[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-41":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":630},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,41,50,2696,[13,34,42,54,66,78,96,106,118,130,142,154,166,181,193,205,216,228,243,255,267,279,294,306,318,330,344,352,364,376,388,403,418,430,442,454,466,478,490,502,512,521,536,547,562,574,586,598,606,618],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1139683,1,"单选题","根据《建设工程工程量清单计价规范》（GB50500-2013），当合同中没有约定时，对于任一招标工程量清单项目，如果因工程变更等原因导致工程量差超过（ ）时，合同单价应进行调整。 (2014)",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","20%",false,{"key":24,"text":25,"correct":26},"B","15%",true,{"key":28,"text":29,"correct":22},"C","10%",{"key":31,"text":32,"correct":22},"D","5%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1139684,"根据《建设工程工程量清单计价规范》（GB50500-2013)，若合同未约定，当工程量清单项目的清单工程量偏差在（）以内时，其综合单价不作调整，执行清单原有的综合单价. (2013)",[38,39,40,41],{"key":20,"text":25,"correct":26},{"key":24,"text":32,"correct":22},{"key":28,"text":29,"correct":22},{"key":31,"text":21,"correct":22},{"id":43,"libraryId":5,"type":15,"typeLabel":16,"stem":44,"options":45,"answer":20,"analysis":33},1139685,"某独立土方工程，根据《建设工程工程量清单计价规范》（GB50500-2013），签订了固定单价合同，招标工程量为3000m3，承包人标书中土方工程报价为55元m3。合同约定：当实际工程量超过估计工程量15%时，超过部分工程量单价调整为50元\u002F3。工程结束时实际完成并经监理确认的土方工程为4500m3，则土方工程总价为（ ）。（2016）",[46,48,50,52],{"key":20,"text":47,"correct":26},"242250",{"key":24,"text":49,"correct":22},"240000",{"key":28,"text":51,"correct":22},"247500",{"key":31,"text":53,"correct":22},"225000",{"id":55,"libraryId":5,"type":15,"typeLabel":16,"stem":56,"options":57,"answer":28,"analysis":33},1139686,"根据《建设工程工程清单计价规范》（GB50500-2013），采用清单计价的某部分分项工程，招标控 制价的综合单价为350元，承包人投标报价的综合单价为300元，该工程投标报价总价的下浮率为5%，结 算时，该部分分项工程工程量清单工程质量增加了16%，且合同未确定综合单价调整方法，则对该综合 单价的正确处理方式是（）。（2016）",[58,60,62,64],{"key":20,"text":59,"correct":22},"调整为257元",{"key":24,"text":61,"correct":22},"调整为282.63元",{"key":28,"text":63,"correct":26},"不做任何调整",{"key":31,"text":65,"correct":22},"调整为345元",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":31,"analysis":33},1139687,"采用清单计价的某分部分项工程，招标控制价的综合单价为320元，投标报价的综合单价为265元，该工程投标报价下浮率为5%，结算时，该分部分项工程工程量比清单量增加了18%，且合同未确定综合单价调整方法，则综合单价的处理方式是（ ）。 (2014)",[70,72,74,76],{"key":20,"text":71,"correct":22},"上浮18%",{"key":24,"text":73,"correct":22},"下调5%",{"key":28,"text":75,"correct":22},"调整为292.5元",{"key":31,"text":77,"correct":26},"可不调整",{"id":79,"libraryId":5,"type":80,"typeLabel":81,"stem":82,"options":83,"answer":95,"analysis":33},1139688,2,"多选题","根据《建设工程工程量清单计价规范》(GB50500-2013)工程变更引起施工方案改变并使措施项目发生变化时，关于措施项目费调整的说法，正确的有( )。 (2015)",[84,86,88,90,92],{"key":20,"text":85,"correct":22},"安全文明施工费按实际发生的措施项目，考虑承包人报价浮动因素进行调整",{"key":24,"text":87,"correct":26},"安全文明施工费按实际发生变化的措施项目调整，不得浮动",{"key":28,"text":89,"correct":26},"对单价计算的措施自费，按实际发生变化的措施项目和已标价工程量清单项目确定单价",{"key":31,"text":91,"correct":22},"对总价计算的措施项目费一般不能进行调整",{"key":93,"text":94,"correct":26},"E","对总价计算的措施项目费，按实际发生变化的措施项目并考虑承包人报价浮动因素进行调整","BCE",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":24,"analysis":33},1139689,"根据《建设工程施工合同（建设工程施工合同（示范文本）》（GF-2013-0201）承包人采购材料和工程设备的，现在合同中约定主要材料、工程设备价格变化的范围为（ ）。 (2015)",[100,101,102,104],{"key":20,"text":29,"correct":22},{"key":24,"text":32,"correct":26},{"key":28,"text":103,"correct":22},"4%",{"key":31,"text":105,"correct":22},"3%",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1139690,"根据根据《建设工程工程清单计价规范》（GB50500-2013），由于承包人因未在约定的工期内竣工 ，则对原约定竣工日期继续施工的工程，在使用价格调整公式进行价格调整时，应使用的现行价格指数 是（）。（2016）",[110,112,114,116],{"key":20,"text":111,"correct":22},"原约定竣工日期的价格价格指数",{"key":24,"text":113,"correct":26},"原约定竣工日期与实际竣工日期的两个价格指数中较低者",{"key":28,"text":115,"correct":22},"实际竣工日期的价格指数",{"key":31,"text":117,"correct":22},"原约定竣工日期与实际竣工日期的两个价格指数中较高者",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1139691,"某工程承包合同总额为9000万元，主要材料及构件所占比重为60%，工程预付款为合同总额的20%，则工程预付款起扣点为( )万元。 (2014)",[122,124,126,128],{"key":20,"text":123,"correct":22},"1800",{"key":24,"text":125,"correct":22},"3600",{"key":28,"text":127,"correct":22},"5400",{"key":31,"text":129,"correct":26},"6000",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1139692,"某工程合同总额300万元，工程预付款为合同总额的的20%，主要材料、构件占合同总额的50%，则工程预付款的起扣点为（）万元。 (2013)",[134,136,138,140],{"key":20,"text":135,"correct":22},"200",{"key":24,"text":137,"correct":22},"150",{"key":28,"text":139,"correct":26},"180",{"key":31,"text":141,"correct":22},"140",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1139693,"某建设工程施工过程中，由发包人供应的材料没有及时到货，导致承包人的工人窝工5个工作日，每个工日单价200元，承包人租赁的一台挖土机窝工5个台班，台班租赁费500元，承包人自卸汽车窝工2个 台班，该自卸汽车折旧费每台300元，工作时燃油动力费每台班80元。则承包人可以索赔的费用是（） 元。（2016）",[146,148,150,152],{"key":20,"text":147,"correct":22},"2500",{"key":24,"text":149,"correct":22},"3500",{"key":28,"text":151,"correct":22},"4260",{"key":31,"text":153,"correct":26},"4100",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1139694,"因修改设计导致现场停工而引起施工索赔时，承包商自有施工机械的索赔费用宜按机械（）计算。 (2012)",[158,160,162,164],{"key":20,"text":159,"correct":22},"租赁费",{"key":24,"text":161,"correct":22},"台班费",{"key":28,"text":163,"correct":26},"折旧费",{"key":31,"text":165,"correct":22},"大修理费",{"id":167,"libraryId":5,"type":80,"typeLabel":81,"stem":168,"options":169,"answer":180,"analysis":33},1139695,"施工过程中，可以作为工程量计量依据的资料有（）（2016）",[170,172,174,176,178],{"key":20,"text":171,"correct":26},"质量合格证书",{"key":24,"text":173,"correct":26},"计量规范",{"key":28,"text":175,"correct":26},"技术规范",{"key":31,"text":177,"correct":22},"招标工程清单",{"key":93,"text":179,"correct":26},"设计图纸","ABCE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":24,"analysis":33},1139696,"某灌注桩计量支付条款约定工程量以米计算，若设计长度为20米的灌注桩，承包人做了21米，监理工程师未对施工质量表示异议，则发包人应该按（ ）米支付价款。 (2015)",[185,187,189,191],{"key":20,"text":186,"correct":22},"19",{"key":24,"text":188,"correct":26},"20",{"key":28,"text":190,"correct":22},"21",{"key":31,"text":192,"correct":22},"22",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":24,"analysis":33},1139697,"根据《建设工程工程量清单计价规范》（GB 50500-2013）,关于施工中工程计量的说法，正确的是（）（2016）",[197,199,201,203],{"key":20,"text":198,"correct":22},"发包人应在收到承包人已完工程量报告后14天内核实工程量",{"key":24,"text":200,"correct":26},"单价合同的工程量必须以承包人完成合同工程应予计量的工程量确定",{"key":28,"text":202,"correct":22},"总价合同结算时工程量必须按实际工程计量",{"key":31,"text":204,"correct":22},"对质量不合格的工程，承包人承诺返工的工程量给予计量",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1139698,"根据《建设工程工程量清单计价规范》（GB50500-2013)，关于工程计量的说法，正确的是（ )。 (2013)",[209,210,212,214],{"key":20,"text":200,"correct":26},{"key":24,"text":211,"correct":22},"发包人应在收到承包人已完成工程量报告后14天核实",{"key":28,"text":213,"correct":22},"总价合同的工程量必须以原始的施工图纸为依据计量",{"key":31,"text":215,"correct":22},"所有工程内容必须按月计量",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":28,"analysis":33},1139699,"关于单价合同中工程计量的说法，正确的是（ ）。 (2014)",[220,222,224,226],{"key":20,"text":221,"correct":22},"单价合同应与计量的工程量是承包人实际施工的工程量",{"key":24,"text":223,"correct":22},"承包人因自身原因造成返工的工程量应予计量",{"key":28,"text":225,"correct":26},"工程计量应以设计图纸为依据",{"key":31,"text":227,"correct":22},"承包人为保证工程质量超过图纸要求的工程量应予计量",{"id":229,"libraryId":5,"type":80,"typeLabel":81,"stem":230,"options":231,"answer":242,"analysis":33},1139700,"根据《标准施工招标文件》，下列事件中，承包人向发包人既可索赔工期又可索赔费用的有( )。 (2014)",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"发包人原因导致工程缺陷和损失",{"key":24,"text":235,"correct":26},"承包人遇到不利物质条件",{"key":28,"text":237,"correct":22},"发包人要求向承包人提前交付工程设备",{"key":31,"text":239,"correct":26},"施工过程发现文物",{"key":93,"text":241,"correct":22},"承包人遇到异常恶劣的气候条件","BD",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":31,"analysis":33},1139701,"根据《建设工程价款结算暂行办法》，建设工程承发包双方未在合同中对工程进度款支付时间、支付比例等作约定的，发包人应该在批准工程进度款支付申请的（ ）天内，向承包人支付规定比例范围内的工程进度款。 (2012)",[247,249,251,253],{"key":20,"text":248,"correct":22},"7",{"key":24,"text":250,"correct":22},"28",{"key":28,"text":252,"correct":22},"56",{"key":31,"text":254,"correct":26},"14",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},1139702,"某工程项目预付款120万元，合同约定：每月进度款按结算价的80%支付；每月支付安全文明施工费20万元；预付款从开工的第4个月起分3个月等额扣回，开工后前6个月结算价如下表，则第5个月应支付的款项为（）万元。 (2015)",[259,261,263,265],{"key":20,"text":260,"correct":22},"136",{"key":24,"text":262,"correct":22},"160",{"key":28,"text":264,"correct":26},"156",{"key":31,"text":266,"correct":22},"152",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":28,"analysis":33},1139703,"根据《建设工程工程清单计价规范》（GB50500-2013），关于单价合同计量的说法，正确的是（） 。（2016）",[271,273,275,277],{"key":20,"text":272,"correct":22},"承包人为保证施工质量超出施工图纸范围实施的工程量，应予以计量",{"key":24,"text":274,"correct":22},"承包人收到计量通知后不派人参加计量，则发包人的计量无效",{"key":28,"text":276,"correct":26},"发包人应在计量前24小时通知承包人，无论承包人是否参加，计量结果有效",{"key":31,"text":278,"correct":22},"D发包人可以在任何方便的时候计量，计量结果有效",{"id":280,"libraryId":5,"type":80,"typeLabel":81,"stem":281,"options":282,"answer":293,"analysis":33},1139704,"关于招标控制价中“暂列金额”的说法，正确的 有（ ） (2012)",[283,285,287,289,291],{"key":20,"text":284,"correct":26},"设计图纸详细深入的工程，可适当降低暂列金额",{"key":24,"text":286,"correct":26},"复杂工程的暂列金额可适当提高",{"key":28,"text":288,"correct":22},"暂列金额由材料暂估价和专业工程暂估价两部分组成",{"key":31,"text":290,"correct":26},"暂列金额的估算要考虑工程环境条件",{"key":93,"text":292,"correct":22},"暂列金额应根据拟采用的施工方案估算","ABD",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1139705,"采用工程量清单计价的工程在竣工决算时，暂估价中的材料单价应按（ ）。 (2012)",[298,300,302,304],{"key":20,"text":299,"correct":22},"承包方自行购买该材料的单价计入综合单价确定",{"key":24,"text":301,"correct":26},"发、承包双方最终确认价在综合单价中调整",{"key":28,"text":303,"correct":22},"招标文件中的暂估价定",{"key":31,"text":305,"correct":22},"市场价格信息在综合单价中调整",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},1139706,"根据《建设工程工程量清单计价规范》(GE50500-2010)，签约合同中的暂估材料在确定单价以后，其相应项目综合单价的处理方式是()。 (2015)",[310,312,314,316],{"key":20,"text":311,"correct":22},"在综合单价中用确定单价代替原暂估价，并调整企业管理费，不调整利润",{"key":24,"text":313,"correct":22},"在综合单价中用确定单价代替原暂估价，并调整企业管理费和利润",{"key":28,"text":315,"correct":22},"综合单价不做调整",{"key":31,"text":317,"correct":26},"在综合单价中用确定单价代替原暂估价，不再调整企业管理费和利润",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1139707,"根据《建设工程工程量清单计价规范》（GB50500-2013)，因不可抗力事件导致的损害及其费用增加，应由承包人承担的是（ ). (2013)",[322,324,326,328],{"key":20,"text":323,"correct":22},"工程本身的损害",{"key":24,"text":325,"correct":26},"承包人的施工机械损坏",{"key":28,"text":327,"correct":22},"发包方现场的人员伤亡",{"key":31,"text":329,"correct":22},"工程所需的修复费用",{"id":331,"libraryId":5,"type":80,"typeLabel":81,"stem":332,"options":333,"answer":293,"analysis":33},1139708,"施工合同履行过程中，导致工程量清单缺项并应调整合同价款的原因有() (2015)",[334,336,338,340,342],{"key":20,"text":335,"correct":26},"设计变更",{"key":24,"text":337,"correct":26},"施工条件改变",{"key":28,"text":339,"correct":22},"承包人投标漏项",{"key":31,"text":341,"correct":26},"工程量清单编制错误",{"key":93,"text":343,"correct":22},"施工技术进步",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1139709,"根据《建设工程量清单计价规范》（GB50500-2013），工程发包时，招标人要求索赔的工期天数超过定额工期（ ）时，应当在招标文件中明示增加赶工费用。 (2015)",[348,349,350,351],{"key":20,"text":32,"correct":22},{"key":24,"text":29,"correct":22},{"key":28,"text":25,"correct":22},{"key":31,"text":21,"correct":26},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1139710,"根据根据《建设工程工程量清单计价规范》（GB50500-2013），关于合同工期的说法正确的是（ ）。（2016）",[356,358,360,362],{"key":20,"text":357,"correct":26},"发包人要求合同工程提前竣工的，应承担承包人由此增加的提前竣工费用",{"key":24,"text":359,"correct":22},"招标人压缩的工期天数不得超过定额工期的30%",{"key":28,"text":361,"correct":22},"招标人压缩的工期天数超过定额工期的20%但不超过30%时，不额外支付赶工费用",{"key":31,"text":363,"correct":22},"工程实施过程中，发包人要求合同工程提前竣工的，承包人必须采取加快工程进度的措施",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":28,"analysis":33},1139711,"工程峻工结算书编制与核对的责任分工是（ ）。 (2012)",[368,370,372,374],{"key":20,"text":369,"correct":22},"发包人编制，承包人核对",{"key":24,"text":371,"correct":22},"监理机构编制，发包人核对",{"key":28,"text":373,"correct":26},"承包人编制，发包人核对",{"key":31,"text":375,"correct":22},"造价咨询人编制，承包人核对",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},1139712,"根据《建设工程工程清单计价》(GB50500-2013)，已标价工程量清单中没有适用也没有类似于变更工程项目的，变更工程项目单价应由（）提出。 (2015)",[380,382,384,386],{"key":20,"text":381,"correct":26},"承包人",{"key":24,"text":383,"correct":22},"监理人",{"key":28,"text":385,"correct":22},"发包人",{"key":31,"text":387,"correct":22},"设计人",{"id":389,"libraryId":5,"type":80,"typeLabel":81,"stem":390,"options":391,"answer":402,"analysis":33},1139713,"根据《建设工程施工合同（示范文本）》（GF-99-0201），关于工程变更程序的说法，正确的有（ ） (2012)",[392,394,396,398,400],{"key":20,"text":393,"correct":22},"发包人若需对原工程设计进行变更，应提前７天书面通知承包人",{"key":24,"text":395,"correct":26},"工程变更超过原设计标准或批准的建设规模时，发包人应该重新报批",{"key":28,"text":397,"correct":22},"对于发包人的变更通知，承包人有权拒绝执行",{"key":31,"text":399,"correct":26},"承包人在施工中提出的合理化建议设计设计图纸更改的，须经工程师同意",{"key":93,"text":401,"correct":26},"未经工程师同意，承包人擅自变更工程的，承包人应承担由此发生的相应费用","BDE",{"id":404,"libraryId":5,"type":80,"typeLabel":81,"stem":405,"options":406,"answer":417,"analysis":33},1139714,"根据现行《建设工程价款结算暂行办法》，发包人未在合同约定的时间内向承包人支付工程竣工结算价款时，承包人可以采取的措施有（ ). (2013)",[407,409,411,413,415],{"key":20,"text":408,"correct":26},"向发包人催促按约定支付工程结算价款",{"key":24,"text":410,"correct":22},"将该工程留置不予交付使用",{"key":28,"text":412,"correct":26},"向发包人要求按银行同期贷款利率支付拖欠工程价款的利息",{"key":31,"text":414,"correct":26},"与发包人协商将该工程折价抵款",{"key":93,"text":416,"correct":26},"向人民法院申请将该工程依法拍卖","ACDE",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1139715,"某工程随工合同约定根据价格调整公式调整合同价，已知不调值部分占合同价的比例为15%，可参与调值部分的费用类型、占合同总价的比例和相关价格指数见下表，若结算当月完成的合同额为1000万元，则调整后的合同金额为（）。2018真题",[422,424,426,428],{"key":20,"text":423,"correct":26},"1050",{"key":24,"text":425,"correct":22},"1034",{"key":28,"text":427,"correct":22},"1017",{"key":31,"text":429,"correct":22},"1000",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},1139716,"（2019年真题）根据《建设工程工程量清单计价规范》，工程量清单计价的某分部分项工程综合单价为500元\u002Fm3，其中暂估材料单价300元，管理费率5%，利润率7%，工程实施后，暂估材料的单价确定为350元。结算时该分部分项工程综合单价为（）元\u002Fm3。",[434,436,438,440],{"key":20,"text":435,"correct":22},"350.00",{"key":24,"text":437,"correct":22},"392.00",{"key":28,"text":439,"correct":26},"550.00",{"key":31,"text":441,"correct":22},"556.18",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1139717,"（2019年真题）根据《建设工程造价鉴定规范》，由于承包人违约导致合同解除的费用争议，发包人出具的鉴定费用中包括的费用是（）",[446,448,450,452],{"key":20,"text":447,"correct":26},"完成永久工程的价款",{"key":24,"text":449,"correct":22},"遣散人员的费用",{"key":28,"text":451,"correct":22},"撤离现场的费用",{"key":31,"text":453,"correct":22},"已付款的材料等物品金额（归承包人所有）",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1139718,"（2019年真题）根据《建设工程施工合同(示范文本)》，除专用合同条款另有约定外，承包人应提交最终结清申请单及证明材料的最迟时间为()。",[458,460,462,464],{"key":20,"text":459,"correct":22},"竣工验收合格后7天",{"key":24,"text":461,"correct":26},"缺陷责任期终止证书颁发后7天",{"key":28,"text":463,"correct":22},"签发竣工付款征书后14天",{"key":31,"text":465,"correct":22},"工程竣工验收合格后28天",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},1139719,"（2019年真题）根据《建设工程施工合同(示范文本)》通用合同条款，关于工程保修的说法，正确的是( )",[470,472,474,476],{"key":20,"text":471,"correct":22},"保修期内因发包人使用不当造成工程的缺陷和损坏，可以委托承包人修复，发包人承担修复的数用但不用支付承包人利润",{"key":24,"text":473,"correct":22},"保修期内因发包人原因造成工程的缺陷和损坏，承包人应负责修复并承担修复的费用，但不承担因工程缺陷和损坏造成的人身及财产损失",{"key":28,"text":475,"correct":26},"保修期内因特大地震造成工程的缺陷和损坏，可以委托承包人修复，发包人承担修复的费用并支付承包人合理的利润",{"key":31,"text":477,"correct":22},"保修期内发包人发现已接收的工程存在任何缺陷应书面通知承包人修复，承包人接到通如后应在48小时内到工程现场修复缺陷",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},1139720,"（2019年真题）某工程在施工过程中，由于发包人设计变更导致停工，承包人的工人窝工10个工日。每个工日单价为250元；承包人租赁的一台挖土机窝工3个台班，挖土机台班租赁费为800元；承包人自有的一台自卸汽车窝工3个台班，该自卸汽车台班折旧费为400元，台班单价为700元，则承包人可以向发包人索赔的费用为（）元。",[482,484,486,488],{"key":20,"text":483,"correct":26},"6100",{"key":24,"text":485,"correct":22},"4900",{"key":28,"text":487,"correct":22},"5500",{"key":31,"text":489,"correct":22},"7000",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},1139721,"（2019年真题）某混凝土工程招标清单工程量为200m3，合同约定的综合单价为600元\u002Fm3，当实际完成并监理工程师确认的工程量超过清单工程量15%时可调整综合单价，调价系数为0.9。施工过程中，因设计变更导致实际工程量为250m3。则该混凝土工程的工程价款为()万元。",[494,496,498,500],{"key":20,"text":495,"correct":22},"12.00",{"key":24,"text":497,"correct":26},"14.88",{"key":28,"text":499,"correct":22},"14.74",{"key":31,"text":501,"correct":22},"15.00",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1139722,"（2019年真题）某工程在施工过程中因不可抗力造成如下损失:永久工程损坏修复费用16万元，承包人受伤人员医药费4万元，施工机具损害损失6万元，应发包人要求赶工发生费用2万元，停工期间应发包人要求承包人清理现场费用4万元。承包人及时向项目监理机构提出索赔申请，并附有相关证明材料。根据《建设工程施工合同(示范文本)》，项目监理机构应批准的索赔金额为( )万元。",[506,507,509,510],{"key":20,"text":188,"correct":22},{"key":24,"text":508,"correct":22},"24",{"key":28,"text":192,"correct":26},{"key":31,"text":511,"correct":22},"32",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1139723,"（2019年真题）根据《建设工程工程量清单计价规范》，某工程采用价格调整公式进行价格调整施工中由于承包人返工的原因导致工期延误，则约定竣工日期后继续施工的工程，在使用价格调整公式时，应采用的价格指数是()",[516,517,519,520],{"key":20,"text":113,"correct":26},{"key":24,"text":518,"correct":22},"原约定竣工日期的价格指数",{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":522,"libraryId":5,"type":80,"typeLabel":81,"stem":523,"options":524,"answer":535,"analysis":33},1139724,"（2019年真题）根据《建设工程造价鉴定规范》，关于计量争议鉴定的说法，正确的有（）。",[525,527,529,531,533],{"key":20,"text":526,"correct":26},"在鉴定项目图纸完备，当事人对计量依据存在争议，合同专用条款没有明确约定且无国家标准的，鉴定人应以相关工程行业标准或地方标准规定计量",{"key":24,"text":528,"correct":26},"当事人一方对另一方的计量结果提出异议但未提供具体证据的，鉴定人应按原计量结果进行鉴定",{"key":28,"text":530,"correct":26},"当事人一方对另一方的计量结果提出异议又提供具体证据的，鉴定人应复核并依据复核结果进行鉴定",{"key":31,"text":532,"correct":26},"合同当事人签订的总价合同对工程计量有约定的，鉴定人应按约定进行鉴定",{"key":93,"text":534,"correct":22},"当事人签订的总价合同对工程计量没有约定的，鉴定人应对整个工程的工程量进行鉴定","ABCD",{"id":537,"libraryId":5,"type":80,"typeLabel":81,"stem":538,"options":539,"answer":546,"analysis":33},1139725,"（2019年真题）根据《标准施工招标文件》，承包人可同时索赔工期和费用的情形有（）",[540,541,542,544,545],{"key":20,"text":235,"correct":26},{"key":24,"text":239,"correct":26},{"key":28,"text":543,"correct":22},"法律变化引起价格调整",{"key":31,"text":237,"correct":22},{"key":93,"text":241,"correct":22},"AB",{"id":548,"libraryId":5,"type":80,"typeLabel":81,"stem":549,"options":550,"answer":561,"analysis":33},1139726,"根据《企业安全生产费用提取和使用管理方法》（财企[2012]16号），关于安全文明施工费的说法，正确的有（ ） （2016）",[551,553,555,557,559],{"key":20,"text":552,"correct":26},"发包人应在开工后28天内预付不低于当年施工进度计划的安全文明施工费总额的50%",{"key":24,"text":554,"correct":26},"承包人对安全文明施工费应专款专用，不得挪作他用",{"key":28,"text":556,"correct":26},"承包人应将安全文明施工费在财务账目中单独列项备查",{"key":31,"text":558,"correct":22},"发包人没有按时支付安全文明施工费的，承包人可以直接停工",{"key":93,"text":560,"correct":22},"发包我在付款期满后7天内仍未支付安全文明施工费的，若发生安全事故，发包人承担全部责任","ABC",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":28,"analysis":33},1139727,"（2020年真题）根据《建设工程工程量清单计价规范》，工程实施过程中，发包人要求合同工程提前竣工的，应采取的做法是（ ）",[566,568,570,572],{"key":20,"text":567,"correct":22},"下达变更指令，要求承包人必须提前竣工并支付，由此增加的赶工费用",{"key":24,"text":569,"correct":22},"增加合同补充条款，要求承包人采取加快工程进度措施，不承担赶工费用",{"key":28,"text":571,"correct":26},"征得承包人同意后，与承包人商定采取加快工程进度的措施，并承担由此增加的赶工费用",{"key":31,"text":573,"correct":22},"自行将工期压缩到合同工期的80%，并要求承包人按期完工",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":28,"analysis":33},1139728,"（2020年真题）某施工项目因80年一遇的特大暴雨停工10天，承包人在停工期间按照发包人要求照管工程发生费用2万元，承包人施工机具损坏损失10万元，已经建成的永久工程损坏损失20万元，之后应发包人要求修复被暴雨冲毁的道路花费2.5万元，修复道路时因施工质量问题发生返工费用1万元。根据《建设工程施工合同（示范文本）》，以上事件产生的费用和损失中，承包人应承担（ ）万元。",[578,580,582,584],{"key":20,"text":579,"correct":22},"21.0",{"key":24,"text":581,"correct":22},"13.5",{"key":28,"text":583,"correct":26},"11.0",{"key":31,"text":585,"correct":22},"10.0",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1139729,"（2020年真题）根据《建设工程施工合同（示范文本）》，关于安全文明施工费的说法，正确的是（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":26},"承包人对安全文明施工费应专款专用，并在财务账目中单独列项备查",{"key":24,"text":593,"correct":22},"基准日期后合同所使用的法律发生变化，由此增加的安全文明施工费由承包人承担",{"key":28,"text":595,"correct":22},"经发包人同意，承包人采取合同约定以外的安全措施所产生的费用，由承包人承担",{"key":31,"text":597,"correct":22},"发包人应在开工后42天内预付安全文明施工费总额的60%",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1139730,"（2020年真题）根据《建设工程施工合同（示范文本）》，因设计单位提出设计变更，变更后已标价工程量清单中没有相同及类似变更项目单价的，变更估价申请应由（ ）提出。",[602,603,604,605],{"key":20,"text":381,"correct":26},{"key":24,"text":383,"correct":22},{"key":28,"text":385,"correct":22},{"key":31,"text":387,"correct":22},{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":28,"analysis":33},1139731,"（2020年真题）某工程施工时处于当地正常的雨季，导致工期延误.在工期延误期间又出现XX变化。根据《建设工程工程量清单计价规范》，对由此增加的费用和延误的工期正确的处理方式（ ）",[610,612,614,616],{"key":20,"text":611,"correct":22},"费用，工期均有发包人承担",{"key":24,"text":613,"correct":22},"费用由发包人承担，工期由承包人承担",{"key":28,"text":615,"correct":26},"费用，工期均由承包人承担",{"key":31,"text":617,"correct":22},"费用由承包人承担，工期由发包人承担",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":28,"analysis":33},1139732,"（2020年真题）单价合同在执行过程中,发现招标工程量清单中出现工程量偏差引起工程量增加，则该合同工程量应按（ ）计量。",[622,624,626,628],{"key":20,"text":623,"correct":22},"原招标工程量清单中的工程量",{"key":24,"text":625,"correct":22},"招标文件中所附的施工图纸的工程量",{"key":28,"text":627,"correct":26},"承包人在履行合同义务中完成的工程量",{"key":31,"text":629,"correct":22},"承包人提交的已完工程量报告中的数量",[631,634,637,640,643,646],{"id":15,"name":632,"category":7,"favorite":633},"领导干部任职前廉政法规知识测试题",92,{"id":635,"name":636,"category":7,"favorite":15},595,"建筑结构与设备",{"id":638,"name":639,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":641,"name":642,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":644,"name":645,"category":7,"favorite":8},534,"BIM工程师",{"id":647,"name":645,"category":7,"favorite":8},535]