[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,37,50,2696,[13,34,46,64,76,91,103,115,130,145,157,166,178,190,201,213,227,240,254,266,278,290,305,317,325,337,348,358,370,382,394,406,416,425,437,446,458,470,485,494,506,518,527,539,551,559,567,577,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1139482,1,"单选题","施工过程中对隐蔽工程质量检查验收影响工人操作的时间，属于预算定额人工消耗量指标组成中的（ ）。2017真题",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","基本用工",false,{"key":24,"text":25,"correct":22},"B","辅助用工",{"key":27,"text":28,"correct":29},"C","人工幅度差用工",true,{"key":31,"text":32,"correct":22},"D","超运距用工","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1139483,"关于单位估价表的说法，正确的是（ ）。2017真题",[38,40,42,44],{"key":20,"text":39,"correct":22},"单位估价表是由单位工程单价构成的单价表",{"key":24,"text":41,"correct":22},"工料单价单位估价表以施工定额为基本依据编制",{"key":27,"text":43,"correct":22},"单位估价表应以全国为范围进行编制",{"key":31,"text":45,"correct":29},"编制单位估价表时，材料价格应以本地区市场价格为依据",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":63,"analysis":33},1139484,2,"多选题","机械台班使用定额的编制内容包括（）。2018真题",[52,54,56,58,60],{"key":20,"text":53,"correct":29},"拟定机械作业的正常施工条件",{"key":24,"text":55,"correct":29},"确定机械纯工作1小时的正常生产率",{"key":27,"text":57,"correct":22},"拟定机械的停工时间",{"key":31,"text":59,"correct":29},"确定机械的利用系数",{"key":61,"text":62,"correct":29},"E","计算机械台班定额","ABDE",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":24,"analysis":33},1139485,"在合理的劳动组织和正常的施工条件下，完成某单位合格分项工程的时间消耗为所有班组完成时间均不超过1个工日，其中个别班组可以在0.50工日完成，多数班组经过努力可以在0.80工日完成则编制施工定额时，人工消耗宜为（）工日。2018真题",[68,70,72,74],{"key":20,"text":69,"correct":22},"1.00",{"key":24,"text":71,"correct":29},"0.80",{"key":27,"text":73,"correct":22},"0.77",{"key":31,"text":75,"correct":22},"0.50",{"id":77,"libraryId":5,"type":48,"typeLabel":49,"stem":78,"options":79,"answer":90,"analysis":33},1139486,"编制过程周转性材料消耗定额时，影响周转材料消耗的因素主要有（ ）。2017真题",[80,82,84,86,88],{"key":20,"text":81,"correct":22},"周转材料的制造工艺",{"key":24,"text":83,"correct":29},"周转使用次数",{"key":27,"text":85,"correct":29},"周转材料的最终回收及其回收折价",{"key":31,"text":87,"correct":22},"周转材料补损的难易程度",{"key":61,"text":89,"correct":29},"每周转使用一次材料的损耗","BCE",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},1139487,"编制压路机台班使用定额时，属于必需消耗的时间的是（ ）。2017真题",[95,97,99,101],{"key":20,"text":96,"correct":22},"施工组织不好引起的停工时间",{"key":24,"text":98,"correct":29},"压路机在工作区末端调头时间",{"key":27,"text":100,"correct":22},"压路机操作人员擅离岗位引起的停工时间",{"key":31,"text":102,"correct":22},"暴雨时压路机的停工时间",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1139488,"可作为建筑企业施工项目投标报价依据的定额是（ ）。2017真题",[107,109,111,113],{"key":20,"text":108,"correct":22},"概算定额",{"key":24,"text":110,"correct":29},"施工定额",{"key":27,"text":112,"correct":22},"预算定额",{"key":31,"text":114,"correct":22},"概算指标",{"id":116,"libraryId":5,"type":48,"typeLabel":49,"stem":117,"options":118,"answer":129,"analysis":33},1139489,"编制施工机械台班使用定额时，属于机械工作实践中损失时间的有（ ） (2012)",[119,121,123,125,127],{"key":20,"text":120,"correct":29},"施工本身原因造成的停工时间",{"key":24,"text":122,"correct":29},"非施工原因造成的停工时间",{"key":27,"text":124,"correct":29},"违反劳动纪律引起的时间损失",{"key":31,"text":126,"correct":22},"工人正常的休息时间",{"key":61,"text":128,"correct":29},"低负荷下的工作时间","ABCE",{"id":131,"libraryId":5,"type":48,"typeLabel":49,"stem":132,"options":133,"answer":144,"analysis":33},1139490,"编制机械台班使用定额时，机械工程必需消耗的时间包括（ ). (2013)",[134,136,138,140,142],{"key":20,"text":135,"correct":29},"不可避免的中断时间",{"key":24,"text":137,"correct":29},"不可避免的无负荷工作时间",{"key":27,"text":139,"correct":29},"有效工作时间",{"key":31,"text":141,"correct":22},"低负荷下工作时间",{"key":61,"text":143,"correct":22},"由于劳动组织不当引起的中断时间","ABC",{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":24,"analysis":33},1139491,"下列机械工作时间消耗中，属于机械台班使用定额中不可避免的无负荷工作时间的是( )。 (2015)",[149,151,153,155],{"key":20,"text":150,"correct":22},"汽车在运送上方时没有装满导致的延长时间",{"key":24,"text":152,"correct":29},"筑路机在工作区末端掉头的时间",{"key":27,"text":154,"correct":22},"未及时供给机械燃料而导致的停工时间",{"key":31,"text":156,"correct":22},"暴雨时压路机被迫停工时间",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":27,"analysis":33},1139492,"施工企业可以直接用来编制施工作业计划、签发施工任务单的定额是（ ）。（2016）",[161,162,163,164],{"key":20,"text":112,"correct":22},{"key":24,"text":108,"correct":22},{"key":27,"text":110,"correct":29},{"key":31,"text":165,"correct":22},"工器具定额",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1139493,"建设工程施工定额的研究对象是（）。 (2013)",[170,172,174,176],{"key":20,"text":171,"correct":22},"分部分项工程",{"key":24,"text":173,"correct":29},"工序",{"key":27,"text":175,"correct":22},"扩大的分部分项工程",{"key":31,"text":177,"correct":22},"整个建筑物或构筑物",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1139494,"编制和应用施工定额之所以有利于推广先进技术是因为（ ）。 (2012)",[182,184,186,188],{"key":20,"text":183,"correct":22},"施工定额是强制实施的",{"key":24,"text":185,"correct":22},"施工定额是工程定额体系的基础",{"key":27,"text":187,"correct":29},"施工定额水平本身包含成熟先进的施工技术",{"key":31,"text":189,"correct":22},"施工定额是用先进的技术方法测定出来的",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1139495,"在机械工作时间消耗分类中，由于工人装料不足引起的机械不能满负荷工作的时间属于（ ）。 (2014)",[194,196,198,200],{"key":20,"text":195,"correct":22},"有根据地降低负荷下的工作时间",{"key":24,"text":197,"correct":22},"机械的多余工作时间",{"key":27,"text":199,"correct":22},"正常负荷下的有效工作时间",{"key":31,"text":128,"correct":29},{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":20,"analysis":33},1139496,"关于企业定额作用的说法，正确的是（ ). (2013)",[205,207,209,211],{"key":20,"text":206,"correct":29},"企业定额是编制施工组织设计的依据",{"key":24,"text":208,"correct":22},"企业定额能反映在不同项目上的最高管理水平",{"key":27,"text":210,"correct":22},"依据企业定额可以计算出施工企业完成投标工程的实际成本",{"key":31,"text":212,"correct":22},"企业定额不能直接反映本企业的施工技术水平",{"id":214,"libraryId":5,"type":48,"typeLabel":49,"stem":215,"options":216,"answer":226,"analysis":33},1139497,"编制人工定额时，属于工人工作必需消耗的时间有（）（2016）",[217,219,220,222,224],{"key":20,"text":218,"correct":22},"多余和偶然工作时间",{"key":24,"text":135,"correct":29},{"key":27,"text":221,"correct":22},"施工本身造成的停工时间",{"key":31,"text":223,"correct":29},"辅助工作时间",{"key":61,"text":225,"correct":29},"准备与结束工作时间","BDE",{"id":228,"libraryId":5,"type":48,"typeLabel":49,"stem":229,"options":230,"answer":239,"analysis":33},1139498,"企业编制人工定额时要拟定施工作业的定额时间，应当包括在定额时间内的工人工作时间消耗有（ ） (2012)",[231,233,235,236,237],{"key":20,"text":232,"correct":29},"基本工作时间",{"key":24,"text":234,"correct":22},"施工组织不善造成的停工时间",{"key":27,"text":223,"correct":29},{"key":31,"text":135,"correct":29},{"key":61,"text":238,"correct":29},"准备与结束的工作时间","ACDE",{"id":241,"libraryId":5,"type":48,"typeLabel":49,"stem":242,"options":243,"answer":63,"analysis":33},1139499,"编制人工定额时需拟定施工的正常条件，其内容包括拟定( )。 (2015)",[244,246,248,250,252],{"key":20,"text":245,"correct":29},"施工作业内容",{"key":24,"text":247,"correct":29},"施工作业方法",{"key":27,"text":249,"correct":22},"施工企业技术水平",{"key":31,"text":251,"correct":29},"施工作业地点组织",{"key":61,"text":253,"correct":29},"施工作业人员组织",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},1139500,"编制预算定额人工消耗量时，人工幅度差是指人工定额中未包括的，而在一般正常施工情况下又不可避免的一些（）. (2013)",[258,260,262,264],{"key":20,"text":259,"correct":22},"返工用工",{"key":24,"text":261,"correct":22},"低效率用工",{"key":27,"text":263,"correct":22},"用工浪费",{"key":31,"text":265,"correct":29},"零星用工",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},1139501,"某机械台班产量为4m3，与之配合的工人小组由5人组成，则单位产品的人工时间定额为（ ）工日。 (2013)",[270,272,274,276],{"key":20,"text":271,"correct":22},"0．50",{"key":24,"text":273,"correct":22},"0．80",{"key":27,"text":275,"correct":22},"120",{"key":31,"text":277,"correct":29},"1.25",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},1139502,"完成某预算定额项目单位工程量的基本用工为2.8工日，辅助用工为0.7工日，超运距用工为0.9工日，人工幅度差系数为10%。该定额的人工工日消耗量为（ ）工日。 (2014)",[282,284,286,288],{"key":20,"text":283,"correct":29},"4.84",{"key":24,"text":285,"correct":22},"4.75",{"key":27,"text":287,"correct":22},"4.56",{"key":31,"text":289,"correct":22},"4.68",{"id":291,"libraryId":5,"type":48,"typeLabel":49,"stem":292,"options":293,"answer":304,"analysis":33},1139503,"编制预算定额人工消费指标时，下列人工消耗量属于人工幅度差用工的有( )。 (2014)",[294,296,298,300,302],{"key":20,"text":295,"correct":29},"施工过程中水电维修用工",{"key":24,"text":297,"correct":29},"隐蔽工程验收影响的操作时间",{"key":27,"text":299,"correct":22},"现场材料水平搬运用工",{"key":31,"text":301,"correct":22},"现场材料加工用工",{"key":61,"text":303,"correct":22},"现场筛砂子增加的用工量","AB",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1139504,"对于同类型产品规格多、工序复杂、工作量小的施工过程，若已有部分产品施工的人工定额，则其他同类型产品施工人工定额的制定适宜采用的方法是（ ）。 (2014)",[309,311,313,315],{"key":20,"text":310,"correct":29},"比较类推法",{"key":24,"text":312,"correct":22},"技术测定法",{"key":27,"text":314,"correct":22},"统计分析法",{"key":31,"text":316,"correct":22},"经验估计法",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":27,"analysis":33},1139505,"某施工企业编制砌砖墙人工定额，该企业有近5年同类工程的施工工时消耗资料，则制定人工定额适合选用的方法是（ ）。 (2015)",[321,322,323,324],{"key":20,"text":312,"correct":22},{"key":24,"text":310,"correct":22},{"key":27,"text":314,"correct":29},{"key":31,"text":316,"correct":22},{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},1139506,"某混凝土结构施工采用木模板。木模板一次净用量为200m2，模板现场制作安装不可避免的损耗率为3%，模板可周转使用5次，每次补损率为5%，该模板周转使用量为（ ）m2. (2012)",[329,331,333,335],{"key":20,"text":330,"correct":22},"41.2",{"key":24,"text":332,"correct":29},"49.44",{"key":27,"text":334,"correct":22},"43.20",{"key":31,"text":336,"correct":22},"51.50",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},1139507,"某混凝土构件采用木模板施工,木模板一次净用量为200㎡，现场制作安装不可避免的损耗率为2%，木模板可周转使用5次，每次补损率为5%，则木模板的周期使用量为（）㎡ （2016）",[341,343,344,346],{"key":20,"text":342,"correct":22},"48.00",{"key":24,"text":332,"correct":22},{"key":27,"text":345,"correct":22},"51.00",{"key":31,"text":347,"correct":29},"48.96",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":27,"analysis":33},1139508,"汽车运输重量轻而体积大的货物时，不能充分利用载重吨位因而不得不在低于其计算负荷下工作的时间应计入（）（2016）",[352,354,355,356],{"key":20,"text":353,"correct":22},"正常负荷下的工作时间",{"key":24,"text":135,"correct":22},{"key":27,"text":195,"correct":29},{"key":31,"text":357,"correct":22},"损失的工作时间",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},1139509,"预算定额作为一项综合性定额，是由组成（ ）的消耗量综合而成的。 (2014)",[362,364,366,368],{"key":20,"text":363,"correct":22},"分部工程的各分项工程",{"key":24,"text":365,"correct":22},"单位工程的各分部工程",{"key":27,"text":367,"correct":29},"分项工程的各工序",{"key":31,"text":369,"correct":22},"分项工程的各检验批",{"id":371,"libraryId":5,"type":48,"typeLabel":49,"stem":372,"options":373,"answer":381,"analysis":33},1139510,"（2019年真题）下列机械工作时间中,属于机械工作必需消耗的时间有（）",[374,375,377,378,379],{"key":20,"text":137,"correct":29},{"key":24,"text":376,"correct":22},"多余工作时间",{"key":27,"text":139,"correct":29},{"key":31,"text":141,"correct":22},{"key":61,"text":380,"correct":22},"非施工本身造成的停工时间","AC",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1139511,"（2019年真题）关于企业定额编制方法和定额水平的说法，正确的是（）",[386,388,390,392],{"key":20,"text":387,"correct":22},"人工消耗量应依据行业标准水平,分别测定基本用工和其他用工的工日数",{"key":24,"text":389,"correct":29},"企业定额应反映本企业的施工生产力水平",{"key":27,"text":391,"correct":22},"机械消耗量应依据历史数据统计分析计算,只计算净用量",{"key":31,"text":393,"correct":22},"机械台班使用量应按照项目作业环境和非正常施工条件确定,确定机械净工作效率和利用系数",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1139512,"（2019年真题）按照单位工程量和劳动定额中的时间定额计算出的基本用工数量为15工日，超运距用工量为3工日，辅助用工为2工日，人工幅度差系数为10%，则人工幅度差用工数量为()工日。",[398,400,402,404],{"key":20,"text":399,"correct":22},"1.5",{"key":24,"text":401,"correct":22},"1.7",{"key":27,"text":403,"correct":22},"1.8",{"key":31,"text":405,"correct":29},"2.0",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1139513,"（2019年真题）在进行施工作业时间研究时，下列方法中，属于计时测定方法的是( )。",[410,412,413,415],{"key":20,"text":411,"correct":22},"图纸分析法",{"key":24,"text":310,"correct":22},{"key":27,"text":414,"correct":29},"写实记录法",{"key":31,"text":316,"correct":22},{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},1139514,"（2020年真题）下列施工机械工作时间中，属于必需消耗的时间是（ ）。",[420,421,423,424],{"key":20,"text":141,"correct":22},{"key":24,"text":422,"correct":22},"多余工作和停工的时间",{"key":27,"text":137,"correct":29},{"key":31,"text":221,"correct":22},{"id":426,"libraryId":5,"type":48,"typeLabel":49,"stem":427,"options":428,"answer":436,"analysis":33},1139515,"（2020年真题）编制人工定额时，下列时间属于工人在工作班内必需消耗的时间有（ ）。",[429,430,431,433,435],{"key":20,"text":223,"correct":29},{"key":24,"text":225,"correct":29},{"key":27,"text":432,"correct":22},"材料供应不及时引起的停工时间",{"key":31,"text":434,"correct":29},"工人在工作过程中恢复体力所必需的休息时间",{"key":61,"text":234,"correct":22},"ABD",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1139516,"（2020年真题）下列定额中属于施工企业内部使用的，以工序为对象编制的定额是（ ）",[441,442,443,445],{"key":20,"text":112,"correct":22},{"key":24,"text":108,"correct":22},{"key":27,"text":444,"correct":22},"费用定额",{"key":31,"text":110,"correct":29},{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},1139517,"（2020年真题）关于编制企业定额时人、料、机消耗量和价格的说法，正确的是（ ）",[450,452,454,456],{"key":20,"text":451,"correct":22},"确定人工消耗量时，首先根据企业环境，拟定非正常状况下的施工作业条件",{"key":24,"text":453,"correct":22},"确定材料消耗量时，应根据特定项目的数据计算主要材料净用量和损耗量",{"key":27,"text":455,"correct":22},"人工价格一般情况下依据企业自身的经济状况和不同的技术等级分别计算",{"key":31,"text":457,"correct":29},"施工机械使用价格通常根据市场询价、企业和项目的具体情况确定",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1139518,"下列单位工程概算中，属于设备及安装工程概算的是（）（2016）",[462,464,466,468],{"key":20,"text":463,"correct":22},"通风空调工程概算",{"key":24,"text":465,"correct":22},"电气照明工程概算",{"key":27,"text":467,"correct":22},"弱电工程概算",{"key":31,"text":469,"correct":29},"工器具及生产家具购置费用概算",{"id":471,"libraryId":5,"type":48,"typeLabel":49,"stem":472,"options":473,"answer":484,"analysis":33},1139519,"设备安装工程概算的编制方法有（）。2018真题",[474,476,478,480,482],{"key":20,"text":475,"correct":29},"预算单价法",{"key":24,"text":477,"correct":22},"类似工程预算法",{"key":27,"text":479,"correct":29},"概算指标法",{"key":31,"text":481,"correct":29},"扩大单价法",{"key":61,"text":483,"correct":22},"单位估价表法","ACD",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1139520,"某拟建单位工程初步设计深度不够不能准确地计算工程量,但工程设计采用的技术比较成熟而又有类似工程概算指标可以利用时，编制该单位工程概算宜采用的方法是()。2018真题",[489,491,492,493],{"key":20,"text":490,"correct":22},"概算定额法",{"key":24,"text":475,"correct":22},{"key":27,"text":477,"correct":22},{"key":31,"text":479,"correct":29},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1139521,"编制设计概算文件时，各项投资的比重及各专业投资的比重等经济分析指标应放在项目总概算文件的（ ）中。",[498,500,502,504],{"key":20,"text":499,"correct":22},"总概算表",{"key":24,"text":501,"correct":22},"单项工程综合概算表",{"key":27,"text":503,"correct":22},"单位工程概算表",{"key":31,"text":505,"correct":29},"编制说明",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},1139522,"设计概算审查时，对图纸不全的复杂建筑安装工程投资，通过向同类工程的建设，施工企业征求意见判断其合理性，这种审查方法属于（）。 (2015)",[510,512,514,516],{"key":20,"text":511,"correct":22},"对比分析法",{"key":24,"text":513,"correct":22},"专家意见法",{"key":27,"text":515,"correct":29},"查询核实法",{"key":31,"text":517,"correct":22},"联合会审法",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1139523,"某工程已有详细的设计图纸，建筑结构非常明确，采用的技术很成熟，则编制该单位建筑工程概算精度最高的方法是（）。 (2013)",[522,523,524,526],{"key":20,"text":479,"correct":22},{"key":24,"text":477,"correct":22},{"key":27,"text":525,"correct":22},"修正的概算指标法",{"key":31,"text":490,"correct":29},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1139524,"根据现行规定，在审查概算的投资规模、生产能力等是否符合原批准的可行性研究报告或者立项批文时，若发现概算总投资超过原批准投资估算的（ ）以上，需要进一步审查超估算的原因。 (2015)",[531,533,535,537],{"key":20,"text":532,"correct":22},"5%",{"key":24,"text":534,"correct":29},"10%",{"key":27,"text":536,"correct":22},"3%",{"key":31,"text":538,"correct":22},"8%",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1139525,"根据《财政投资项目评审操作规程》（试行）（财办理[2002]619号），投送评审机构评审的项目概算应由项目（ ）提供。 (2012)",[543,545,547,549],{"key":20,"text":544,"correct":29},"建设单位",{"key":24,"text":546,"correct":22},"主管部门",{"key":27,"text":548,"correct":22},"设计单位",{"key":31,"text":550,"correct":22},"施工单位",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":27,"analysis":33},1139526,"某工程初步设计深度不够，不能准确计算工程量，但工程采用的技术比较成熟，又有类似工程概算指标可以使用，则编制该工程计算概算，适宜采用的方法是（）。(2012)",[555,556,557,558],{"key":20,"text":490,"correct":22},{"key":24,"text":477,"correct":22},{"key":27,"text":479,"correct":29},{"key":31,"text":475,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},1139527,"编制设备安装工程概算，当初步设计的设备清单不完备，可供采用的安装预算单价及扩大综合单价不全时，适宜采用的概算编制方法是（ ）。 (2014)",[563,564,565,566],{"key":20,"text":490,"correct":22},{"key":24,"text":481,"correct":22},{"key":27,"text":477,"correct":22},{"key":31,"text":479,"correct":29},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":31,"analysis":33},1139528,"某单位建筑工程初步设计深度不够，不能准确地计算工程量，但工程采用的技术比较成熟而又有类似指标可以利用时，编制该工程设计概算宜采用的方法是（）。 (2015)",[571,572,574,576],{"key":20,"text":481,"correct":22},{"key":24,"text":573,"correct":22},"类似工程换算法",{"key":27,"text":575,"correct":22},"生产能力指数法",{"key":31,"text":479,"correct":29},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1139529,"审查设计概算时，对一些关键设备和设施，重要装置，引进工程图纸不全，难以核算的较大投资直 采用的审查方式是（）。 （2016）",[581,582,584,586],{"key":20,"text":511,"correct":22},{"key":24,"text":583,"correct":22},"筛选审查法",{"key":27,"text":585,"correct":22},"标准预算审查法",{"key":31,"text":515,"correct":29},{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":31,"analysis":33},1139530,"某新建设项目建筑面积5000m2，按概算指标和地区材料预算单价等算出一般土建工程单位造价为1200元（其中，人、料、机费用1000元，综合费率20%）。但新建项目的设计资料与概算指标相比，其结构中有部分变更：设计资料中外墙1砖厚，预算单价200元\u002Fm3,而概算指标中外墙1砖厚，预算单价180元\u002Fm3，并且设计资料中每100m2建筑面积含外墙62m3，而概算指标中含47m3，其余条件不考虑，则调整后的一般土建工程概算单价为（ ）元\u002Fm2。 (2015)",[591,593,595,597],{"key":20,"text":592,"correct":22},"1152.72",{"key":24,"text":594,"correct":22},"1203.60",{"key":27,"text":596,"correct":22},"1487.28",{"key":31,"text":598,"correct":29},"1247.28",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":27,"analysis":33},1139531,"新建工程与某已建成工程仅外墙饰面不同，已建成工程外墙为水泥砂浆抹面，单价为8.75元\u002F㎡，每平方米建筑面积消耗量为0.852㎡；新建工程外墙为贴釉面砖，单价为49.25元\u002F㎡，每平方米建筑面积消耗量为0.814㎡，若已建成工程概算指标为536元\u002F㎡，则新建工程修正概算指标为（）元\u002F㎡（2016）",[603,605,607,609],{"key":20,"text":604,"correct":22},"576.50",{"key":24,"text":606,"correct":22},"585.25",{"key":27,"text":608,"correct":29},"568.63",{"key":31,"text":610,"correct":22},"613.26",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]