[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":636},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,28,50,2696,[13,34,46,63,75,86,98,106,118,130,142,154,165,179,191,204,216,228,240,249,264,279,291,303,315,326,340,353,368,380,389,401,414,425,437,452,464,476,488,500,512,524,536,548,560,572,587,597,609,621],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1139022,1,"单选题","标价的动态分析是假定某些因素发生变化，测定标价的变化幅度，特别是这些变化对（ ）的影响。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","风险费",false,{"key":24,"text":25,"correct":26},"B","目标利润",true,{"key":28,"text":29,"correct":22},"C","直接费",{"key":31,"text":32,"correct":22},"D","保险费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1139023,"国际工程投标报价的动态分析要考虑的因素之一是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"标价结构的合理性",{"key":24,"text":41,"correct":22},"统计计算汇总数据",{"key":28,"text":43,"correct":26},"工期延误的影响",{"key":31,"text":45,"correct":22},"单位工程价格及用工、用料的合理性",{"id":47,"libraryId":5,"type":48,"typeLabel":49,"stem":50,"options":51,"answer":62,"analysis":33},1139024,2,"多选题","国际工程投标报价前，对估价人员算出的暂时标价进行动态分析时要考虑的因素有（ ）。",[52,53,55,57,59],{"key":20,"text":43,"correct":26},{"key":24,"text":54,"correct":22},"分项工程量变化的影响",{"key":28,"text":56,"correct":22},"地质勘察资料错误的影响",{"key":31,"text":58,"correct":26},"物价和工资上涨的影响",{"key":60,"text":61,"correct":26},"E","汇率，货款利率变化的影响","ADE",{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":20,"analysis":33},1139025,"某国际工程，业主方在招标文件中规定了200万元的暂定金额。则每一个承包商在投标报价时对该项暂定金额的正确处理方式是（ ）。",[67,69,71,73],{"key":20,"text":68,"correct":26},"计入投标总报价，但承包商无权自主使用",{"key":24,"text":70,"correct":22},"计入投标总报价，并且承包商有权自主使用",{"key":28,"text":72,"correct":22},"不计入投标总价，在实际发生时由业主支付",{"key":31,"text":74,"correct":22},"不计入投标总价，由工程师决定是否使用",{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":28,"analysis":33},1139026,"国际工程投标总报价中，分包工程费包括分包价和（ ）。",[79,80,82,84],{"key":20,"text":21,"correct":22},{"key":24,"text":81,"correct":22},"现场管理费",{"key":28,"text":83,"correct":26},"总包管理费和利润",{"key":31,"text":85,"correct":22},"总部管理费",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":31,"analysis":33},1139027,"国际工程投标报价中，暂定金额的处理方式是（ ）决定其用途。",[90,92,94,96],{"key":20,"text":91,"correct":22},"计入承包商工程总报价，由承包商",{"key":24,"text":93,"correct":22},"不计入承包商工程总报价，由项目设计方",{"key":28,"text":95,"correct":22},"不计入承包商工程总报价，由业主工程师",{"key":31,"text":97,"correct":26},"计入承包商工程总报价，由业主工程师",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":31,"analysis":33},1139028,"国际工程投标报价中，暂定金额的处理方式是（ ）决定其使用方式和额度。",[102,103,104,105],{"key":20,"text":91,"correct":22},{"key":24,"text":93,"correct":22},{"key":28,"text":95,"correct":22},{"key":31,"text":97,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1139029,"在国际工程项目建筑安装工程费用中，包括在合同中的暂定金额是（ ）的备用金。",[110,112,114,116],{"key":20,"text":111,"correct":22},"承包方",{"key":24,"text":113,"correct":26},"业主方",{"key":28,"text":115,"correct":22},"供货方",{"key":31,"text":117,"correct":22},"咨询方",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1139030,"开办费未单列的投标报价，其开办费应列入（ ）之中。",[122,124,126,128],{"key":20,"text":123,"correct":22},"预提费用",{"key":24,"text":125,"correct":26},"待摊费用",{"key":28,"text":127,"correct":22},"现场管理",{"key":31,"text":129,"correct":22},"临时设施费",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1139031,"国际工程投标报价时，在工程所在国当地采购的材料设备的预算价格应按（ ）计算。",[134,136,138,140],{"key":20,"text":135,"correct":22},"投标人所在国预算价格",{"key":24,"text":137,"correct":22},"材料设备出厂价格",{"key":28,"text":139,"correct":26},"施工现场交货价格",{"key":31,"text":141,"correct":22},"当地市场价格",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1139032,"在国际工程投标报价中，（ ）不属于现场管理费。",[146,148,150,152],{"key":20,"text":147,"correct":22},"办公费",{"key":24,"text":149,"correct":26},"生产工人的基本工资",{"key":28,"text":151,"correct":22},"劳动保护费",{"key":31,"text":153,"correct":22},"固定资产使用费",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1139033,"下列费用中不应计入开办费的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"现场勘察",{"key":24,"text":161,"correct":22},"施工用水电费",{"key":28,"text":163,"correct":22},"职工交通费",{"key":31,"text":85,"correct":26},{"id":166,"libraryId":5,"type":48,"typeLabel":49,"stem":167,"options":168,"answer":62,"analysis":33},1139034,"关于国际工程招标中的暂定金额的说法，正确的有（ ）。 2016",[169,171,173,175,177],{"key":20,"text":170,"correct":26},"暂定金额的数量一般由业主在招标文件中明确.",{"key":24,"text":172,"correct":22},"承包商在投标报价时应将暂定金额在总报价之外单列",{"key":28,"text":174,"correct":22},"暂定金额只能用于应对意外情况引起的损失",{"key":31,"text":176,"correct":26},"承包商在施工中无权做主使用暂定金额",{"key":60,"text":178,"correct":26},"暂定金额应按照业主工程师的指令与决定，全部或部分使用",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":20,"analysis":33},1139035,"国际工程投标报价时，对于预计施工现场发生的办公费，正确的做法是（ ）。 2016",[183,185,187,189],{"key":20,"text":184,"correct":26},"作为待摊费用摊入到工程量表的各计价分项价格中",{"key":24,"text":186,"correct":22},"作为待摊费单列并计入投标总标价",{"key":28,"text":188,"correct":22},"作为开办费单列并计入投标总报价",{"key":31,"text":190,"correct":22},"按照其费用性质分别计入相应分项工程的人工费、材料费或机具费",{"id":192,"libraryId":5,"type":48,"typeLabel":49,"stem":193,"options":194,"answer":203,"analysis":33},1139037,"国际工程投标报价的组成中，应计入现场管理费的有（ ）。",[195,197,199,200,202],{"key":20,"text":196,"correct":26},"现场办公费",{"key":24,"text":198,"correct":22},"贷款利息",{"key":28,"text":32,"correct":22},{"key":31,"text":201,"correct":22},"保函手续费",{"key":60,"text":153,"correct":26},"AE",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":31,"analysis":33},1139038,"关于国际工程投标报价的说法，错误的是（ ）。( 2015真题 )",[208,210,212,214],{"key":20,"text":209,"correct":22},"施工企业现场管理费应作为待摊费用分摊在各项综合单价中",{"key":24,"text":211,"correct":22},"现场试验设施费作为开办费应依据招标文件决定是否单列",{"key":28,"text":213,"correct":22},"暂定金额由业主工程师决定是否全部或部分使用",{"key":31,"text":215,"correct":26},"人工费工日基价应按在工程所在国招募工人的平均日工资单价计算",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":24,"analysis":33},1139042,"分项工程的单价分析中，分摊系数等于整个工程项目的待摊费用之和除以所有分项工程的（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"施工机械使用费之和",{"key":24,"text":223,"correct":26},"直接费之和",{"key":28,"text":225,"correct":22},"人工费之和",{"key":31,"text":227,"correct":22},"材料费之和",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":28,"analysis":33},1139043,"在国际工程投标报价中，当机械设备所占比重较大、使用的均衡性较差、搁置时间过长而使其费用增大时，机械使用费一般宜采用（ ）进行计算。",[232,234,236,238],{"key":20,"text":233,"correct":22},"定额估价法",{"key":24,"text":235,"correct":22},"匡算估价法",{"key":28,"text":237,"correct":26},"作业估价法",{"key":31,"text":239,"correct":22},"概算指标法",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":28,"analysis":33},1139044,"在国际工程投标报价中，对于工程量不大、所占费用比例较小的分项工程，直接费适合采用 （ ）进行估价。",[244,245,247,248],{"key":20,"text":233,"correct":22},{"key":24,"text":246,"correct":22},"经验估计法",{"key":28,"text":235,"correct":26},{"key":31,"text":237,"correct":22},{"id":250,"libraryId":5,"type":48,"typeLabel":49,"stem":251,"options":252,"answer":263,"analysis":33},1139045,"国际工程项目标价计算中，将工程量清单中所有分项工程的合价汇总，即可计算出工程的总标价，总标价包括（ ）。",[253,255,257,259,261],{"key":20,"text":254,"correct":22},"开办费",{"key":24,"text":256,"correct":22},"利润",{"key":28,"text":258,"correct":26},"分项工程合价",{"key":31,"text":260,"correct":26},"分包工程总价",{"key":60,"text":262,"correct":26},"暂定金额","CDE",{"id":265,"libraryId":5,"type":48,"typeLabel":49,"stem":266,"options":267,"answer":278,"analysis":33},1139046,"关于国际工程投标报价中分项工程单价分析的说法，正确的有（）。2018真题",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"具有可靠定额标准的企业必须采用定额估价法进行单价分析计算",{"key":24,"text":271,"correct":22},"匡算估价法适合于工程量较大并且所占费用比例较大的分项工程",{"key":28,"text":273,"correct":26},"机械搁置时间过长又无法在定额估价中给予恰当考虑时，采用作业估价法计算机械费用更合适",{"key":31,"text":275,"correct":22},"采用作业估价法进行单价分析，估价师的实际经验直接决定估价的准确程度",{"key":60,"text":277,"correct":26},"为保证估价的正确与合理性，作业估价法的内容应包括制定施工计划和计算各项作业的资源费用等","CE",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":33},1139047,"关于工程量清单招标中计日工报价技巧的说法，正确的是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"单纯对计日工报价应报低价",{"key":24,"text":286,"correct":22},"招标文件中有名义工程量的计日工报高价",{"key":28,"text":288,"correct":26},"单纯对计日工报价应报高价",{"key":31,"text":290,"correct":22},"招标文件中有名义工程量的计日工报低价",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},1139048,"国际工程项目招标中，如果业主规定了暂定工程量的分项内容和暂定总价款，且规定所有投标人都必须在总报价中加入这笔固定金额，则投标人对该暂定工程的报价策略是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"单价可适当降低",{"key":24,"text":298,"correct":22},"总价应适当降低",{"key":28,"text":300,"correct":26},"单价可适当提高",{"key":31,"text":302,"correct":22},"总价可适当提高",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},1139049,"国际工程投标报价时，对于下列工程，正常情况下宜采用低价策略的是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"施工条件差的工程",{"key":24,"text":310,"correct":22},"技术复杂的工程",{"key":28,"text":312,"correct":26},"支付条件好的工程",{"key":31,"text":314,"correct":22},"工期要求急的工程",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":28,"analysis":33},1139050,"国际工程报价中，按照不同工程项目的不同特点、类别、施工条件等来选择报价策略时，报价可高一些的是（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"工作简单、工程量大的项目",{"key":24,"text":322,"correct":22},"竞争对手多的工程项目",{"key":28,"text":324,"correct":26},"支付条件不理想的工程",{"key":31,"text":312,"correct":22},{"id":327,"libraryId":5,"type":48,"typeLabel":49,"stem":328,"options":329,"answer":62,"analysis":33},1139051,"下列关于国际工程投标报价技巧的描述中，正确的是（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"对设计图纸不明确，估计修改后工程量要增加的，可以提高单价",{"key":24,"text":333,"correct":22},"在增加建议方案时，建议方案要具体明确，说明方案的技术关键",{"key":28,"text":335,"correct":22},"如果不得标，企业就不能生存，应采取先亏后盈法得标",{"key":31,"text":337,"correct":26},"单纯对计日工报价可以报高一些",{"key":60,"text":339,"correct":26},"运用突然降价法，一定要在准备投标报价过程中考虑好降价幅度",{"id":341,"libraryId":5,"type":48,"typeLabel":49,"stem":342,"options":343,"answer":352,"analysis":33},1139052,"国际工程投标报价时，企业要根据自身的优劣势和招标项目的特点来确定报价策略，通常情况下报价可适当高一些的工程有（ ）。",[344,345,347,348,350],{"key":20,"text":308,"correct":26},{"key":24,"text":346,"correct":26},"工期要求特别急的工程",{"key":28,"text":324,"correct":26},{"key":31,"text":349,"correct":26},"竞争对手很少的工程",{"key":60,"text":351,"correct":22},"技术含量不高且一般公司都可以做的工程","ABCD",{"id":354,"libraryId":5,"type":48,"typeLabel":49,"stem":355,"options":356,"answer":367,"analysis":33},1139054,"（2019年真题）在国际工程报价中,投标人为了既不提高总报价,又能在结算中获得更理想的经济效益,运用不平衡报价法时,可以适当偏高报价的有()。",[357,359,361,363,365],{"key":20,"text":358,"correct":26},"能早日结账收款的工程项目",{"key":24,"text":360,"correct":22},"预计不可能完全实施的早期工程项目",{"key":28,"text":362,"correct":26},"经核算预计今后工程量会增加较多的项目",{"key":31,"text":364,"correct":22},"预计工程量可能减少的后期工程项目",{"key":60,"text":366,"correct":26},"因设计图纸不明确可能导致工程量增加的项目","ACE",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1139055,"SWOT分析用于反映国际工程投标报价决策的（ ）影响因素。",[372,374,376,378],{"key":20,"text":373,"correct":22},"期望利润",{"key":24,"text":375,"correct":22},"市场条件",{"key":28,"text":377,"correct":26},"竞争程度",{"key":31,"text":379,"correct":22},"风险偏好",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},1139056,"影响国际工程投标报价决策的因素主要有：成本估算的准确性、期望利润、市场条件、竞争程度，直接影响到公司领导层决策的是（ ）。",[384,385,387,388],{"key":20,"text":377,"correct":22},{"key":24,"text":386,"correct":26},"成本估算准确性",{"key":28,"text":373,"correct":22},{"key":31,"text":375,"correct":22},{"id":390,"libraryId":5,"type":48,"typeLabel":49,"stem":391,"options":392,"answer":400,"analysis":33},1139057,"国际工程投标报价决策的影响因素包括（ ）。",[393,395,396,398,399],{"key":20,"text":394,"correct":22},"项目投资规模",{"key":24,"text":375,"correct":26},{"key":28,"text":397,"correct":22},"工程质量",{"key":31,"text":377,"correct":26},{"key":60,"text":379,"correct":26},"BDE",{"id":402,"libraryId":5,"type":48,"typeLabel":49,"stem":403,"options":404,"answer":413,"analysis":33},1139058,"影响国际工程投标报价决策的因素主要有（ ）。",[405,407,409,410,412],{"key":20,"text":406,"correct":22},"评标人员组成",{"key":24,"text":408,"correct":26},"成本估算的准确性",{"key":28,"text":379,"correct":26},{"key":31,"text":411,"correct":26},"竞争条件",{"key":60,"text":375,"correct":26},"BCDE",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1139059,"下列项目中，（ ）是一个未知数，应当根据招标具体情况、承包商对风险的承受能力等综合取定。",[418,420,422,423],{"key":20,"text":419,"correct":22},"措施费",{"key":24,"text":421,"correct":22},"规费",{"key":28,"text":256,"correct":22},{"key":31,"text":424,"correct":26},"风险金",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1139061,"关于技术方案敏感性分析的说法，正确的是（） (2012)",[429,431,433,435],{"key":20,"text":430,"correct":22},"敏感性分析只能分析单一不确定因素变化对技术方案经济效果的影响",{"key":24,"text":432,"correct":26},"敏感性分析的局限性是依靠分析人员主观经验来分析判断，有可能存在片面性",{"key":28,"text":434,"correct":22},"敏感度系数越大，表明评价指标对不确定因素越不敏感",{"key":31,"text":436,"correct":22},"敏感性分析必须考虑所有不确定因素对评价指标的影响",{"id":438,"libraryId":5,"type":48,"typeLabel":49,"stem":439,"options":440,"answer":451,"analysis":33},1139062,"若选定静态评价指标进行技术方案敏感性分析，可以选择（ ）作为不确定性因素。 (2012)",[441,443,445,447,449],{"key":20,"text":442,"correct":26},"投资额、",{"key":24,"text":444,"correct":22},"折现率",{"key":28,"text":446,"correct":26},"产品销售量",{"key":31,"text":448,"correct":26},"产品单价",{"key":60,"text":450,"correct":26},"生产成本","ACDE",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1139063,"某公司生产单一产品，设计年生产能力为3万件，单位产品的售价为380元\u002F件，单位产品可变成本为120元\u002F件，单位产品税金及附加为70元\u002F件，年固定成本为285万元。该公司盈亏平衡点的产销量为（ ）。2017真题",[456,458,460,462],{"key":20,"text":457,"correct":22},"20000",{"key":24,"text":459,"correct":22},"19000",{"key":28,"text":461,"correct":26},"15000",{"key":31,"text":463,"correct":22},"7500",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1139064,"某技术方案设计年产量为12万吨，已知单位产品的销售价格为700元（含税价格）.单位产品税金为165元，单位可变成本为250元，年固定成本为1500万元，则以价格（含税价格）表示的盈亏平衡点是（）元\u002F吨。2018真题",[468,470,472,474],{"key":20,"text":469,"correct":26},"540",{"key":24,"text":471,"correct":22},"510",{"key":28,"text":473,"correct":22},"375",{"key":31,"text":475,"correct":22},"290",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1139065,"在建设项目敏感性分析中，确定敏感性因素可以通过计算敏感度系数和（ ）来判断。",[480,482,484,486],{"key":20,"text":481,"correct":22},"盈亏平衡点",{"key":24,"text":483,"correct":22},"评价指标变动率",{"key":28,"text":485,"correct":26},"临界点",{"key":31,"text":487,"correct":22},"不确定因素变动概率",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1139066,"对某技术方案的财务净现值（FNPV）进行单因素敏感性分析，投资额、产品价格、经营成本以及汇率四个因素的敏感性分析如下图所示，则对财务净现值指标来说最敏感的因素是（）。2018真题",[492,494,496,498],{"key":20,"text":493,"correct":22},"投资额",{"key":24,"text":495,"correct":26},"产品价格",{"key":28,"text":497,"correct":22},"经营成本",{"key":31,"text":499,"correct":22},"汇率",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1139067,"关于敏感度系数SAF的说法，正确的是（）。 (2015)",[504,506,508,510],{"key":20,"text":505,"correct":22},"SAF越大，表示评价指标A对于不确定因素F越敏感",{"key":24,"text":507,"correct":26},"SAF>O表示评价指标A与不确定因素F同方向变化",{"key":28,"text":509,"correct":22},"SAF表示不确定因素F的变化额与评价指标A的变化额之间的比例",{"key":31,"text":511,"correct":22},"SAF可以直接显示不确定因素F化后评价指标A的值",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1139068,"为了进项盈亏平衡分析，需要将技术方案的运行成本划分为( )。 (2014)",[516,518,520,522],{"key":20,"text":517,"correct":22},"历史成本和现时成本",{"key":24,"text":519,"correct":22},"过去成本和现在成本",{"key":28,"text":521,"correct":22},"预算成本和实际成本",{"key":31,"text":523,"correct":26},"固定成本和可变成本",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1139069,"某技术方案的设计年产量为8万件，单位产品销售价格为100元\u002F件，单位产品可变成本为20元\u002F件，单位产品营业税金及附加为5元\u002F件,按设计生产能力生产时，年利润为200万元，则该技术方案的盈亏平衡点产销量为（ ）万件。 (2014)",[528,530,532,534],{"key":20,"text":529,"correct":26},"5.33",{"key":24,"text":531,"correct":22},"5.00",{"key":28,"text":533,"correct":22},"4.21",{"key":31,"text":535,"correct":22},"4.00",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1139070,"某项目设计年生产能力为50万件，年固定成本为300万元，单位产品可变成本为80元，单位产品营业税金及附加为5元。则以单位产品价格表示的盈亏平衡点是()元. (2015)",[540,542,544,546],{"key":20,"text":541,"correct":26},"91.00",{"key":24,"text":543,"correct":22},"86.00",{"key":28,"text":545,"correct":22},"95.00",{"key":31,"text":547,"correct":22},"85.00",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1139071,"某项目设计年产量为6万件，每件售价为1000元，单位产品可变成本为350元，单位产品营业税金及附加为150元，年固定成本为360万元，则用生产能力利用率表示的项目盈亏平衡点为（）. (2013)",[552,554,556,558],{"key":20,"text":553,"correct":26},"12%",{"key":24,"text":555,"correct":22},"30%",{"key":28,"text":557,"correct":22},"15%",{"key":31,"text":559,"correct":22},"9%",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1139072,"某技术方案，年设计生产能力为8万台，年固定成本为100万元，单位产品售价为50元，单位产品变动成本为售价的55%，单位产品销售税金及附加为售价的5%，则达到盈亏平衡点时的生产能力利用率为（）。（2016）",[564,566,568,570],{"key":20,"text":565,"correct":26},"62.50%",{"key":24,"text":567,"correct":22},"55.50%",{"key":28,"text":569,"correct":22},"60.00%",{"key":31,"text":571,"correct":22},"41.67%",{"id":573,"libraryId":5,"type":48,"typeLabel":49,"stem":574,"options":575,"answer":586,"analysis":33},1139073,"项目盈亏平衡分析中，若其债务条件不变，可以降低盈亏平衡点产量的是（）。 (2013)",[576,578,580,582,584],{"key":20,"text":577,"correct":22},"提高设计生产能力",{"key":24,"text":579,"correct":26},"降低固定成本",{"key":28,"text":581,"correct":22},"降低产品售价",{"key":31,"text":583,"correct":26},"降低单位产品变动成本",{"key":60,"text":585,"correct":22},"提高营业税金及附加率","BD",{"id":588,"libraryId":5,"type":48,"typeLabel":49,"stem":589,"options":590,"answer":596,"analysis":33},1139074,"项目盈亏平衡分析中，若其他条件不变，可以降低盈亏平衡点产量的途径有( )。 (2014)",[591,592,593,594,595],{"key":20,"text":577,"correct":22},{"key":24,"text":581,"correct":22},{"key":28,"text":585,"correct":22},{"key":31,"text":579,"correct":26},{"key":60,"text":583,"correct":26},"DE",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1139075,"某项目采用净现值指标进行敏感性分析，有关数据见下表．则各因素的敏感程度由大到小的顺序是（）。 (2013)",[601,603,605,607],{"key":20,"text":602,"correct":22},"建设投资-营业收入-经营成本",{"key":24,"text":604,"correct":22},"营业收入-经营成本-建设投资",{"key":28,"text":606,"correct":22},"经营成本-营业收入-建设投资",{"key":31,"text":608,"correct":26},"营业收入-建设投资-经营成本",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},1139076,"某技术方案进行单因素敏感性分析的结果是：产品售价下降10%时内部收益率的变化率为55%；原材料价格上涨10%时内部收益率的变化率为39%；建设投资上涨10%时内部收益率的变化率为50%；人工工资上涨10%时内部收益率的变化率为30%。则该技术方案的内部收益率对（）最敏感。（2016）",[613,615,617,619],{"key":20,"text":614,"correct":22},"人工工资",{"key":24,"text":616,"correct":26},"产品售价",{"key":28,"text":618,"correct":22},"原材料价格",{"key":31,"text":620,"correct":22},"建设投资",{"id":622,"libraryId":5,"type":48,"typeLabel":49,"stem":623,"options":624,"answer":635,"analysis":33},1139077,"某技术方案经济评价指标对甲、乙、丙三个不确定因素的敏感度系数分别为-0.1、0.05、0.09，据此可以得出的结论有( )。 (2014)",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"经济评价指标对于甲因素最敏感",{"key":24,"text":628,"correct":22},"甲因素下降10%，方案达到盈亏平衡",{"key":28,"text":630,"correct":22},"经济评价指标与丙因素反方向变化",{"key":31,"text":632,"correct":26},"经济评价指标对于乙因素最不敏感",{"key":60,"text":634,"correct":22},"丙因素上升9%，方案由可行转为不可行","AD",[637,640,643,646,649,652],{"id":15,"name":638,"category":7,"favorite":639},"领导干部任职前廉政法规知识测试题",92,{"id":641,"name":642,"category":7,"favorite":15},595,"建筑结构与设备",{"id":644,"name":645,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":647,"name":648,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":650,"name":651,"category":7,"favorite":8},534,"BIM工程师",{"id":653,"name":651,"category":7,"favorite":8},535]