[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":624},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,38,50,2696,[13,34,46,64,76,88,100,115,127,139,151,166,178,190,201,213,228,239,247,256,265,273,285,300,312,327,339,353,368,380,391,402,414,425,438,450,459,474,486,494,509,524,532,544,555,567,579,591,600,612],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1139532,1,"单选题","某建设工程项目拟订购5台国产设备，订货价格为50万元\u002F台，设备运杂费率为8%，设备安装费率为20%，采用概算指标法确定该项目的设备安装费为（）万元（2016）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","54",false,{"key":24,"text":25,"correct":22},"B","24",{"key":27,"text":28,"correct":22},"C","20",{"key":30,"text":31,"correct":32},"D","50",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1139533,"当初步设计有详细设备清单时，编制设备及安装工程概算宜采用的编制方法是（ ). (2013)",[38,40,42,44],{"key":20,"text":39,"correct":22},"扩大单价法",{"key":24,"text":41,"correct":22},"概算指标法",{"key":27,"text":43,"correct":32},"预算单价法",{"key":30,"text":45,"correct":22},"类似工程预算法",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1139534,2,"多选题","关于建设工程项目设计概算的内容与作用的说法，正确的有（）（2016）",[52,54,56,58,60],{"key":20,"text":53,"correct":32},"设计概算是项目实施过程造价控制管理的依据",{"key":24,"text":55,"correct":32},"设计概算是考核设计方案的经济合理性和控制施工图预算的依据",{"key":27,"text":57,"correct":22},"项目总概算是反映项目从设计至竣工交付使用所需全部费用的文件",{"key":30,"text":59,"correct":22},"单位工程概算中应包括工程建设其他费用概算",{"key":61,"text":62,"correct":32},"E","政府投资项目经主管部门审批的总概算是总造价的最高限额，不得任意突破","ABE",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},1139535,"设计概算是设计单位编制和确定的建设工程项目从筹建至（ ）所需全部费用的文件。 (2012)",[68,70,72,74],{"key":20,"text":69,"correct":22},"办理完竣工结算",{"key":24,"text":71,"correct":32},"竣工交付使用",{"key":27,"text":73,"correct":22},"项目报废",{"key":30,"text":75,"correct":22},"施工保修期满",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":30,"analysis":33},1139536,"设计概算的“三级概算”是指（ ) (2013)",[80,82,84,86],{"key":20,"text":81,"correct":22},"建筑工程概算、安装工程概算、设备及工器具购置费概算",{"key":24,"text":83,"correct":22},"建设投资概算、建设期利息概算、铺底流动资金概算",{"key":27,"text":85,"correct":22},"主要工程项目概算、辅助和服务性工程项目概算、室内外工程项目概算",{"key":30,"text":87,"correct":32},"单位工程概算、单项工程综合概算、建设工程项目总概算",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1139537,"关于设计概算的说法，错误的是( )。 (2014)",[92,94,96,98],{"key":20,"text":93,"correct":22},"设计概算是确定和控制建设工程项目全部投资的文件",{"key":24,"text":95,"correct":32},"编制设计概算不需考虑建设项目施工条件对投资的影响",{"key":27,"text":97,"correct":22},"如果设计概算值超过投资建设额，必须修改设计或重新立项审批",{"key":30,"text":99,"correct":22},"设计概算由项目设计单位负责编制，并对其编制质量负责",{"id":101,"libraryId":5,"type":48,"typeLabel":49,"stem":102,"options":103,"answer":114,"analysis":33},1139538,"建设项目总概算书的内容有编制说明和( )。 (2015)",[104,106,108,110,112],{"key":20,"text":105,"correct":32},"单位工程概算表",{"key":24,"text":107,"correct":22},"分部分项工程概算表",{"key":27,"text":109,"correct":32},"单项工程综合概算表",{"key":30,"text":111,"correct":32},"工程建设其他费用概算表",{"key":61,"text":113,"correct":32},"总概算表","ACDE",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":24,"analysis":33},1139539,"某建设项目工程费用6800万元，其他费用1200万元，预备费500万元，建设期贷款利息370万元，铺底流动资金710万元。预计在建设中原房屋拆除变现收入100万元，试车收入大于支出金额150万元，则该项目总概算为（ ）万元。 (2015)",[119,121,123,125],{"key":20,"text":120,"correct":22},"9580",{"key":24,"text":122,"correct":32},"9330",{"key":27,"text":124,"correct":22},"9680",{"key":30,"text":126,"correct":22},"9430",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},1139540,"（2019年真题）某建设项目的建筑面积为10000㎡，按类似工程概算指标计算的一般土建工程单位概算造价为1158.84元\u002F㎡（其中人、料、机费用为800元\u002F㎡），项目所在地建筑安装工程管理费率为8%，按人、料、机和企业管理费计算的规费费率为15%，利润率为7%;增值税税率为9%，与类似工程概算指标规定的结构特比较，该项目结构有部分变更，换出结构构件中每100㎡的人、料、机费用为12450元，换入结构构件中每100㎡的人、料、机费用为15800元，人、料、机费用均不包含增值税可抵扣进项模额，则该项目一般土建工程修正后的概算单价为( )元\u002F㎡。",[131,133,135,137],{"key":20,"text":132,"correct":22},"833.50",{"key":24,"text":134,"correct":32},"1207.36",{"key":27,"text":136,"correct":22},"1192.34",{"key":30,"text":138,"correct":22},"1316.84",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":30,"analysis":33},1139541,"（2019年真题）采用定额单价法编制施工图预算时，若分项工程采用的主要材料品种与定额单价中规定的材料品种不一致，正确的做法是（）",[143,145,147,149],{"key":20,"text":144,"correct":22},"直接套用定额单价并通过系数调",{"key":24,"text":146,"correct":22},"偏制补充定额",{"key":27,"text":148,"correct":22},"调整材科数量，不换价",{"key":30,"text":150,"correct":32},"按实际使用材料价格换算定额单价",{"id":152,"libraryId":5,"type":48,"typeLabel":49,"stem":153,"options":154,"answer":165,"analysis":33},1139542,"（2019年真题）采用概算指标法计算设备安装工程费时,可采用的概算指标有()。",[155,157,159,161,163],{"key":20,"text":156,"correct":32},"按占设备价值百分比的概算指标",{"key":24,"text":158,"correct":32},"按每吨设备安装费的概算指标",{"key":27,"text":160,"correct":32},"按设备台、套等单位计量的概算指标",{"key":30,"text":162,"correct":22},"按占总投资百分比的概算指标",{"key":61,"text":164,"correct":32},"按设备安装工程每平方米建筑面积的概算指标","ABCE",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1139543,"（2020年真题）非经营性建设工程项目总概算的完整组成是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":32},"单项工程综合概算、工程建设其他费用概算、预备费概算、资金筹措费概算",{"key":24,"text":173,"correct":22},"建设单位工程概算、设备及安装单位工程概算和工程建设其他费用概算",{"key":27,"text":175,"correct":22},"建设单位工程概算、设备及安装单位工程概算、工程建设其他费用概算和预备费概算。",{"key":30,"text":177,"correct":22},"单项工程综合概算、工程建设其他费用概算、预备费概算、资金筹措费概算和铺地流动资金概算",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1139544,"（2020年真题）利用概算定额编制单位工程概算的工作有：①计算单位工程的人、料、机费用;②列出分项工程并计算工程量;③计算企业管理费、利润、规费和税金;④确定分部分项工程的概算定额单价;⑤计算单位工程概算造价;编制不正确的顺序是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"④②①⑤③",{"key":24,"text":185,"correct":32},"②④①③⑤",{"key":27,"text":187,"correct":22},"①②③④⑤",{"key":30,"text":189,"correct":22},"④①②③⑤",{"id":191,"libraryId":5,"type":48,"typeLabel":49,"stem":192,"options":193,"answer":200,"analysis":33},1139545,"（2020年真题）当设备清单不完备时，编制设备安装工程概算宜采用的方法有（ ）",[194,195,197,198,199],{"key":20,"text":39,"correct":32},{"key":24,"text":196,"correct":22},"生产能力指数",{"key":27,"text":43,"correct":22},{"key":30,"text":41,"correct":32},{"key":61,"text":45,"correct":22},"AD",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1139546,"审查精度高、效果好，但工作量大，时间较长的施工图预算审查方法是（ ）。 (2012)",[205,207,209,211],{"key":20,"text":206,"correct":32},"逐项审查法",{"key":24,"text":208,"correct":22},"重点审查法",{"key":27,"text":210,"correct":22},"对比审查法",{"key":30,"text":212,"correct":22},"筛选审查法",{"id":214,"libraryId":5,"type":48,"typeLabel":49,"stem":215,"options":216,"answer":227,"analysis":33},1139547,"某施工企业投标一个单独招标的分部分项工程项目，招标清单工程量为3000m3。2018真题经测算，该分部分项工程直接消耗人、料、机费用（不含增值税进项税额）为300万元，管理费为45万元，利润为40万元，风险费用为3万元，措施费（不含增值税进项税额）为60万元（其中：安全文明施工费为15万元），规费为30万元，税金为10万元。2018真题不考虑其他因素，根据《建设工程工程量清单计价规范》，关于该工程投标报价的说法，正确的有（）。2018真题",[217,219,221,223,225],{"key":20,"text":218,"correct":32},"综合单价为1293.33元\u002Fm3",{"key":24,"text":220,"correct":22},"为了中标，可将综合单价确定为990.00元\u002Fm3",{"key":27,"text":222,"correct":22},"若竞争激烈，标书可将各项费用下调10%",{"key":30,"text":224,"correct":32},"安全文明施工费应按国家或省级、行业主管部门的规定计算确定",{"key":61,"text":226,"correct":32},"投标总价为488.00万元","ADE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":27,"analysis":33},1139548,"拟建工程与在建工程预算采用同一施工图，但二者基础部分和现场施工条件不同，审查拟建工程施工图预算时，为提高效率，对其与在建工程相同部分宜采用的方法是（）。2018真题",[232,234,236,237],{"key":20,"text":233,"correct":22},"全面审查法",{"key":24,"text":235,"correct":22},"分组计算审查法",{"key":27,"text":210,"correct":32},{"key":30,"text":238,"correct":22},"标准预算审查法",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":20,"analysis":33},1139549,"施工图预算审核时，利用房屋建筑工程标准层建筑面积数对楼面找平层、天棚抹灰等工程量进行审查的方法，属于( )。 (2014)",[243,244,245,246],{"key":20,"text":235,"correct":32},{"key":24,"text":208,"correct":22},{"key":27,"text":212,"correct":22},{"key":30,"text":210,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1139550,"对采用通用图纸的多个工程施工图预算进行审查时，为节省时间，宜采用的审查方法是()。 (2013)",[251,253,254,255],{"key":20,"text":252,"correct":22},"全图审查法",{"key":24,"text":212,"correct":22},{"key":27,"text":238,"correct":32},{"key":30,"text":210,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":30,"analysis":33},1139551,"当拟建工程与已完工程的建设条件和工程设计相同时，用已完工程的预算审查和拟建工程的同类工程预算的方法是（）。 （2016）",[260,261,263,264],{"key":20,"text":238,"correct":22},{"key":24,"text":262,"correct":22},"分组审查法",{"key":27,"text":208,"correct":22},{"key":30,"text":210,"correct":32},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},1139552,"对于设计方案比较特殊，无同类工程可比，且审查精度要求高的施工图预算，适宜采用的审查方法是（）。 (2015)",[269,270,271,272],{"key":20,"text":233,"correct":32},{"key":24,"text":238,"correct":22},{"key":27,"text":210,"correct":22},{"key":30,"text":208,"correct":22},{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":30,"analysis":33},1139553,"定额单价法编制施工图预算的工作主要有：①计算工程量；②套用定额单价，计算人、料、机费用；③按计价程序计取其他费用，并汇总造价；④编制工料分析表；⑤准备资料，熟悉施工图纸，正确的步骤是（ ）。2017真题",[277,279,281,283],{"key":20,"text":278,"correct":22},"④-⑤-①-②-③",{"key":24,"text":280,"correct":22},"⑤-①-④-②-③",{"key":27,"text":282,"correct":22},"⑤-②-①-④-③",{"key":30,"text":284,"correct":32},"⑤-①-②-④-③",{"id":286,"libraryId":5,"type":48,"typeLabel":49,"stem":287,"options":288,"answer":299,"analysis":33},1139554,"施工图预算审查的重点包括（ ）。2017真题",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"审查相关的技术规范是否有错误",{"key":24,"text":292,"correct":32},"审查工程量计算是否准确",{"key":27,"text":294,"correct":32},"审查施工图预算编制中定额套用是否恰当",{"key":30,"text":296,"correct":32},"审查各项收费标准是否符合现行规定",{"key":61,"text":298,"correct":22},"审查施工图设计方案是否合理","BCD",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1139555,"关于采用定额单价法编制施工图预算的说法，错误的是（ ）。2017真题",[304,306,308,310],{"key":20,"text":305,"correct":22},"当分项工程的名称、规格、计量单位与定额单价中所列内容完全一致时，可直接套用定额单价",{"key":24,"text":307,"correct":32},"当分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，应调价不换量",{"key":27,"text":309,"correct":22},"当分项工程的主要材料的品种与定额单价中规定的材料不一致时，应该按照实际使用材料价格换算定额单价",{"key":30,"text":311,"correct":22},"当分项工程不能直接套用定额、不能换算和调整时，应编制补充单位估价表",{"id":313,"libraryId":5,"type":48,"typeLabel":49,"stem":314,"options":315,"answer":326,"analysis":33},1139556,"关于施工图预算对建设单位作用的说法，正确的有（）。2018真题",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"是确定建设项目筹资方案的依据",{"key":24,"text":319,"correct":32},"是施工图设计阶段确定建设工程项目造价的依据",{"key":27,"text":321,"correct":22},"是编制进度计划，统计完成工程量的依据",{"key":30,"text":323,"correct":32},"是确定工程招标控制价的依据",{"key":61,"text":325,"correct":32},"可以作为拨付工程进度款及办理结算的基础","BDE",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1139557,"实物量法编制施工图预算时，计算并复核工程量后紧接着进行的工作是（ ）。 (2014)",[331,333,335,337],{"key":20,"text":332,"correct":22},"套定额单价，计算人料机费用",{"key":24,"text":334,"correct":32},"套消耗定额，计算人料机消耗量",{"key":27,"text":336,"correct":22},"汇总人料机费用",{"key":30,"text":338,"correct":22},"计算管理费等其他各项费用",{"id":340,"libraryId":5,"type":48,"typeLabel":49,"stem":341,"options":342,"answer":165,"analysis":33},1139558,"在传统定额计价模式下，政府主管部产让规定的计价依据包括（ ）。 (2012)",[343,345,347,349,351],{"key":20,"text":344,"correct":32},"工程预算定额",{"key":24,"text":346,"correct":32},"工程量计算规则",{"key":27,"text":348,"correct":32},"间接费的内容",{"key":30,"text":350,"correct":22},"施工方案",{"key":61,"text":352,"correct":32},"间接费的取费标准",{"id":354,"libraryId":5,"type":48,"typeLabel":49,"stem":355,"options":356,"answer":367,"analysis":33},1139559,"建筑安装工程施工图预算的编制依据（）。 (2014)",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"中标通知书",{"key":24,"text":360,"correct":22},"现场签证",{"key":27,"text":362,"correct":32},"工程地质勘察资料",{"key":30,"text":364,"correct":32},"建设项目施工组织设计",{"key":61,"text":366,"correct":32},"批准的设计概算","CDE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},1139560,"采用定额单价法计算工程费用时，若分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，对定额的处理方法一般是（ ). (2013)",[372,374,376,378],{"key":20,"text":373,"correct":22},"编制补充单价表",{"key":24,"text":375,"correct":22},"直接套用定额单价",{"key":27,"text":377,"correct":32},"调量不调价",{"key":30,"text":379,"correct":22},"按实际价格换算定额单价",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},1139561,"采用定额单价法编制施工的预算时，如果分项过程的某一种主要材料，单价中规定的材料品种不完全一致，该分项过程单价的确定方法是（） (2015)",[384,385,387,389],{"key":20,"text":150,"correct":32},{"key":24,"text":386,"correct":22},"直接套用同类材料的定额单价",{"key":27,"text":388,"correct":22},"调整工程量而不换算定额单价",{"key":30,"text":390,"correct":22},"编制补充定额单价",{"id":392,"libraryId":5,"type":48,"typeLabel":49,"stem":393,"options":394,"answer":63,"analysis":33},1139562,"关于定额单价法编制施工图预算的说法，正确的有（）. (2013)",[395,396,398,399,401],{"key":20,"text":305,"correct":32},{"key":24,"text":397,"correct":32},"当分项工程的主要材料的品种与定额单价中规定材料不一致时，应该实际使用材料价格换算定额单价",{"key":27,"text":307,"correct":22},{"key":30,"text":400,"correct":22},"本地区同一的定额单价表中没有与本项目分项工程相应的内容时，可套用邻近地区的单价估算表",{"key":61,"text":311,"correct":32},{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},1139563,"实物量法编制施工图预算所用的材料单价应采用( )。 (2015)",[406,408,410,412],{"key":20,"text":407,"correct":22},"网上咨询厂家的报价",{"key":24,"text":409,"correct":22},"编制预算定额时采用的单价",{"key":27,"text":411,"correct":32},"当时当地的实际价格",{"key":30,"text":413,"correct":22},"预算定额中采用的单价加上运杂费",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},1139564,"实物量法编制施工图预算时采用的人工、材料、机械的单价应为（）。2018真题",[418,420,422,423],{"key":20,"text":419,"correct":22},"项目所在地定额基价中的价格",{"key":24,"text":421,"correct":22},"预测的项目建设期的市场价格",{"key":27,"text":411,"correct":32},{"key":30,"text":424,"correct":22},"定额编制时的市场价格",{"id":426,"libraryId":5,"type":48,"typeLabel":49,"stem":427,"options":428,"answer":367,"analysis":33},1139565,"施工图预算的编制依据有( )。 (2015)",[429,431,433,435,436],{"key":20,"text":430,"correct":22},"建设单位的资金到位情况",{"key":24,"text":432,"correct":22},"施工投标单位的资质等级",{"key":27,"text":434,"correct":32},"施工投标单位的施工组织设计",{"key":30,"text":366,"correct":32},{"key":61,"text":437,"correct":32},"批准的施工图设计图纸",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1139566,"关于施工图预算编制内容和要求的说法，正确的是（）。2018真题",[442,444,446,448],{"key":20,"text":443,"correct":32},"施工图总预算应控制在已批准的设计总概算投资范围以内",{"key":24,"text":445,"correct":22},"当建设项目只有一个单项工程时，则不需要编制建设项目总预算",{"key":27,"text":447,"correct":22},"单位工程预算编制依据的定额应为企业定额",{"key":30,"text":449,"correct":22},"建设项目总预算是反映建设项目施工阶段投资总额的造价文件",{"id":451,"libraryId":5,"type":48,"typeLabel":49,"stem":452,"options":453,"answer":367,"analysis":33},1139567,"施工图预算的编制依据有（）。 (2013)",[454,455,456,457,458],{"key":20,"text":430,"correct":22},{"key":24,"text":432,"correct":22},{"key":27,"text":434,"correct":32},{"key":30,"text":366,"correct":32},{"key":61,"text":437,"correct":32},{"id":460,"libraryId":5,"type":48,"typeLabel":49,"stem":461,"options":462,"answer":473,"analysis":33},1139568,"（2019年真题）运用筛选审查法审查建筑工程施工图预算时，需要先确定有关分部分项工程的建筑面积基本数值指标，其指标包括( )。",[463,465,467,469,471],{"key":20,"text":464,"correct":32},"工程量",{"key":24,"text":466,"correct":22},"能耗",{"key":27,"text":468,"correct":32},"单价",{"key":30,"text":470,"correct":32},"用工量",{"key":61,"text":472,"correct":22},"占地","ACD",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":30,"analysis":33},1139569,"（2019年真题）编制施工工图预算时，按各分项工程的工程量套取预算定额中人、料、机消耗量指标，并按类相加求取单位工程人、料、机总消耗量，再采用当时当地的人工、材料和机械台班实际价格计算汇总人、料、机费用的方法是()。",[478,480,482,484],{"key":20,"text":479,"correct":22},"定额单价法",{"key":24,"text":481,"correct":22},"工程量清单综合单价法",{"key":27,"text":483,"correct":22},"全费用综合单价法",{"key":30,"text":485,"correct":32},"实物量法",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":30,"analysis":33},1139570,"（2019年真题）拟建工程与已完工程预算采用同一施工图，但基础部分和现场施工条件不同，则施工图预算审查时对相同部分审查宜采用的方法是()",[490,491,492,493],{"key":20,"text":212,"correct":22},{"key":24,"text":208,"correct":22},{"key":27,"text":235,"correct":22},{"key":30,"text":210,"correct":32},{"id":495,"libraryId":5,"type":48,"typeLabel":49,"stem":496,"options":497,"answer":508,"analysis":33},1139571,"（2020年真题）施工图预算对于工程造价管理部门的作用主要有（ ）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"是项目立项审批的依据",{"key":24,"text":501,"correct":32},"是监督检查执行定额标准的依据",{"key":27,"text":503,"correct":32},"是合理确定工程造价的依据",{"key":30,"text":505,"correct":32},"是审定招标控制价的依据",{"key":61,"text":507,"correct":32},"是测算造价指数的依据","BCDE",{"id":510,"libraryId":5,"type":48,"typeLabel":49,"stem":511,"options":512,"answer":523,"analysis":33},1139572,"（2020年真题）与全费用综合单价相比，现行《建设工程工程量清单计价规范》中分部分项工程的综合单价中没有涵盖的项目有（ ）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"管理费",{"key":24,"text":516,"correct":32},"税金",{"key":27,"text":518,"correct":22},"利润",{"key":30,"text":520,"correct":32},"规费",{"key":61,"text":522,"correct":22},"风险费用","BD",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1139573,"（2020年真题）施工图预算审查中，若工程条件相同，用已完工程的预算审查拟建工程的同类工程预算的方法属于（ ）。",[528,529,530,531],{"key":20,"text":238,"correct":22},{"key":24,"text":210,"correct":32},{"key":27,"text":212,"correct":22},{"key":30,"text":235,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1139574,"（2020年真题）某建设项目只有一个单项工程。关于该项目施工图预算编制要求的说法,正确的是（ ）",[536,538,540,542],{"key":20,"text":537,"correct":22},"应采用三级预算编制形式",{"key":24,"text":539,"correct":32},"应采用二级预算编制形式",{"key":27,"text":541,"correct":22},"不需编制施工图预算",{"key":30,"text":543,"correct":22},"编制建设项目总预算和单项工程综合预算",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1139575,"（2020年真题）关于采用定额单价法编制施工图预算时套用定额单价的说法，错误的是（ ）。",[548,550,551,553],{"key":20,"text":549,"correct":22},"当分项工程的名称、规格、计量单位与定额单价中所列的内容完全一致时，可直接套用定额单价",{"key":24,"text":307,"correct":32},{"key":27,"text":552,"correct":22},"当分项工程的主要材料品种与定额单价中规定材料不一致时,应按实际使用材料价格换算定额单价",{"key":30,"text":554,"correct":22},"当分项工程不能直接套用定额、不能换算和调整时，应编制补充定额单价",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":30,"analysis":33},1139576,"根据《建设工程工程量清单计价规范》，在编制工程量清单时，招标人对施工中噪声污染提出防护要求的描述应列在（）中。2018真题",[559,561,563,565],{"key":20,"text":560,"correct":22},"其他项目清单的暂列金额",{"key":24,"text":562,"correct":22},"措施项目清单的项目特征",{"key":27,"text":564,"correct":22},"可能导致噪声污染的分部分项工程量清单的项目特征",{"key":30,"text":566,"correct":32},"工程量清单编制总说明",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":30,"analysis":33},1139577,"工程总承包人按照合同的约定对招标人依法单独发包的专业工程承包人提供了现场垂直运输设备，由此发生的费用属于（）。2018真题",[571,573,575,577],{"key":20,"text":572,"correct":22},"现场管理费",{"key":24,"text":574,"correct":22},"企业管理费",{"key":27,"text":576,"correct":22},"暂列金额",{"key":30,"text":578,"correct":32},"总承包服务费",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1139578,"根据《建设工程工程清单计价规范》，某工程项目设计文件中的部分工作内容不足以写进施工方案，但要通过一定的技术手段才能实现。2018真题此情况在编制工程量清单时，应列入（）。2018真题",[583,585,587,589],{"key":20,"text":584,"correct":22},"分部分项工程项目清单",{"key":24,"text":586,"correct":32},"措施项目清单",{"key":27,"text":588,"correct":22},"其他项目清单",{"key":30,"text":590,"correct":22},"规费项目清单",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1139579,"根据《建设工程工程量清单计价规范》(GB50500-2013)，投标企业可以根据拟建工程的具体施工方案进行列项的清单是( )。 (2014)",[595,597,598,599],{"key":20,"text":596,"correct":22},"分部分项工程量清单",{"key":24,"text":586,"correct":32},{"key":27,"text":588,"correct":22},{"key":30,"text":590,"correct":22},{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":30,"analysis":33},1139580,"根据《建设工程工程量清单计价规范》GB50500-2013，某分部分项工程的项目编码为01-02-03-004-005，其中“004”这一级编码的含义是（ ）。2017真题",[604,606,608,610],{"key":20,"text":605,"correct":22},"工程分类顺序码",{"key":24,"text":607,"correct":22},"清单项目顺序码",{"key":27,"text":609,"correct":22},"分部工程顺序码",{"key":30,"text":611,"correct":32},"分项工程顺序码",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":20,"analysis":33},1139581,"关于分部分项工程量清单中项目特征描述的作用的说法，错误的是（ ）。2017真题",[616,618,620,622],{"key":20,"text":617,"correct":32},"项目特征是进行概算审查的依据",{"key":24,"text":619,"correct":22},"项目特征是履行合同义务的基础",{"key":27,"text":621,"correct":22},"项目特征是确定综合单价的前提",{"key":30,"text":623,"correct":22},"项目特征是区别清单项目的依据",[625,628,631,634,637,640],{"id":15,"name":626,"category":7,"favorite":627},"领导干部任职前廉政法规知识测试题",92,{"id":629,"name":630,"category":7,"favorite":15},595,"建筑结构与设备",{"id":632,"name":633,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":635,"name":636,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":638,"name":639,"category":7,"favorite":8},534,"BIM工程师",{"id":641,"name":639,"category":7,"favorite":8},535]