[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":644},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,39,50,2696,[13,34,52,64,76,87,99,111,123,135,147,159,174,186,201,213,225,235,247,262,277,289,304,319,329,341,353,365,377,389,401,413,425,439,451,466,478,486,501,513,525,537,548,560,572,583,595,606,620,629],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1139582,1,"单选题","工程量清单计价模式下，关于分部分项工程量和定额子目的说法，错误的是（ ）。2017真题",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","清单工程量是按施工图图示尺寸和工程量清单计算规则计算得到的工程净量",false,{"key":24,"text":25,"correct":22},"B","定额子目工程量应严格按照与所采用的定额相对应的工程量计算规则计算",{"key":27,"text":28,"correct":22},"C","一个清单项目对应一个定额子目时，清单工程量和定额工程量很可能不同",{"key":30,"text":31,"correct":32},"D","清单工程量是承包人履行合同义务中应予完成的实际施工工程量",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1139583,2,"多选题","根据《建设工程工程量清单计价规范》GB50500-2013，下列清单项目中，应列入其他项目清单的有（ ）。2017真题",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"计日工",{"key":24,"text":43,"correct":32},"暂估价",{"key":27,"text":45,"correct":22},"材料二次搬运费",{"key":30,"text":47,"correct":22},"工程排污费",{"key":49,"text":50,"correct":32},"E","总承包服务费","ABE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":30,"analysis":33},1139584,"某土方工程《建设工程工程量清单计价规范》签订了单价合同，招标清单中土方开挖工程量为8000m3，施工过程中承包人采用了放坡的开挖方式，完工计量时，承包人因放坡增加土方开挖量1000m3，因工作面增加土方开挖量1600m3，因施工操作不慎塌方增加土方开挖量500m3，则应予结算的土方开挖工程量为（）m3。2018真题",[56,58,60,62],{"key":20,"text":57,"correct":22},"11100",{"key":24,"text":59,"correct":22},"10600",{"key":27,"text":61,"correct":22},"9000",{"key":30,"text":63,"correct":32},"8000",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":30,"analysis":33},1139585,"根据《建设工程工程量清算单计价规范》（GB50500—2008），施工招标投标时，工程量清单应由（）负责提供。 (2012)",[68,70,72,74],{"key":20,"text":69,"correct":22},"工程招标代理机构",{"key":24,"text":71,"correct":22},"工程设计单位",{"key":27,"text":73,"correct":22},"招投标管理部门",{"key":30,"text":75,"correct":32},"招标人",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":30,"analysis":33},1139586,"根据《建设工程工程量清单计价规范》（GB50500-2013)，招标工程量清单的准确性的完整性应由（）负责． (2013)",[80,82,84,86],{"key":20,"text":81,"correct":22},"投标人",{"key":24,"text":83,"correct":22},"招标人指定的招标代理机构",{"key":27,"text":85,"correct":22},"招标人的上级部门",{"key":30,"text":75,"correct":32},{"id":88,"libraryId":5,"type":15,"typeLabel":16,"stem":89,"options":90,"answer":20,"analysis":33},1139587,"采用工程量清单招标时，提供招标工程量清单并对其完整性和准确性负责的单位是（ ）。 (2014)",[91,93,95,97],{"key":20,"text":92,"correct":32},"发布招标文件的招标人",{"key":24,"text":94,"correct":22},"发放招标文件的招标代理人",{"key":27,"text":96,"correct":22},"编制清单的工程造价咨询人",{"key":30,"text":98,"correct":22},"招标人的上级管理单位",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":24,"analysis":33},1139588,"根据《建设工程工程量清单计价规范》（GB50500-2013）编制分部分项清单时，编制人员须确定项目名称、计量单位、工程数量和（ ）。 (2015)",[103,105,107,109],{"key":20,"text":104,"correct":22},"填表须知",{"key":24,"text":106,"correct":32},"项目特征",{"key":27,"text":108,"correct":22},"项目总说明",{"key":30,"text":110,"correct":22},"项目工程内容",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":24,"analysis":33},1139589,"某分部分项工程的清单编码为010302004014，则该分部分项工程的清单项目顺序码为（ ）。 (2014)",[115,117,119,121],{"key":20,"text":116,"correct":22},"01",{"key":24,"text":118,"correct":32},"014",{"key":27,"text":120,"correct":22},"03",{"key":30,"text":122,"correct":22},"004",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":24,"analysis":33},1139590,"根据《建筑工程工程量清单计价规范》（GB 50500-2013），关于分布分项工程量清单中项目名称的说法，正确的是（）（2016）",[127,129,131,133],{"key":20,"text":128,"correct":22},"《计量规范》中的项目名称是分项工程名称，以工程主要材料命名",{"key":24,"text":130,"correct":32},"编制清单时，项目名称应根据《计量规范》的项目名称综合拟建工程实际确定",{"key":27,"text":132,"correct":22},"《计量工程》中的项目名称是分部工程名称，以工程实体命名",{"key":30,"text":134,"correct":22},"编制清单时，《计量工程》中的项目名称不能变化，但应补充项目规格、材质",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":24,"analysis":33},1139591,"招标人编制工程量清单时，对各专业工程现行（计量规范）中未包括的项目应作补充，则关于该补充项目及其编码的说法，正确的是（ ）。 (2015)",[139,141,143,145],{"key":20,"text":140,"correct":22},"该顶目编码应由对应《计量规范》的代码和三位阿拉伯数字组成",{"key":24,"text":142,"correct":32},"清单编制人应将补充项目报省级或行业工程造价管理机构备案",{"key":27,"text":144,"correct":22},"淸单编制人在最后一个清单项目后面自行补充该项目，不需编码",{"key":30,"text":146,"correct":22},"该项目按《计量规范》中相近的淸单项目编码",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":27,"analysis":33},1139592,"根据《建筑工程工程量清单计价规范》（GB50500-2013）,关于分部分项工程量清单中工程量计算的方法，正确的是（）（2016）",[151,153,155,157],{"key":20,"text":152,"correct":22},"实际施工中的各种损耗应列入措施项目费中",{"key":24,"text":154,"correct":22},"所以招标清单项目工程量按实际施工工程量计算",{"key":27,"text":156,"correct":32},"采用工程量清单计算规则计算时，工程实体的工程量是唯一的",{"key":30,"text":158,"correct":22},"计算综合单价时需考虑施工方案增加的工程量，但不考虑施工中的材料损耗",{"id":160,"libraryId":5,"type":36,"typeLabel":37,"stem":161,"options":162,"answer":173,"analysis":33},1139593,"根据《建设工程工程量清单计价规范》（GB50500-2013），编制措施项目清单时，措施项目设置的依据有（ ）。（2016）",[163,165,167,169,171],{"key":20,"text":164,"correct":22},"投标企业的资质等级与规模",{"key":24,"text":166,"correct":32},"拟建工程的常规施工组织设计",{"key":27,"text":168,"correct":32},"拟建工程的常规技术方案",{"key":30,"text":170,"correct":32},"招标文件中需要通过一定技术措施才能实现的要求",{"key":49,"text":172,"correct":22},"实施中因变更可能产生的零星工作","BCD",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1139594,"根据《建设工程工程量清单计价规范》（GB 50500-2008），垂直运输机械费应列在（ ）中。 (2012)",[178,180,182,184],{"key":20,"text":179,"correct":22},"分部分项工程量清单与计价表",{"key":24,"text":181,"correct":32},"措施项目清单与计价表",{"key":27,"text":183,"correct":22},"其他项目清单与计价汇总表",{"key":30,"text":185,"correct":22},"专业工程暂估价表",{"id":187,"libraryId":5,"type":36,"typeLabel":37,"stem":188,"options":189,"answer":200,"analysis":33},1139595,"根据《建筑工程量清单计价规范》(G B.50500-2013)，工程量清单计价计算公式正确的有( )。 (2014)",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"措施项目费=∑措施项目工程量×措施项目综合单价",{"key":24,"text":193,"correct":32},"分部分项工程费=∑分部分项工程量×分部分项工程综合单价",{"key":27,"text":195,"correct":32},"单项工程造价=∑单位工程造价",{"key":30,"text":197,"correct":22},"单位工程造价=∑分部分项工程费",{"key":49,"text":199,"correct":22},"建设项目总造价=∑单项工程造价+工程建设其他费用+建设期利息","BC",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1139596,"根据《建设工程工程量清单计价规范》（GB50500-2013），下列费用可用暂列金额支付的是（）（2016）",[205,207,209,211],{"key":20,"text":206,"correct":32},"业主提出设计变更增加的费用",{"key":24,"text":208,"correct":22},"业主提供了暂估价的材料采购费用",{"key":27,"text":210,"correct":22},"因承包人原因导致隐蔽工程质量不合格的返工费用",{"key":30,"text":212,"correct":22},"固定总价合同中材料价格上涨费用",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1139597,"根据《建设工程工程计价规范》（CB505000-2013），编制工程量清单时，计日工表中的人工应按（）列项。 (2015)",[217,219,221,223],{"key":20,"text":218,"correct":32},"工种",{"key":24,"text":220,"correct":22},"职称",{"key":27,"text":222,"correct":22},"职务",{"key":30,"text":224,"correct":22},"技术等级",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1139598,"根据《建设工程工程量清单计价规范》（GB50500-2013），不能列入其他项目清单的是（）。 （2016）",[229,231,232,233],{"key":20,"text":230,"correct":22},"专业工程暂估价",{"key":24,"text":41,"correct":22},{"key":27,"text":50,"correct":22},{"key":30,"text":234,"correct":32},"总承包人自行分包管理费",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},1139599,"（2019年真题）根据专业工程《计量规范》编制招标工程量清单时，有两种不同截面的现浇混凝土矩形柱，一种是400mm×400mm，另一种是600mm×400mm，混凝土强度均为c30，其余特征相同。则在编制清单时这两个矩形柱的清单项应()",[239,241,243,245],{"key":20,"text":240,"correct":22},"合并列项，项目名称为“矩形柱”，在项目特征中注明混凝土强度",{"key":24,"text":242,"correct":22},"分别列项，项目名称均为“现浇混凝土矩形柱”，在项目特征中注明截面尺寸",{"key":27,"text":244,"correct":32},"分别列项，一个项目名称为“C30现浇混凝士矩形柱400×400，另一个项目名称为“C30现浇混凝土矩形柱600×400”",{"key":30,"text":246,"correct":22},"合并列项，项目名称为“矩形柱(400×400，600×400）”，工程数量一栏给出合并后的工程量",{"id":248,"libraryId":5,"type":36,"typeLabel":37,"stem":249,"options":250,"answer":261,"analysis":33},1139600,"（2019年真题）根据《建设工程工程量清单计价规范》,投标人按照建设工程量清单填报投标价格时,必须与招标程量清单保持一致的有()。",[251,253,255,257,259],{"key":20,"text":252,"correct":32},"项目编码",{"key":24,"text":254,"correct":32},"项目名称",{"key":27,"text":256,"correct":32},"计量单位",{"key":30,"text":258,"correct":32},"工程量",{"key":49,"text":260,"correct":22},"工程内容","ABCD",{"id":263,"libraryId":5,"type":36,"typeLabel":37,"stem":264,"options":265,"answer":276,"analysis":33},1139601,"（2019年真题）根据《建设工程工程量清单计价规范》,关于招标工程量清单中项目特征的说法,正确的有()。",[266,268,270,272,274],{"key":20,"text":267,"correct":32},"项目特征是确定一个清单项目综合单价的重要依据",{"key":24,"text":269,"correct":22},"项目特征主要涉及项目的自身特征,不涉及项目的工艺特征",{"key":27,"text":271,"correct":32},"项目特征是区分清单项目的重要依据",{"key":30,"text":273,"correct":32},"项目特征决定了工程实体的实质内容,直接决定工程实体的自身价值",{"key":49,"text":275,"correct":22},"仅有分部分项工程量清单项目需要进行项目特征描述","ACD",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1139602,"（2020年真题）根据《建设工程量清单计价规范》，投标人可以根据需要自行增加列项的清单是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":32},"措施项目清单",{"key":24,"text":284,"correct":22},"分部分项工程量清单",{"key":27,"text":286,"correct":22},"其他项目清单",{"key":30,"text":288,"correct":22},"规费、税金清单",{"id":290,"libraryId":5,"type":36,"typeLabel":37,"stem":291,"options":292,"answer":303,"analysis":33},1139603,"（2020年真题）根据《建设工程工程量清单计价规范》，关于项目特征的说法，正确的是（ ）",[293,295,297,299,301],{"key":20,"text":294,"correct":32},"分部分工程量清单的项目特征是确定综合单价的重要依据。",{"key":24,"text":296,"correct":32},"项目特征主要涉及项目的自身特征、工艺特征及对项目施工方法可能产生可能影响的特征",{"key":27,"text":298,"correct":32},"项目名称相同、项目特征不同的清单项目应分别列项",{"key":30,"text":300,"correct":22},"项目特征应根据《计量规范》的项目特征进行统一描述，招标人不应根据拟建项目实际情况更改项目特征的描述",{"key":49,"text":302,"correct":32},"项目特征是指构成分部分项工程量清单项目、措施项目自身价格的本质特征","ABCE",{"id":305,"libraryId":5,"type":36,"typeLabel":37,"stem":306,"options":307,"answer":318,"analysis":33},1139604,"（2020年真题）根据《建设工程工程量清单计价规范》关于措施项目清单编制的说法。正确的有（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":32},"编制总价措施项目清单时应列出项目编码、项目名称，并按照现行计量规范的规定计算其工程量，不需要列出计量单位和项目特征",{"key":24,"text":311,"correct":22},"环境保护、安全文明施工和二次搬运等措施项目清单应根据工程本身的因素列项，不需考虑不同施工企业的实际情况",{"key":27,"text":313,"correct":32},"编制单价措施项目清单时应列出项目编码、项目名称、项目特征和计量单位，并按现行计量规范的规定计算其工程量",{"key":30,"text":315,"correct":32},"不同承包人对于同工程可能采用的施工措施不完全一致,因此措施项目清单应允许承包人根据拟建工程的实际情况列项",{"key":49,"text":317,"correct":32},"参考拟建工程的常规施工技术方案以确定大型机械设备进出场及安拆、混凝土模板和脚手架等措施项目","ACDE",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1139605,"实行工程量清单计价的招标工程，投标人可完全自主报价的是（ ）。2017真题",[323,325,326,327],{"key":20,"text":324,"correct":22},"暂列金额",{"key":24,"text":50,"correct":32},{"key":27,"text":230,"correct":22},{"key":30,"text":328,"correct":22},"措施项目费",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":30,"analysis":33},1139606,"根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程量清单编制的说法，正确的是( )。 (2014)",[333,335,337,339],{"key":20,"text":334,"correct":22},"综合单价包括应由招标人承担的全部风险费用",{"key":24,"text":336,"correct":22},"招标文件提供了暂估单价的材料，其材料费用应计入其他项目清单费",{"key":27,"text":338,"correct":22},"措施项目费包括规费、税金等在内",{"key":30,"text":340,"correct":32},"规费和税金必须按有关部门的规定计算，不得作为竞争性费用",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},1139607,"根据《建设工程工程量清单计价规范》GB50500-2013，投标人在确定分部分项工程的综合单价时，若出现某招标工程量清单项目特征描述与设计图纸不符，但均符合设计规范，应以（ ）为准。",[345,347,349,351],{"key":20,"text":346,"correct":32},"招标工程量清单的项目特征描述",{"key":24,"text":348,"correct":22},"设计图纸及其说明",{"key":27,"text":350,"correct":22},"设计规范",{"key":30,"text":352,"correct":22},"实际施工的项目特征",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},1139608,"根据《建设工程工程量清单计价规范》，一般情况下编制招标控制价采用的材料优选用（）。2018真题",[357,359,361,363],{"key":20,"text":358,"correct":22},"招标人的材料供应商提供的材料单价",{"key":24,"text":360,"correct":22},"近三个月当地已完工程材料结算单价的平均值",{"key":27,"text":362,"correct":32},"工程造价管理机构通过工程造价信息发布的材料单价",{"key":30,"text":364,"correct":22},"当时当地市场的材料单价",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},1139609,"招标方编制工程量清单时有以下工作:①确定项目编码:②研究招标文件，确定清单项目名称:③确定计量单位;④计算工程数量:⑤确定项目特征，正确的顺序是（）。2018真题",[369,371,373,375],{"key":20,"text":370,"correct":22},"①②③④⑤",{"key":24,"text":372,"correct":22},"①②⑤③④",{"key":27,"text":374,"correct":22},"②③⑤④①",{"key":30,"text":376,"correct":32},"②①⑤③④",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":27,"analysis":33},1139610,"根据《建设工程工程量清单计价规范》，某工程在2018年5月15日发布招标公告，规定投标文件提交截止日期为2018年6月15日，在2018年6月6日招标人公布了修改后的招标控制价（没有超过批准的投资概算）。2018真题对此情况招标人应采取的做法是（）。2018真题",[381,383,385,387],{"key":20,"text":382,"correct":22},"将投标文件提交的截止日期仍确定为2018年6月15日",{"key":24,"text":384,"correct":22},"将投标文件提交的截止日期延长到2018年6月18日",{"key":27,"text":386,"correct":32},"将投标文件提交的截止日期延长到2018年6月21日",{"key":30,"text":388,"correct":22},"宣布此次招标失败，重新组织招标",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1139611,"施工过程中必须发生，但在投标时很难具体分项预测，又无法单独列出项目内容的措施项目费用，宜采用的计价方法是（ ）。2017真题",[393,395,397,399],{"key":20,"text":394,"correct":22},"工料单价法",{"key":24,"text":396,"correct":32},"参数法",{"key":27,"text":398,"correct":22},"全费用综合单价法",{"key":30,"text":400,"correct":22},"分包法",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1139612,"根据《建设工程工程量清单计价规范》，某工程项目的钢筋由发包人在施工合同中约定与承包人一起招标采购，编制招标工程量清单时，招标人将HR335钢筋暂估价定为4200元\u002F吨，已知市场平均价格为3650元\u002F吨，若甲投标人自行采购，其采购单价低于市场平均价格，则甲投标人在投标报价时HR335钢筋应采用的单价是（）。2018真题",[405,407,409,411],{"key":20,"text":406,"correct":32},"4200元\u002F吨",{"key":24,"text":408,"correct":22},"甲投标人自行采购价格",{"key":27,"text":410,"correct":22},"3650元\u002F吨",{"key":30,"text":412,"correct":22},"预计招标采购价格",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},1139613,"根据《建设工程工程量清单计价规范》，关于投标人的投标总价编制的说法，正确的是（）。2018真题",[417,419,421,423],{"key":20,"text":418,"correct":22},"为降低投标总价，投标人可以将暂列金额降至零",{"key":24,"text":420,"correct":22},"投标总价可在分部分项工程费、措施项目费、其他项目费和规费，税金合计金额上做出优惠",{"key":27,"text":422,"correct":22},"开标前投标人来不及修改标书时，可在投标者致函中给出优惠比例，并将优惠后的总价作为新的投标价",{"key":30,"text":424,"correct":32},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":426,"libraryId":5,"type":36,"typeLabel":37,"stem":427,"options":428,"answer":318,"analysis":33},1139614,"根据《建设工程工程量清单计价规范》，关于投标人其他项目费编制的说法，正确的有（）。2018真题",[429,431,433,435,437],{"key":20,"text":430,"correct":32},"专业工程暂估价必须按照招标工程量清单中列出的金额填写",{"key":24,"text":432,"correct":22},"材料暂估价由投标人根据市场价格变动自主测算确定",{"key":27,"text":434,"correct":32},"暂列金额应按照招标工程量清单列出的金额填写，不得变动",{"key":30,"text":436,"correct":32},"计日工应按照招标工程量清单列出的项目和数量自主确定各项综合单价",{"key":49,"text":438,"correct":32},"总承包服务费应根据招标人要求提供的服务和现场管理需要自主确定",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":24,"analysis":33},1139615,"根据《建设工程工程量清单计价规范》GB50500-2013，投标人认为招标控制价编制不符合规范规定的，应在招标控制价公布后（ ）天内提交书面申请。",[443,445,447,449],{"key":20,"text":444,"correct":22},"3",{"key":24,"text":446,"correct":32},"5",{"key":27,"text":448,"correct":22},"7",{"key":30,"text":450,"correct":22},"10",{"id":452,"libraryId":5,"type":36,"typeLabel":37,"stem":453,"options":454,"answer":465,"analysis":33},1139616,"施工过程中可以作为工程量计量依据的资料有（ ）。2017真题",[455,457,459,461,463],{"key":20,"text":456,"correct":32},"质量合格证书",{"key":24,"text":458,"correct":32},"《计量规范》",{"key":27,"text":460,"correct":22},"招标工程量清单",{"key":30,"text":462,"correct":32},"技术规范",{"key":49,"text":464,"correct":32},"设计图纸","ABDE",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},1139617,"某工程的招标工程量清单中人工挖土方数量为5800m3，投标单位根据己方施工方案确定的挖土工程量为11200m3，人工、材料、机械费用之和为50元\u002Fm3，综合单价确定为80元\u002Fm3，则在如下人工挖土方分项工程的综合单价分析表汇总，“*”位置对应的数量应为（）。2018真题",[470,472,474,476],{"key":20,"text":471,"correct":32},"1.93",{"key":24,"text":473,"correct":22},"1.60",{"key":27,"text":475,"correct":22},"0.63",{"key":30,"text":477,"correct":22},"0.52",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},1139618,"投标人经复核，认为招标人公布的招标控制价未按照《建设工程工程量清单计价规范》（GB50500-2013）的规定进行编制的，应在招标控制价公布后（ ）天内向招标投标监督机构和工程造价管理机构投诉。 (2014)",[482,483,484,485],{"key":20,"text":450,"correct":22},{"key":24,"text":448,"correct":22},{"key":27,"text":446,"correct":32},{"key":30,"text":444,"correct":22},{"id":487,"libraryId":5,"type":36,"typeLabel":37,"stem":488,"options":489,"answer":500,"analysis":33},1139619,"关于工程量清单计价下施工企业投标报价原则的说法，正确的有()。 (2015)",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"投标报价由投标人自主确定",{"key":24,"text":493,"correct":32},"投标报价不得低于工程成本",{"key":27,"text":495,"correct":32},"投标人应以施工方案、技术措施等作为投标报价计算的基本条件",{"key":30,"text":497,"correct":22},"确定投标报价时不需要考虑发承包模式",{"key":49,"text":499,"correct":32},"投标报价要以招标文件中设定的发承包双方责任划分作为基础","BCE",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":30,"analysis":33},1139620,"某土方工程，招标工程量清单中挖土方工程数量为3000立方米，投标人根据地质资料和施工方案计算的实际挖土方量为3600立方米，挖土方的人、料、机费为65000元；人工运土的人、料、机费用25000元，机械运土的人、料、机费用58000元，企业管理费取人、料、机总费用的14%，利润率取人、料、机总费用与管理费和的8%，不考虑其他因素，则投标人挖土方的投标综合单价为（）元。（2016）",[505,507,509,511],{"key":20,"text":506,"correct":22},"60.19",{"key":24,"text":508,"correct":22},"50.62",{"key":27,"text":510,"correct":22},"50.16",{"key":30,"text":512,"correct":32},"60.74",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1139621,"根据《建设工程工程量清单计价规范》（GB 50500—2008）计价的某土方工程，业主方提供的清单工程量为3951m 。施工企业预计的实际施工量为7902m ，预计完成该分项工程的直接费为115265.27元，管理费为39190.19元，利润为9221.22元，不考虑风险费和其他因素，则该分项工程的综合单价应为（） (2012)",[517,519,521,523],{"key":20,"text":518,"correct":32},"41.43",{"key":24,"text":520,"correct":22},"20.71",{"key":27,"text":522,"correct":22},"29.17",{"key":30,"text":524,"correct":22},"94.48",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1139622,"某工程项目土方工程采用人工挖土方、人工运输和机械运输，招标工程量清单中挖土方数量为2000m3，投标人计算的施工挖土方数量为3800m3，取土外运，投标人计算的人工挖土费用为42000元、人工运土费用为15000元、机械运土费用38000、管理费用人、料、机之和的14%，利润取人、料、机与管理费之和的8%，根据《建设工程量清单计价规范》(GB50500-2013)，不考虑其他因素，投标人报价的挖土方综合单价为（ ）元\u002Fm3。 (2015)",[529,531,533,535],{"key":20,"text":530,"correct":22},"33.41",{"key":24,"text":532,"correct":32},"58.48",{"key":27,"text":534,"correct":22},"61.56",{"key":30,"text":536,"correct":22},"73.10",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":27,"analysis":33},1139623,"根据《建设工程工程量清单计价规范》(GB50500-2013)，关于投标报价的说法，错误的是( )。 (2014)",[541,543,544,546],{"key":20,"text":542,"correct":22},"暂列金额应按照招标工程量清单中列出的金额填写，不得变动",{"key":24,"text":430,"correct":22},{"key":27,"text":545,"correct":32},"计日工应按照招标文件中的数量和单价计算总费用",{"key":30,"text":547,"correct":22},"总承包服务费应按照招标人的要求和现场管理需要自主确定",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1139624,"关于工程量清单招标方式下投标人报价的说法，正确的是（）。 (2015)",[552,554,556,558],{"key":20,"text":553,"correct":22},"专业工程暂估价中的专业工程应由投标人自主确定价格并计入报价",{"key":24,"text":555,"correct":32},"暂估价中的材料应按暂估单价计入综合单价",{"key":27,"text":557,"correct":22},"措施项目中的总价项目应包括规费和税金",{"key":30,"text":559,"correct":22},"投标人报价时可以给予一定幅度的总价优惠",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},1139625,"根据《建设工程工程量清单计价规范》（GB 50500—2008）。采用工程量清单招标的工程，投标人在投标报价时不得作为竞争性费用的是（） (2012)",[564,566,568,570],{"key":20,"text":565,"correct":22},"夜间施工费",{"key":24,"text":567,"correct":22},"施工排水降水费",{"key":27,"text":569,"correct":32},"安全文明施工费",{"key":30,"text":571,"correct":22},"二次搬运费",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":20,"analysis":33},1139626,"根据《建设工程量清单计价规范》（GB50500-2013），适宜采用综合单价法计价的措施项目费是（ ）。（2016）",[576,578,580,582],{"key":20,"text":577,"correct":32},"脚手架工程费",{"key":24,"text":579,"correct":22},"夜间施工增加费",{"key":27,"text":581,"correct":22},"冬雨季施工增加费",{"key":30,"text":571,"correct":22},{"id":584,"libraryId":5,"type":36,"typeLabel":37,"stem":585,"options":586,"answer":276,"analysis":33},1139627,"适宜用参数法计价的措施项目费有()。 (2015)",[587,588,590,591,593],{"key":20,"text":571,"correct":32},{"key":24,"text":589,"correct":22},"混凝土模板费",{"key":27,"text":569,"correct":32},{"key":30,"text":592,"correct":32},"已完工程及设备保护费",{"key":49,"text":594,"correct":22},"垂直运输费",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1139628,"根据《建设工程工程量清单计价规范》（GB50500—2008），投标时可由投标企业根据其施工组织设计自主报价的是（ ） (2012)",[599,600,602,604],{"key":20,"text":569,"correct":22},{"key":24,"text":601,"correct":32},"大型机械设备进出场及安拆费",{"key":27,"text":603,"correct":22},"规费",{"key":30,"text":605,"correct":22},"税金",{"id":607,"libraryId":5,"type":36,"typeLabel":37,"stem":608,"options":609,"answer":465,"analysis":33},1139629,"根据《建设工程工程量清单计价规范》（GB 50500-2013），关于招标控制价的说法，正确的有（）。（2016）",[610,612,614,616,618],{"key":20,"text":611,"correct":32},"国有资金投资的建设工程招标，必须编制招标控制价",{"key":24,"text":613,"correct":32},"国有资金投资的建设工程招标，招标控制价应控制在已批准的投资概算内",{"key":27,"text":615,"correct":22},"招标控制价只能由具有编制能力得招标人自行编制",{"key":30,"text":617,"correct":32},"招标控制价应在招标文件中公布，不得变动",{"key":49,"text":619,"correct":32},"投标人的投标报价若高于招标控制价，其投标应被拒绝",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":24,"analysis":33},1139630,"根据《建设工程工程量清单计价规范》（GB50500-2013)，采用工程量清单招标的工程，投标人在投标报价时不得作为竞争性费用的是（ ). (2013)",[624,626,627,628],{"key":20,"text":625,"correct":22},"工程定位复测费",{"key":24,"text":605,"correct":32},{"key":27,"text":581,"correct":22},{"key":30,"text":50,"correct":22},{"id":630,"libraryId":5,"type":36,"typeLabel":37,"stem":631,"options":632,"answer":643,"analysis":33},1139631,"根据《建设工程工程量清单计价规范》（GB50500-2013)，关于招标控制价的说法，正确的有（）。 (2013)",[633,635,637,639,641],{"key":20,"text":634,"correct":32},"招标控制价是对招标工程项目规定的最高工程造价",{"key":24,"text":636,"correct":32},"招标控制价超过批准的概算时，招标人应将其报原概算审批部门审核",{"key":27,"text":638,"correct":22},"国有或非国有资金投资的建设工程招标，招标人必须编制招标控制价",{"key":30,"text":640,"correct":22},"招标控制价应在招标文件中公布，在招标过程中不应上调，但可适当下浮",{"key":49,"text":642,"correct":22},"投标人的投标报价高于招标控制价时，其投标应按废标处理","AB",[645,648,651,654,657,660],{"id":15,"name":646,"category":7,"favorite":647},"领导干部任职前廉政法规知识测试题",92,{"id":649,"name":650,"category":7,"favorite":15},595,"建筑结构与设备",{"id":652,"name":653,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":655,"name":656,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":658,"name":659,"category":7,"favorite":8},534,"BIM工程师",{"id":661,"name":659,"category":7,"favorite":8},535]