",[236,238,240,242],{"key":20,"text":237,"correct":22},"48.00",{"key":24,"text":239,"correct":32},"48.96",{"key":27,"text":241,"correct":22},"49.44",{"key":30,"text":243,"correct":22},"51.00",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},1139905,"下列不属于编制人工定额时需要拟定正常的施工作业条件的是（ ）。",[248,250,252,254],{"key":20,"text":249,"correct":32},"拟定施工作业的时间",{"key":24,"text":251,"correct":22},"拟定施工作业的内容",{"key":27,"text":253,"correct":22},"拟定施工作业地点的组织",{"key":30,"text":255,"correct":22},"拟定施工作业人员的组织",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1139906,"完成某预算定额项目单位工程量的基本用工为5.6 工日，辅助用工为1.4 工日，超运距用工为1.8 工日，人工幅度差系数为10%，该定额的人工工日消耗量为（ ）工日。",[260,262,264,266],{"key":20,"text":261,"correct":32},"9.68",{"key":24,"text":263,"correct":22},"9.50",{"key":27,"text":265,"correct":22},"9.12",{"key":30,"text":267,"correct":22},"9.36",{"id":269,"libraryId":5,"type":48,"typeLabel":49,"stem":270,"options":271,"answer":282,"analysis":33},1139907,"编制预算定额人工消费指标时，下列人工消耗量属于人工幅度差用工的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":32},"施工过程中工种之间交叉作业造成的不可避免的剔凿、修复、清理等用工",{"key":24,"text":275,"correct":32},"隐蔽工程验收影响的操作时间",{"key":27,"text":277,"correct":32},"施工过程中水电维修用工",{"key":30,"text":279,"correct":22},"现场材料加工用工",{"key":61,"text":281,"correct":22},"现场筛砂子增加的用工量","ABC",{"id":284,"libraryId":5,"type":48,"typeLabel":49,"stem":285,"options":286,"answer":297,"analysis":33},1139908,"下列方法中，属于人工定额的制定方法的是（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":32},"技术测定法",{"key":24,"text":290,"correct":22},"图纸计算法",{"key":27,"text":292,"correct":32},"统计分析法",{"key":30,"text":294,"correct":22},"理论计算法",{"key":61,"text":296,"correct":32},"经验估计法","ACE",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1139910,"采用定额单价法计算工程费用时，若分项工程的主要材料品种与定额单价中规定材料不一致，对定额的处理方法是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"直接套用定额单价",{"key":24,"text":305,"correct":32},"按实际使用材料价格换算定额单价",{"key":27,"text":307,"correct":22},"调整材料用量不换价",{"key":30,"text":309,"correct":22},"编制补充定额单价",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1139911,"某建筑工程施工图预算审查过程中将底层建筑面积编为一组，先计算底层建筑面积或楼(地)面面积从而得知楼面找平层、天棚抹灰的工程量等，该种审查方法是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"全面审查法",{"key":24,"text":317,"correct":32},"分组计算审查法",{"key":27,"text":319,"correct":22},"对比审查法",{"key":30,"text":321,"correct":22},"重点审查法",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1139912,"关于设计概算的说法，错误的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":32},"设计概算是对建设项目从设计至竣工交付使用所需全部费用进行的概略计算",{"key":24,"text":329,"correct":22},"批准初步设计及总概算,一经上级批准,总概算就是总造价的最高限额,不得任意突破,如有突破须报原审批部门批准",{"key":27,"text":331,"correct":22},"设计概算可分为单位工程概算、单项工程综合概算和建设工程项目总概算三级",{"key":30,"text":333,"correct":22},"概算总投资超过原批准投资估算10%以上,应进一步审查超估算的原因",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1139913,"设计概算是设计单位编制和确定的建设工程项目从（ ）至（ ）所需全部费用的文件。",[338,340,342,344],{"key":20,"text":339,"correct":22},"筹建，办理完竣工决算",{"key":24,"text":341,"correct":32},"筹建，竣工交付使用",{"key":27,"text":343,"correct":22},"设计，项目报废",{"key":30,"text":345,"correct":22},"设计，施工保修期满",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1139914,"某单位建筑工程初步设计达到一定深度，建筑结构比较明确时，编制该工程设计概算宜采用的方法（ ）。",[350,351,352,353],{"key":20,"text":114,"correct":32},{"key":24,"text":116,"correct":22},{"key":27,"text":122,"correct":22},{"key":30,"text":354,"correct":22},"扩大单价法",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},1139915,"某新建设项目建筑面积300 ㎡，按概算指标和地区材料预算单价等算出一般土建工程单位造价为720 元（管理费、利润、规费、税金综合费率20%）。但新建项目的设计资料与概算指标相比，其结构中有部分变更：设计资料中外墙1 砖厚，预算单价150 元\u002Fm3,而概算指标中外墙1 砖厚，预算单价165 元\u002Fm3，设计资料中每100 ㎡建筑面积含外墙60m3，而概算指标中含50m3，其余条件不考虑，则调整后的一般土建工程概算单价为（ ）元\u002F㎡。",[359,361,363,365],{"key":20,"text":360,"correct":22},"592.50",{"key":24,"text":362,"correct":32},"729.00",{"key":27,"text":364,"correct":22},"730.8",{"key":30,"text":366,"correct":22},"772.5",{"id":368,"libraryId":5,"type":48,"typeLabel":49,"stem":369,"options":370,"answer":381,"analysis":33},1139916,"建设项目总概算书的内容有编制说明和（ ）。",[371,373,375,377,379],{"key":20,"text":372,"correct":32},"单位工程概算表",{"key":24,"text":374,"correct":22},"分部分项工程概算表",{"key":27,"text":376,"correct":32},"单项工程综合概算表",{"key":30,"text":378,"correct":32},"工程建设其他费用概算表",{"key":61,"text":380,"correct":32},"总概算表7","ACDE",{"id":383,"libraryId":5,"type":48,"typeLabel":49,"stem":384,"options":385,"answer":396,"analysis":33},1139917,"下列选项中，属于建筑单位工程概算的是（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":32},"弱电工程概算",{"key":24,"text":389,"correct":32},"一般土建工程概算",{"key":27,"text":391,"correct":22},"机械设备及安装工程概算",{"key":30,"text":393,"correct":32},"电气照明工程概算",{"key":61,"text":395,"correct":22},"工器具及生产家具购置费用概算","ABD",{"id":398,"libraryId":5,"type":48,"typeLabel":49,"stem":399,"options":400,"answer":108,"analysis":33},1139918,"关于设计概算的作用，下列说法正确的是（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":32},"建设工程项目年度计划的安排、其投资需要量的确定、建设物资供应计划和建筑安装施工计划的依据",{"key":24,"text":404,"correct":32},"设计概算是进行贷款的依据",{"key":27,"text":406,"correct":32},"设计概算是编制招标控制价和招标标底的依据",{"key":30,"text":408,"correct":32},"设计概算是考核设计方案的经济合理性和控制施工图预算和施工图设计的依据",{"key":61,"text":410,"correct":22},"设计概算是编制概算定额的依据",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":27,"analysis":33},1139919,"当初步设计达到一定深度，可以准确计算工程量时，可采用的最准确的编制单位建筑工程概算的方法是（ ）。",[415,416,417,418],{"key":20,"text":122,"correct":22},{"key":24,"text":171,"correct":22},{"key":27,"text":169,"correct":32},{"key":30,"text":419,"correct":22},"预算单价法",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},1139920,"实物量法和定额单价法在编制施工图预算的主要区别在于（ ）不同。",[424,426,428,430],{"key":20,"text":425,"correct":22},"依据的定额",{"key":24,"text":427,"correct":22},"工程量的计算规则",{"key":27,"text":429,"correct":32},"人工费、材料费、施工机具使用费的计算",{"key":30,"text":431,"correct":22},"确定利润的方法",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":20,"analysis":33},1139921,"施工图预算审查时，将分部分项工程的单位建筑面积指标总结归纳为工程量、价格、用工三个单方基本指标，然后利用这些基本指标对拟建项目分部分项工程预算进行审查的方法称为（ ）。",[436,438,439,440],{"key":20,"text":437,"correct":32},"筛选审查法",{"key":24,"text":319,"correct":22},{"key":27,"text":317,"correct":22},{"key":30,"text":441,"correct":22},"逐项审查法",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},1139922,"采用定额单价法编制施工图预算时，出现分项工程的主要材料品种与预算单价或地区单位估价表中规定的材料不一致时，正确的处理方式是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"不可以直接套用预算单价，应根据实际使用材料编制补充定额单价",{"key":24,"text":449,"correct":22},"直接套用预算单价，不考虑材料品种差异的影响",{"key":27,"text":451,"correct":22},"直接套用预算单价，根据实际使用材料对材料数量进行调整",{"key":30,"text":453,"correct":32},"不可以直接套用预算单价，需要按实际使用材料价格换算定额单价",{"id":455,"libraryId":5,"type":48,"typeLabel":49,"stem":456,"options":457,"answer":468,"analysis":33},1139923,"下列关于施工图预算对于施工单位的作用的说法，正确的有（ ）。",[458,460,462,464,466],{"key":20,"text":459,"correct":32},"施工图预算是确定投标报价的依据",{"key":24,"text":461,"correct":32},"施工图预算是进行施工准备的依据",{"key":27,"text":463,"correct":22},"施工图预算是报审项目投资额的依据",{"key":30,"text":465,"correct":22},"施工图预算是监督检查执行定额标准的依据",{"key":61,"text":467,"correct":32},"施工图预算是控制施工成本的依据","ABE",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},1139924,"根据《建设工程量清单计价规范》(GB50500-2013)编制的工程量清单中，某分部分项工程的项目编码010302004005，则“01”的含义是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"分项工程顺序码",{"key":24,"text":476,"correct":22},"分部工程顺序码",{"key":27,"text":478,"correct":22},"专业工程顺序码",{"key":30,"text":480,"correct":32},"国家计量规范代码",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":27,"analysis":33},1139925,"根据《建设工程工程量清单计价规范》（GB50500-2013）编制措施清单项目时，下面说法正确的是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"参考拟建工程的常规施工技术方案，以确定环境保护、安全文明施工等项目",{"key":24,"text":488,"correct":22},"措施项目清单的编制应考虑建设单位的实际情况",{"key":27,"text":490,"correct":32},"措施项目清单的编制应考虑招标文件中需要通过一定技术措施才能实现的要求",{"key":30,"text":492,"correct":22},"参考拟建工程的常规施工组织设计，以确定混凝土模板及支架、脚手架等项目",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1139926,"下列选项中，可以作为清单中计量单位的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":32},"项",{"key":24,"text":500,"correct":22},"10 个",{"key":27,"text":502,"correct":22},"100 ㎡",{"key":30,"text":504,"correct":22},"10 ㎡",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},1139927,"根据《建筑工程工程量清单计价规范》（GB50500-2013），分部分项工程量清单中项目名称确定方法正确的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"以工程实体命名",{"key":24,"text":512,"correct":22},"按照《计量规范》中规定的项目名称确定",{"key":27,"text":514,"correct":32},"根据《计量规范》的项目名称结合拟建工程的实际确定",{"key":30,"text":516,"correct":22},"根据工程经验确定",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},1139928,"根据《建设工程工程量清单计价规范》（GB50500-2013），编制投标文件时，招标文件中已提供暂估价的材料价格应根据（ ）计入综合单价。",[521,523,525,527],{"key":20,"text":522,"correct":22},"投标人自主确定价格",{"key":24,"text":524,"correct":22},"投标时当地的市场价格",{"key":27,"text":526,"correct":32},"招标文件列出的单价",{"key":30,"text":528,"correct":22},"政府主管部门公布的价格",{"id":530,"libraryId":5,"type":48,"typeLabel":49,"stem":531,"options":532,"answer":543,"analysis":33},1139929,"根据《建设工程工程量清单计价规范》（GB50500-2013），下列属于工程量清单编制的依据的是（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":32},"拟定的招标文件",{"key":24,"text":536,"correct":22},"类似项目的投标文件",{"key":27,"text":538,"correct":32},"行业主管部门颁发的计价定额和方法",{"key":30,"text":540,"correct":32},"工程特点及常规的施工方案",{"key":61,"text":542,"correct":22},"工程造价管理机构发布的工程造价信息及相关市场价格","ACD",{"id":545,"libraryId":5,"type":48,"typeLabel":49,"stem":546,"options":547,"answer":558,"analysis":33},1139930,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程量清单编制的说法，正确的是（ ）。",[548,550,552,554,556],{"key":20,"text":549,"correct":22},"使用国有资金投资的建设工程发承包，宜采用工程量清单计价",{"key":24,"text":551,"correct":22},"投标人按照工程量清单所表述的内容,依据企业定额计算投标价格,自主填报工程量清单所列项目的工程量、单价与合价",{"key":27,"text":553,"correct":32},"工程量清单是工程付款和结算的依据",{"key":30,"text":555,"correct":32},"工程量清单是调整工程价款、处理工程索赔的依据",{"key":61,"text":557,"correct":32},"招标工程量清单必须作为招标文件的组成部分，由招标人提供，并对其准确性和完整性负责","CDE",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":30,"analysis":33},1139931,"某采用工程量清单计价的招标工程，工程量清单中挖土方的工程量为1300 立方米，投标人甲根据其施工方案估算的挖土方工程量为1500 立方米，人、料、机费为60000 元，管理费为34000 元，利润为20000 元，投标人应承担的风险费用4000 元，则投标人甲填报的综合单价应为（ ）元\u002F立方米。",[563,565,567,569],{"key":20,"text":564,"correct":22},"72.30",{"key":24,"text":566,"correct":22},"78.67",{"key":27,"text":568,"correct":22},"78.46",{"key":30,"text":570,"correct":32},"90.77",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1139932,"综合单价的计算步骤包括：①计算清单项目的管理费和利润；②计算定额子目工程量③确定组合定额子目；④计算清单项目的综合单价；⑤测算人料机消耗量；⑥确定人、料、机单价；⑦计算人料机总费用。则排列正确的是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":32},"③②⑤⑥⑦①④",{"key":24,"text":578,"correct":22},"③⑤⑥②①⑦④",{"key":27,"text":580,"correct":22},"⑤⑥②①⑦④③",{"key":30,"text":582,"correct":22},"⑤①⑦④⑤⑥②",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},1139933,"下列选项中，应采用分包法计价的措施项目费是（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":32},"室内空气污染测试",{"key":24,"text":590,"correct":22},"二次搬运费",{"key":27,"text":592,"correct":22},"混凝土模板工程",{"key":30,"text":594,"correct":22},"安全文明施工费",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":27,"analysis":33},1139934,"下列选项中，关于清单计价的表达式书写错误的是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"工料单价=人工费+材料费+施工机具使用费",{"key":24,"text":602,"correct":22},"全费用综合单价=人工费+材料费+施工机具使用费+管理费+利润+规费+税金",{"key":27,"text":604,"correct":32},"措施项目费=Σ措施项目工程量×措施项目综合单价",{"key":30,"text":606,"correct":22},"单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":20,"analysis":33},1139935,"根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程量清单的说法，不正确的是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":32},"措施项目费都应该以“项”为计量单位",{"key":24,"text":614,"correct":22},"同一招标工程的项目编码不能重复",{"key":27,"text":616,"correct":22},"施工单位投标报价时清单项目的工程量不可以更改",{"key":30,"text":618,"correct":22},"暂列金额可以用于施工中可能发生工程变更时的工程价款调整",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":24,"analysis":33},1139936,"下列选项中，关于风险率的说法不正确的是（ ）。",[623,625,627,629],{"key":20,"text":624,"correct":22},"招标文件中要求投标人承担的风险费用，投标人应在综合单价中予以考虑",{"key":24,"text":626,"correct":32},"招标文件中未明确投标人要承担风险，投标人可完全不考虑风险费",{"key":27,"text":628,"correct":22},"风险费通常以风险费率的形式进行计算",{"key":30,"text":630,"correct":22},"当出现的风险内容在招标文件规定的风险范围内时，合同价款不做调整",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":24,"analysis":33},1139937,"承包人为协调、配合发包人所产生的费用应计入（ ）。",[635,637,639,641],{"key":20,"text":636,"correct":22},"计日工",{"key":24,"text":638,"correct":32},"总承包服务费",{"key":27,"text":640,"correct":22},"暂列金额",{"key":30,"text":642,"correct":22},"暂估价",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":20,"analysis":33},1139938,"若施工招标文件和中标人投标文件对工程质量标准的定义不一致，则签施工合同时，工程质量标准约定应以（ ）为准。",[647,649,651,653],{"key":20,"text":648,"correct":32},"中标人投标文件",{"key":24,"text":650,"correct":22},"双方重新协商的结果",{"key":27,"text":652,"correct":22},"招标文件",{"key":30,"text":654,"correct":22},"中标通知书",[656,659,662,665,668,671],{"id":15,"name":657,"category":7,"favorite":658},"领导干部任职前廉政法规知识测试题",92,{"id":660,"name":661,"category":7,"favorite":15},595,"建筑结构与设备",{"id":663,"name":664,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":666,"name":667,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":669,"name":670,"category":7,"favorite":8},534,"BIM工程师",{"id":672,"name":670,"category":7,"favorite":8},535]