[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":634},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,40,50,2696,[13,34,52,64,74,82,94,104,115,127,139,151,163,175,190,205,217,229,244,259,271,285,297,309,320,332,344,356,366,378,390,402,414,426,438,450,464,476,488,500,512,524,536,548,560,575,586,598,610,622],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1139632,1,"单选题","下列四种情形中，适宜采用固定总价合同的工程是（）（2016）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工期6个月，规模小且施工图设计已审查批准的办公楼工程",true,{"key":24,"text":25,"correct":26},"B","采用某种新技术且较复杂，工期5年的海底隧道工程",false,{"key":28,"text":29,"correct":26},"C","采用工程量清单计价，只有初步设计图纸，工期2年的地铁站房建设工程",{"key":31,"text":32,"correct":26},"D","特大暴雨过后的紧急抢险工程","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1139633,2,"多选题","根据《建设工程价款结算暂行办法》（财建{2004}369号），发承包双方在合同中约定的和合同价款有关的事项有( )。 (2015)",[40,42,44,46,48],{"key":20,"text":41,"correct":26},"投标保证金的数额、支付方式及时间",{"key":24,"text":43,"correct":22},"工程价款的调整因素、方法、程序、支付方式及时间",{"key":28,"text":45,"correct":22},"承担计价风险的内容、范围以及超出约定内容、范围的调整方法。",{"key":31,"text":47,"correct":22},"工程竣工价款结算编制与核对、支付方式及时间",{"key":49,"text":50,"correct":22},"E","违约责任以及发生合同价款争议的解决方法及时间","BCDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":31,"analysis":33},1139634,"因暴雨引发山体滑坡而实施的公路交通紧急抢修项目，其合同计价方式宜采用（ ）。 (2014)",[56,58,60,62],{"key":20,"text":57,"correct":26},"固定总价合同",{"key":24,"text":59,"correct":26},"固定单价合同",{"key":28,"text":61,"correct":26},"可调单价合同",{"key":31,"text":63,"correct":22},"成本加酬金合同",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},1139635,"根据《建设工程工程量清单计价规范》（GB50500-2013）实行工程量清单计价的工程，应采用的合同类型是（）。 (2013)",[68,70,72,73],{"key":20,"text":69,"correct":26},"总价合同",{"key":24,"text":71,"correct":22},"单价合同",{"key":28,"text":57,"correct":26},{"key":31,"text":63,"correct":26},{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":24,"analysis":33},1139636,"对建设规模较小，技术难度较低、施工工期较短，施工图设计已经审查批准的工程，从有利于业主方控制投资的角度，适宜采用的合同类型是（ ）。 (2015)",[78,79,80,81],{"key":20,"text":59,"correct":26},{"key":24,"text":57,"correct":22},{"key":28,"text":63,"correct":26},{"key":31,"text":61,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1139637,"按照《建设工程工程量清单计价规范》（GB50500-2013）投标的工程，完全不能竞争的部分是（ ). (2013)",[86,88,90,92],{"key":20,"text":87,"correct":26},"分部分项工程费",{"key":24,"text":89,"correct":26},"措施项目费",{"key":28,"text":91,"correct":26},"其他项目费",{"key":31,"text":93,"correct":22},"规费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1139638,"根据《建设工程工程计价规范》（CB505000-2013），建设工程投标报价中，不得作为竞争性费用的是（） (2015)",[98,100,102,103],{"key":20,"text":99,"correct":26},"总承包服务费",{"key":24,"text":101,"correct":26},"夜间施工增加费",{"key":28,"text":87,"correct":26},{"key":31,"text":93,"correct":22},{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1139639,"根据《建设工程工程量清单计价规范》（GB 50500—2008）编制施工图预算时，“分项工程量×相应单价”计算得到的价款中已经包含（ ）。 (2012)",[108,110,112,114],{"key":20,"text":109,"correct":26},"措施费",{"key":24,"text":111,"correct":22},"管理费",{"key":28,"text":113,"correct":26},"税金",{"key":31,"text":93,"correct":26},{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":31,"analysis":33},1139640,"招标人编制招标控制价与投标人报价的共同基础是（ ）。 (2012)",[119,121,123,125],{"key":20,"text":120,"correct":26},"工料单价",{"key":24,"text":122,"correct":26},"综合单价",{"key":28,"text":124,"correct":26},"按拟采用施工方案计算额工程量",{"key":31,"text":126,"correct":22},"工程量清单标明的工程量",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1139641,"根据《建设工程工程量清单计价规范》(GB 50500-2013)，分部分项工程清单综合单价应包含( )以及一定范围内的风险费用。 (2014)",[131,133,135,137],{"key":20,"text":132,"correct":22},"人工费、材料和工程设备费、施工机具使用费、企业管理费、利润",{"key":24,"text":134,"correct":26},"人工费、材料费、施工机具使用费、企业管理费、规费",{"key":28,"text":136,"correct":26},"人工费、材料和工程设备费、施工机具使用费、规费、利润、税金",{"key":31,"text":138,"correct":26},"材料费、工程设备费、施工机具使用费、规费、税金、企业管理费",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1139642,"根据《建设工程工程量清单计价规范》（CB50500-2013），施工企业综合单价的计算有以下工程，①确定组合定额子目并计算各子目工程量；②确定人、料、机单价；③测算人、料、机的数量；④计算清单项目的综合单价；⑤计算清单项目的管理费和利润；⑥计算清单项目的人、料、机总费用，正确的步骤是（）。（2016）",[143,145,147,149],{"key":20,"text":144,"correct":22},"①-③-②-⑥-⑤-④",{"key":24,"text":146,"correct":26},"②-③-①-⑤-⑥-④",{"key":28,"text":148,"correct":26},"③-①-②-⑥-⑤-④",{"key":31,"text":150,"correct":26},"①-③-②-④-⑥-⑤",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1139643,"投标过程中，若投标人发现招标工程量清单项目特征描述与施工图纸不符时，应以（）为准进行报价。（2016）",[155,157,159,161],{"key":20,"text":156,"correct":22},"招标工程量清单的项目特征",{"key":24,"text":158,"correct":26},"招标文件中的施工图纸说明",{"key":28,"text":160,"correct":26},"实际施工的项目特征",{"key":31,"text":162,"correct":26},"投标人按规范修正后的项目特征",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},1139644,"在招投标过程中，若招标文件某分部分项工程量清单项目特征描述与设计图纸不符，投标人报价时应按（ ）确定综合单价。 (2012)",[167,169,171,173],{"key":20,"text":168,"correct":26},"设计图纸",{"key":24,"text":170,"correct":26},"预算定额",{"key":28,"text":172,"correct":26},"企业定额",{"key":31,"text":174,"correct":22},"工程量清单",{"id":176,"libraryId":5,"type":36,"typeLabel":37,"stem":177,"options":178,"answer":189,"analysis":33},1139645,"施工企业拟投标一个单独招标的分部分项工程项目，清单工程量为10000m3。企业经测算完成该部分分项工程施工直接消耗的人、料、机费用为200万元（不含增值税进项税额）。2017真题估计管理费为16万元，风险费用2万元，利润30万元。为完成该分部分项工程的措施项目费估计为24万元（其中安全文明施工费18万元）（不含增值税进项税额）。2017真题估计全部规费29万元，税金9万元。不考虑其他因素，关于该分部分项工程的说法正确的有（ ）。2017真题",[179,181,183,185,187],{"key":20,"text":180,"correct":22},"工料单价为200元\u002Fm3",{"key":24,"text":182,"correct":22},"按现行清单价计价规范综合单价为248元\u002Fm3",{"key":28,"text":184,"correct":26},"全费用综合单价为292元\u002Fm3",{"key":31,"text":186,"correct":26},"按现行清单计价规范，为了中标规费和税金可降至20万元",{"key":49,"text":188,"correct":22},"按现行清单计价规范，措施项目费报价不能低于18万元","ABE",{"id":191,"libraryId":5,"type":36,"typeLabel":37,"stem":192,"options":193,"answer":204,"analysis":33},1139646,"根据《建设工程工程量清单计价规范》，关于单价项目中风险及其费用的说法，正确的有（）。2018真题",[194,196,198,200,202],{"key":20,"text":195,"correct":22},"对于招标文件中要求投标人承担的风险，投标人应在综合单价中予以考虑",{"key":24,"text":197,"correct":22},"投标人的综合单价中考虑风险费通常以风险费率的形式进行计算",{"key":28,"text":199,"correct":26},"招标文件中没有提到的风险，投标人在综合单价中不予考虑",{"key":31,"text":201,"correct":22},"对于风险范围和风险费用的计算方法应在合同专用条款中作出约定",{"key":49,"text":203,"correct":22},"施工中出现的风险内容及其范围在招标文件规定的范围内时，综合单价不得变动","ABDE",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":20,"analysis":33},1139647,"若施工招标文件和中标人投标文件对工程质量标准的定义不一致，则商签施工合同时，工程质量标准约定应以（）为准 (2012)",[209,211,213,215],{"key":20,"text":210,"correct":22},"中标人投标文件",{"key":24,"text":212,"correct":26},"双方重新协商的结果",{"key":28,"text":214,"correct":26},"招标文件",{"key":31,"text":216,"correct":26},"中标通知书",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":28,"analysis":33},1139648,"根据《建设工程工程量清单计价规范》，招标人对土方开挖清单项的项目特征描述一般有挖方深度、基坑底宽、场内运距、弃土运距和（）。2018真题",[221,223,225,227],{"key":20,"text":222,"correct":26},"放坡的坡度系数",{"key":24,"text":224,"correct":26},"槽底钎探",{"key":28,"text":226,"correct":22},"土壤类别",{"key":31,"text":228,"correct":26},"排地表水的方式",{"id":230,"libraryId":5,"type":36,"typeLabel":37,"stem":231,"options":232,"answer":243,"analysis":33},1139649,"工程量清单招标时，投标人编制投标报价前应认真复核工程量清单中的分部分项工程量，因为该工程量会影响（ ）（2016）",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"施工方法选择",{"key":24,"text":236,"correct":22},"投标总价的计算",{"key":28,"text":238,"correct":22},"劳动力和机具的选择",{"key":31,"text":240,"correct":26},"结算工程量的确定",{"key":49,"text":242,"correct":22},"投标综合单价报价","ABCE",{"id":245,"libraryId":5,"type":36,"typeLabel":37,"stem":246,"options":247,"answer":258,"analysis":33},1139650,"下列资料中，属于编制招标工程量清单和招标控制价共同依据的有（ ）。2017真题",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"施工现场情况和施工企业定额",{"key":24,"text":251,"correct":26},"工程造价管理机构发布的工程造价信息",{"key":28,"text":253,"correct":22},"建设工程设计文件及相关资料",{"key":31,"text":255,"correct":22},"与建设项目相关的标准、规范、技术资料",{"key":49,"text":257,"correct":22},"建设工程工程量清单计价规范","CDE",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},1139651,"（2019年真题）根据《建设工程工程量清单计价规范》，某招标工程量清单中挖沟槽土方的工程量为2600m3，投标人在考虑工作面和放坡后，预计开挖土方量为5090m3，运输土方量为1925m3，人料机及管理费、利润合价为118200元。不考虑其他因素，则该分项工程的工程量清单综合单价为( )元\u002Fm3。",[263,265,267,269],{"key":20,"text":264,"correct":26},"16.85",{"key":24,"text":266,"correct":22},"45.46",{"key":28,"text":268,"correct":26},"23.22",{"key":31,"text":270,"correct":26},"61.40",{"id":272,"libraryId":5,"type":36,"typeLabel":37,"stem":273,"options":274,"answer":284,"analysis":33},1139652,"（2019年真题）下列材料中，属于编制招标控制价和投标报价的共同依据的有（）。",[275,277,278,280,282],{"key":20,"text":276,"correct":22},"国家、地区或行业定额",{"key":24,"text":172,"correct":26},{"key":28,"text":279,"correct":22},"造价管理部门发布的工程造价信息",{"key":31,"text":281,"correct":26},"投标人拟采用的施工方案",{"key":49,"text":283,"correct":22},"施工现场自然条件","ACE",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1139653,"（2019年真题）工程量清单计价模式下，投标人应按照招标工程量清单中列出的金额填写且不得变动的项目是（）",[289,291,293,295],{"key":20,"text":290,"correct":22},"暂列金额和专业工程暂估价",{"key":24,"text":292,"correct":26},"暂列金额和总承包服务费",{"key":28,"text":294,"correct":26},"计日工和总承包服务费",{"key":31,"text":296,"correct":26},"计日工和专业工程暂估价",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":31,"analysis":33},1139654,"（2019年真题）据《建设工程工程量清单计价规范》，关于投标人投诉招标人不按规范编制招标控制价的说法，正确的是（）",[301,303,305,307],{"key":20,"text":302,"correct":26},"投诉期为招标控制价公布后的15天内",{"key":24,"text":304,"correct":26},"投标人应向政府投资管理部门投诉",{"key":28,"text":306,"correct":26},"投诉时，应当提交只加盖投标单位公章的书面投诉书",{"key":31,"text":308,"correct":22},"投诉书应明确投诉人的相关请求及主张",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1139655,"（2019年真题）工程量清单计价模式下，宜采用参数法计价的措施项目费是（）。",[313,314,316,318],{"key":20,"text":101,"correct":22},{"key":24,"text":315,"correct":26},"混凝土模板费",{"key":28,"text":317,"correct":26},"施工围挡费",{"key":31,"text":319,"correct":26},"垂直运输费",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":31,"analysis":33},1139656,"（2019年真题）投标人编制分部分项工程综合单价的主要工作有:①计算清单项目的管理费和利润；②测算人、料、机消耗量；③确定组合定额子目并计算各子目工程量；④确定人、料、机单价，正确的顺序是（）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"③①②④",{"key":24,"text":327,"correct":26},"②①③④",{"key":28,"text":329,"correct":26},"③②①④",{"key":31,"text":331,"correct":22},"③②④①",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},1139657,"（2019年真题）发承包双方在进行招标工程合同价款约定时，若出现中标人投标文件与招标文件不一致的情况，正确的做法是（）",[336,338,340,342],{"key":20,"text":337,"correct":22},"以中标人投标文件为准",{"key":24,"text":339,"correct":26},"以招标文件为准",{"key":28,"text":341,"correct":26},"由双方重新商定不一致的条款",{"key":31,"text":343,"correct":26},"选择有利于招标人的条款",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1139658,"（2019年真题）国际工程投标中，投标人在投标截止日前一天发现招标工程量清单中某分项工程量有明显的计算错误，则最适宜采取的做法是()。",[348,350,352,354],{"key":20,"text":349,"correct":26},"按照施工中可能的工程量填报单价，不做任何额外说明",{"key":24,"text":351,"correct":26},"电话咨询招标人，根据招标人口头认可的数量填报单价",{"key":28,"text":353,"correct":22},"按照原招标文件的工程量填报单价，另在投标致函中予以说明",{"key":31,"text":355,"correct":26},"按照投标人修正的工程量填报单价，另在投标致函中予以说明",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1139660,"（2020年真题）投标过程中，投标人发现招标工程量清单项目特征描述与设计图纸的描述不符时，报价时应以（ ）为准。",[360,361,362,364],{"key":20,"text":162,"correct":26},{"key":24,"text":156,"correct":22},{"key":28,"text":363,"correct":26},"实际施工项目的具体特征",{"key":31,"text":365,"correct":26},"招标文件中的设计图纸及其说明",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},1139661,"（2020年真题）根据《建设工程工程量清单计价规范》，投标人认为招标控制价没有按照规范编制的，应在招标控制价公布后（ ）天内提交书面投诉书。",[370,372,374,376],{"key":20,"text":371,"correct":26},"14",{"key":24,"text":373,"correct":26},"10",{"key":28,"text":375,"correct":26},"7",{"key":31,"text":377,"correct":22},"5",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1139662,"（2020年真题）关于分部分项工程量清单和定额子目工程量的说法，正确的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"一个清单项目只对应一个定额子目时，清单工程量的定额工程量完全相同",{"key":24,"text":385,"correct":26},"清单工程量计算的主项，工程量应与定额子目的工程量一致",{"key":28,"text":387,"correct":26},"清单工程量通常可以用于直接计价",{"key":31,"text":389,"correct":22},"定额子目工程量，应严格按照与所采用的定额相对应的工程量计算规则计算",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1139663,"根据《建设工程工程量清单计价规范》（GB50500-2013），在合同履行期间，由于招标工程量清单缺页，新增了分部分项工程量清单项目，关于其合同价款确定的说法，正确的是（）。（2016）",[394,396,398,400],{"key":20,"text":395,"correct":26},"新增清单项目的综合单价应当由监理工程师提出",{"key":24,"text":397,"correct":22},"新增清单项目导致新增措施项目的，承包人应将新增措施项目施工方案提交发包人批准",{"key":28,"text":399,"correct":26},"新增清单项目综合单价应由承包人提出，但相关措施项目费用不能再做调整",{"key":31,"text":401,"correct":26},"新增清单项目应由额外工程处理，承包人可选择或者不做",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1139664,"根据《建设工程工程量清单计价规范》（GB50500-2013)，关于工程量清单编制的说法，正确的是（）。 (2013)",[406,408,410,412],{"key":20,"text":407,"correct":22},"同一招标工程的项目编码不能重复",{"key":24,"text":409,"correct":26},"措施项目都应该以“项”为计量单位",{"key":28,"text":411,"correct":26},"所有清单项目的工程量都应以实际施工的工程量为准",{"key":31,"text":413,"correct":26},"暂估价是用于施工中可能发生工程变更时的工程价款调整的费用",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1139665,"某独立土方工程，招标工程量清单中的工程数量为1000m3，承包人投标报价中的综合单价为30元\u002Fm3。合同约定，当实际工程量超过清单工程量15%时调整单价，调整系数为0.9。工程结束时承包人实际完成并经监理工程师确认的工程量为1400m3，则该土方工程的工程量价款为（ ）元。",[418,420,422,424],{"key":20,"text":419,"correct":26},"42300",{"key":24,"text":421,"correct":22},"41250",{"key":28,"text":423,"correct":26},"40800",{"key":31,"text":425,"correct":26},"37800",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1139666,"关于工程质量保证金的说法，正确的是（ ）。2017真题",[430,432,434,436],{"key":20,"text":431,"correct":22},"合同约定缺陷责任期终止后，发包人应按照合同中最终结清的相关规定，将剩余的质量保证金返还给承包人",{"key":24,"text":433,"correct":26},"在合同约定的缺陷责任期终止后，发包人退还剩余质量保证金，承包人不再承担质量保修责任",{"key":28,"text":435,"correct":26},"承包人未按照合同约定履行工程缺陷修复义务的，发包人有权从质量保证金中扣除用于各种缺陷修复的支出",{"key":31,"text":437,"correct":26},"最终结清时，如果承包人被预留的质量保证金不足以抵减发包人工程缺陷维修费用的，发包人应承担不足部分",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},1139667,"—般情况下竣工结算审查应采用的方法是（）。2018真题",[442,444,446,448],{"key":20,"text":443,"correct":26},"抽样审查",{"key":24,"text":445,"correct":26},"重点审查",{"key":28,"text":447,"correct":22},"全面审查",{"key":31,"text":449,"correct":26},"对比审查",{"id":451,"libraryId":5,"type":36,"typeLabel":37,"stem":452,"options":453,"answer":51,"analysis":33},1139668,"根据《建设工程工程量清单计价规范》GB50500-2013，关于单价合同工程计量的说法，正确的有（ ）。2017真题",[454,456,458,460,462],{"key":20,"text":455,"correct":26},"承包人认为发包人核实后的计量结果有误，应及时口头告知发包人",{"key":24,"text":457,"correct":22},"发包人在现场计量前24小时通知承包人，承包人未派人参加计量结果有效",{"key":28,"text":459,"correct":22},"工程量按承包人在履行合同义务过程中实际完成应予计量的工程量确定",{"key":31,"text":461,"correct":22},"对于承包人原因造成超出施工图纸范围施工的工程量，不予计量",{"key":49,"text":463,"correct":22},"对工程变更引起工程量的增减变化，应据实调整，正确计量",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1139669,"某工程合同价6000万元，合同约定:工期6个月，预付款120万元，每月进度款按实际完成工程价款的80%支付；每月再单独支付安全文明施工费50万元；质量保证金按进度款的3%逐月扣留；预付款在最后两个月等额扣回。2018真题承包人每月实际完成工程价款金额如下表，则第2个月发包人实际应支付的工程款金额为（）万元。2018真题",[468,470,472,474],{"key":20,"text":469,"correct":26},"850.0",{"key":24,"text":471,"correct":22},"826.0",{"key":28,"text":473,"correct":26},"824.5",{"key":31,"text":475,"correct":26},"776.0",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1139670,"某工程施工合同约定采用造价信息进行价格调整。2018真题施工期间，项目所在地省级造价管理机构发布了工人工资指导价上调10%的通知并即时生效，该工程在颁布通知当月完成的合同价款为300万元，其中人工费为60万元（已知该人工费单价比发布的指导价高出30%），则该工程当月人工费结算的做法是()。2018真题",[480,482,484,486],{"key":20,"text":481,"correct":22},"不予上调",{"key":24,"text":483,"correct":26},"按照通知要求上调10%",{"key":28,"text":485,"correct":26},"由总监理工程师确定新的单价",{"key":31,"text":487,"correct":26},"由发承包双方协商后适当调整",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1139671,"根据《建设工程施工合同示范文本》,关于工程保修及保修期的说法正确的是（）。2018真题",[492,494,496,498],{"key":20,"text":493,"correct":26},"工程保修期从交付使用之日起计算",{"key":24,"text":495,"correct":22},"具体分部分项工程的保修期可在专用条款中约定但不得低于法定最低保修年限",{"key":28,"text":497,"correct":26},"发包人未经竣工验收擅自使用工程的保修期自开始使用之日起算",{"key":31,"text":499,"correct":26},"保修期内的工程损害修复费用应全部由承包人承担",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1139672,"根据《建设工程量清单计价规范》GB50500-2013，关于提前竣工的说法，正确的是（ ）。2017真题",[504,506,508,510],{"key":20,"text":505,"correct":26},"招标人压缩的工期天数不得超过定额工期的50%",{"key":24,"text":507,"correct":26},"工程实施过程中，发包人要求合同工程提前竣工，可以不征求承包人意见",{"key":28,"text":509,"correct":22},"发承包双方约定提前竣工每日历天应补偿额度，与结算款一并支付",{"key":31,"text":511,"correct":26},"赶工费用包括人工费、材料费、机械费以及履约保函手续费的增加",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1139673,"根据《建设工程施工合同（示范文本）》，下列可能引起合同解除的事件中，属于发包人违约的情形是（）。2018真题",[516,518,520,522],{"key":20,"text":517,"correct":26},"因发包人所在国发生动乱导致合同无法履行连续超过100天",{"key":24,"text":519,"correct":26},"因罕见暴雨导致合同无法履行连续超过了20天",{"key":28,"text":521,"correct":22},"因发包人原因未能在计划开工日期前7天内下达开工通知",{"key":31,"text":523,"correct":26},"承包人未按进度计划及时完成合同约定工作",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1139674,"根据《建设工程工程量清单计价规范》，某工程定额工期为25个月，合同工期为20个月。2018真题合同实施中，发包人要求该工程提前1个月竣工，征得承包人同意后，调整了合同工期。2018真题则关于该工程工期和赶工费用的说法，正确的是（）。2018真题",[528,530,532,534],{"key":20,"text":529,"correct":26},"发包人要求合同工期比定额工期提前6个月竣工，应承担提前竣工6个月的赶工费用",{"key":24,"text":531,"correct":22},"发包人要求合同工程提前1个月竣工，应承担提前竣工1个月的赶工费用",{"key":28,"text":533,"correct":26},"发包人要求压缩的工期天数超过定额工期的20%，应承担提前竣工5个月的赶工费用",{"key":31,"text":535,"correct":26},"发包人要求压缩的工期天数未超过定额工期的30%，不支付赶工费用",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1139675,"某工程项目施工合同约定竣工日期为2018年6月30日，在施工中因天气持续下雨导致甲供材料未能及时到货，使工程延误至2018年7月30日竣工，但由于2018年7月1日起当地计价政策调整，导致承包人额外支付了300万元工人工资。2018真题关于这300万元的责任承担的说法，正确的是（）。2018真题",[540,542,544,546],{"key":20,"text":541,"correct":26},"增加的300万元因政策变化造成，属于承包人的责任，应由承包人承担",{"key":24,"text":543,"correct":22},"发包人原因导致的工期延误，因此政策变化增加的300万元应由发包人承担",{"key":28,"text":545,"correct":26},"因不可抗力原因造成工期延误，增加的300万元应由承包人承担",{"key":31,"text":547,"correct":26},"工期延误是承包人原因，增加的300万元是政策变化造成，应由双方共同承担",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1139676,"某工程承包合同价为9000万元，主要材料及构件所占比重为60%，工程预付款为合同价的20%。预付款从未完施工工程尚需的主要材料及构件的价值相当于工程预付款数额时起扣，则该工程预付款起扣点为（ ）万元。",[552,554,556,558],{"key":20,"text":553,"correct":26},"9000",{"key":24,"text":555,"correct":22},"6000",{"key":28,"text":557,"correct":26},"5400",{"key":31,"text":559,"correct":26},"3000",{"id":561,"libraryId":5,"type":36,"typeLabel":37,"stem":562,"options":563,"answer":574,"analysis":33},1139677,"根据《建设工程施工合同（示范文本）》,关于变更权的说法，正确的有（）。2018真题",[564,566,568,570,572],{"key":20,"text":565,"correct":22},"发包人和监理人均可以提出变更",{"key":24,"text":567,"correct":26},"承包人可以根据施工的需要对工程非重要的部分做出适当变更",{"key":28,"text":569,"correct":26},"监理人发出变更指示一般无需征得发包人的同意",{"key":31,"text":571,"correct":22},"变更指示均通过监理人发出",{"key":49,"text":573,"correct":26},"设计变更超过原批准的建设规模时,承包人应先办理规划变更审批手续","AD",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1139678,"某施工项目6月份因异常恶劣的气候条件停工3天，停工费用8万元；之后因停工待图损失3万元，因施工质量不合格，返工费用4万元。根据《标准施工招标文件》，施工承包商可索赔的费用为（ ）万元。",[579,581,583,584],{"key":20,"text":580,"correct":26},"15",{"key":24,"text":582,"correct":26},"11",{"key":28,"text":375,"correct":26},{"key":31,"text":585,"correct":22},"3",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":28,"analysis":33},1139679,"某工程采用工程量清单招标，招标人公布的招标控制价为1亿元。2018真题中标人的投标报价为8900万元。2018真题经调整计算错误后的中标价为9100万元，所有合格投标人的报价平均为9200万元，则该中标人的报价浮动率为（）。2018真题",[590,592,594,596],{"key":20,"text":591,"correct":26},"8.0%",{"key":24,"text":593,"correct":26},"8.5%",{"key":28,"text":595,"correct":22},"9.0%",{"key":31,"text":597,"correct":26},"110%",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1139680,"根据《建设工程工程量清单计价规范》（GB50500——2013），工程变更引起施工方案改变并使措施项目发生变化时，承包人提出调整措施项目费用的，应事先将（ ）提交发包人确认。 (2015)",[602,604,606,608],{"key":20,"text":603,"correct":22},"拟实施的施工方案",{"key":24,"text":605,"correct":26},"索赔意向通知",{"key":28,"text":607,"correct":26},"拟申请增加的费用明细",{"key":31,"text":609,"correct":26},"工程变更的内容",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":20,"analysis":33},1139681,"根据《建设工程工程量清单计价规范》(GB50500—2013)，施工过程中发生的计日工，应按照（ ）计价。 (2015)",[614,616,618,620],{"key":20,"text":615,"correct":22},"已标价工程量清单中的计日工单价",{"key":24,"text":617,"correct":26},"计日工发生时承包人提出的综合单价",{"key":28,"text":619,"correct":26},"计日工发生当月市场人工工资单价",{"key":31,"text":621,"correct":26},"计日工发生当月造价管理部门发布的人工指导价",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":24,"analysis":33},1139682,"根据《标准施工招标文件》，在施工过程中遭遇不可抗力，承包人可以要求合理补偿（ ). (2013)",[626,628,630,632],{"key":20,"text":627,"correct":26},"费用",{"key":24,"text":629,"correct":22},"工期",{"key":28,"text":631,"correct":26},"利润",{"key":31,"text":633,"correct":26},"成本",[635,638,641,644,647,650],{"id":15,"name":636,"category":7,"favorite":637},"领导干部任职前廉政法规知识测试题",92,{"id":639,"name":640,"category":7,"favorite":15},595,"建筑结构与设备",{"id":642,"name":643,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":645,"name":646,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":648,"name":649,"category":7,"favorite":8},534,"BIM工程师",{"id":651,"name":649,"category":7,"favorite":8},535]