[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":639},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,27,50,2696,[13,34,46,58,70,82,94,106,118,136,146,158,168,179,194,202,214,226,238,253,268,283,292,304,316,330,345,357,369,381,393,405,419,431,445,457,469,481,493,505,517,532,544,556,568,580,591,601,615,627],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1138953,1,"单选题","根据《建设工程工程量清单计价规范》（GB50500—2013），签约合同中的暂估材料在确定单价以后，其相应项目综合单价的处理方式是（ ）。( 2015真题 )",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","在综合单价中用确定单价代替原暂估价，并调整企业管理费，不调整利润",false,{"key":24,"text":25,"correct":22},"B","在综合单价中用确定单价代替原暂估价，并调整企业管理费和利润",{"key":27,"text":28,"correct":22},"C","综合单价不做调整",{"key":30,"text":31,"correct":32},"D","在综合单价中用确定单价代替原暂估价，不再调整企业管理费和利润",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1138954,"根据《建设工程施工合同（建设工程施工合同（示范文本）》（GF-2013-0201）承包人采购材料和工程设备的，应在合同中约定主要材料、工程设备价格变化的范围或幅度；当没有约定，且材料、工程设备单价变化超过（ ）时，超过部分的价格应按照价格指数调整法或造价信息差额调整法计算调整材料、工程设备费。( 2015真题 )",[38,40,42,44],{"key":20,"text":39,"correct":22},"10%",{"key":24,"text":41,"correct":32},"5%",{"key":27,"text":43,"correct":22},"4%",{"key":30,"text":45,"correct":22},"3%",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1138958,"（2019年真题）某工程在施工过程中因不可抗力造成如下损失:永久工程损坏修复费用16万元，承包人受伤人员医药费4万元，施工机具损害损失6万元，应发包人要求赶工发生费用2万元，停工期间应发包人要求承包人清理现场费用4万元。承包人及时向项目监理机构提出索赔申请，并附有相关证明材料。根据《建设工程施工合同(示范文本)》，项目监理机构应批准的索赔金额为()万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"20",{"key":24,"text":53,"correct":22},"24",{"key":27,"text":55,"correct":32},"22",{"key":30,"text":57,"correct":22},"32",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1138959,"（2020年真题）某施工项目因80年一遇的特大暴雨停工10天，承包人在停工期间按照发包人要求照管工程发生费用2万元，承包人施工机具损坏损失10万元，已经建成的永久工程损坏损失20万元，之后应发包人要求修复被暴雨冲毁的道路花费2.5万元，修复道路时因施工质量问题发生返工费用1万元。根据《建设工程施工合同(示范文本)》，以上事件产生的费用和损失中，承包人应承担（ ）万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"21.0",{"key":24,"text":65,"correct":22},"13.5",{"key":27,"text":67,"correct":32},"11.0",{"key":30,"text":69,"correct":22},"10.0",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1138963,"根据《建设工程价款结算暂行办法》（财建[2004]369号），包工包料的工程原则上预付款比例上限为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"合同金额（扣除暂列金额）的20%",{"key":24,"text":77,"correct":32},"合同金额（扣除暂列金额）的30%",{"key":27,"text":79,"correct":22},"合同金额（不扣除暂列金额）的20%",{"key":30,"text":81,"correct":22},"合同金额（不扣除暂列金额）的30%",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1138964,"FIDIC施工合同条件下，工程量清单项目不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"一般项目",{"key":24,"text":89,"correct":32},"材料设备预付款",{"key":27,"text":91,"correct":22},"暂列金额",{"key":30,"text":93,"correct":22},"计日工作",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1138965,"根据《建设工程价款结算暂行办法》，建设工程承发包双方未在合同中对工程进度款支付时间、支付比例等作约定的，发包人应该在批准工程进度款支付申请的（ ）天内，向承包人支付规定比例范围内的工程进度款。",[98,100,102,104],{"key":20,"text":99,"correct":22},"7",{"key":24,"text":101,"correct":22},"28",{"key":27,"text":103,"correct":22},"56",{"key":30,"text":105,"correct":32},"14",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1138966,"某包工包料工程合同总金额为1000万元，工程预付款的比例为20%，主要材料、构件所占比重为50%，按起扣点基本计算公式，则工程累计完成至（ ）万元时应开始扣工程预付款。",[110,112,114,116],{"key":20,"text":111,"correct":32},"600",{"key":24,"text":113,"correct":22},"200",{"key":27,"text":115,"correct":22},"400",{"key":30,"text":117,"correct":22},"800",{"id":119,"libraryId":5,"type":120,"typeLabel":121,"stem":122,"options":123,"answer":135,"analysis":33},1138967,2,"多选题","FIDIC施工合同条件下，工程变更也是工程支付中一个重要项目。工程变更费用的支付依据是（ ）。",[124,126,128,130,132],{"key":20,"text":125,"correct":22},"签发的期中支付证书",{"key":24,"text":127,"correct":32},"工程变更令",{"key":27,"text":129,"correct":22},"工程师的指示",{"key":30,"text":131,"correct":32},"工程师对变更项目所确定的变更费用",{"key":133,"text":134,"correct":22},"E","正式所付款额的收据","BD",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":20,"analysis":33},1138968,"FIDIC施工合同条件下，工程量清单以外项目的保留金限额一般为合同总造价的（ ）。",[140,141,142,144],{"key":20,"text":41,"correct":32},{"key":24,"text":39,"correct":22},{"key":27,"text":143,"correct":22},"15%",{"key":30,"text":145,"correct":22},"20%",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":30,"analysis":33},1138969,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程计量的说法，正确的是（ ）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"发包人应在收到承包人已完成工程量报告后14天核实",{"key":24,"text":153,"correct":22},"总价合同的工程量必须以原始的施工图纸为依据计量",{"key":27,"text":155,"correct":22},"所有工程内容必须按月计量",{"key":30,"text":157,"correct":32},"单价合同的工程量必须以承包人完成合同工程应予计量的工程量确定",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":20,"analysis":33},1138970,"某工程合同总额为2000万元，工程预付款为400万元，主要材料、构件所占比重为50%，则当工程完成（ ）万元时，本项工程预付款开始起扣。",[162,164,165,166],{"key":20,"text":163,"correct":32},"1200",{"key":24,"text":117,"correct":22},{"key":27,"text":115,"correct":22},{"key":30,"text":167,"correct":22},"1000",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":27,"analysis":33},1138971,"某工程合同总额300万元，工程预付款为合同总额的20%，主要材料、构件占合同总额的50%，则工程预付款的起扣点为（ ）万元。",[172,173,175,177],{"key":20,"text":113,"correct":22},{"key":24,"text":174,"correct":22},"150",{"key":27,"text":176,"correct":32},"180",{"key":30,"text":178,"correct":22},"140",{"id":180,"libraryId":5,"type":120,"typeLabel":121,"stem":181,"options":182,"answer":193,"analysis":33},1138973,"根据《企业安全生产费用提取和使用管理方法》（财企[2012]16号），关于安全文明施工费的说法，正确的有（ ）。 2016",[183,185,187,189,191],{"key":20,"text":184,"correct":32},"发包人应在开工后28天内预付不低于当年施工进度计划的安全文明施工费总额的50%",{"key":24,"text":186,"correct":32},"承包人对安全文明施工费应专款专用，不得挪作他用",{"key":27,"text":188,"correct":32},"承包人应将安全文明施工费在财务账目中单独列项备查",{"key":30,"text":190,"correct":22},"发包人没有按时支付安全文明施工费的，承包人可以直接停工",{"key":133,"text":192,"correct":22},"发包人在付款期满后7天内仍未支付安全文明施工费的，若发生安全事故，发包人承担全部责任","ABC",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":27,"analysis":33},1138974,"某工程项目预付款120万元，合同约定：每月进度款按结算价的80%支付；每月支付安全文明施工费20万元；预付款从开工的第4个月起分3个月等额扣回，开工后前6个月结算价如下表，则第5个月应支付的款项为（ ）万元。( 2015真题 )",[198,199,200,201],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1138975,"因修改设计导致现场停工而引起施工索赔时，承包商自有施工机械的索赔费用宜按机械（ ）计算。",[206,208,210,212],{"key":20,"text":207,"correct":22},"租赁费",{"key":24,"text":209,"correct":22},"台班费",{"key":27,"text":211,"correct":32},"折旧费",{"key":30,"text":213,"correct":22},"大修理费",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1138976,"现场签证费用的计价方式中，对于完成合同以外的零星工作时，按（ ）计算。",[218,220,222,224],{"key":20,"text":219,"correct":32},"计日工作单价",{"key":24,"text":221,"correct":22},"合同中的约定",{"key":27,"text":223,"correct":22},"计日工作调整单价",{"key":30,"text":225,"correct":22},"合同约定的一定比例",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1138977,"根据《标准施工招标文件》，在施工过程中遭遇不可抗力，承包人可以要求合理补偿（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"费用",{"key":24,"text":233,"correct":32},"工期",{"key":27,"text":235,"correct":22},"利润",{"key":30,"text":237,"correct":22},"成本",{"id":239,"libraryId":5,"type":120,"typeLabel":121,"stem":240,"options":241,"answer":252,"analysis":33},1138978,"现场签证的指发、承包双方现场代表（或其委托人）就施工过程中涉及的责任事件所作的签认证明。现场签证的范围一般包括（ ）。",[242,244,246,248,250],{"key":20,"text":243,"correct":32},"施工合同范围以外零星工程的确认",{"key":24,"text":245,"correct":22},"施工单位的原因导致的人工、设备窝工及有关损失",{"key":27,"text":247,"correct":32},"在工程施工过程中发生变更扣需要现场确认的工程量",{"key":30,"text":249,"correct":22},"符合施工合同规定的施工单位原因引起的工程量或费用增减",{"key":133,"text":251,"correct":32},"确认修改施工方案引起的工程量或费用增减，以及工程变更导致的工程施工措施费增减","ACE",{"id":254,"libraryId":5,"type":120,"typeLabel":121,"stem":255,"options":256,"answer":267,"analysis":33},1138979,"索赔费的组成中，人工费包括（ ）。",[257,259,261,263,265],{"key":20,"text":258,"correct":32},"增加的管理人员工资",{"key":24,"text":260,"correct":22},"材料用量的增加",{"key":27,"text":262,"correct":32},"增加工作内容的人工费",{"key":30,"text":264,"correct":32},"停工损失费",{"key":133,"text":266,"correct":32},"工作效率降低的损失费","ACDE",{"id":269,"libraryId":5,"type":120,"typeLabel":121,"stem":270,"options":271,"answer":282,"analysis":33},1138980,"按照《工程量清单计价规范》规定，下列事件需要进行现场签证的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"由于施工企业责任造成的设备窝工损失",{"key":24,"text":275,"correct":32},"确认修改施工方案引起的工程量增减",{"key":27,"text":277,"correct":32},"非施工单位原因导致的人工窝工损失",{"key":30,"text":279,"correct":32},"工程变更导致的工程施工措施费增减",{"key":133,"text":281,"correct":22},"索赔导致的费用","BCD",{"id":284,"libraryId":5,"type":120,"typeLabel":121,"stem":285,"options":286,"answer":282,"analysis":33},1138981,"根据《建设工程工程量清单计价规范》(GB 50500--2008)，下列事件需要进行现场签证的有（ ）。",[287,288,289,290,291],{"key":20,"text":273,"correct":22},{"key":24,"text":275,"correct":32},{"key":27,"text":277,"correct":32},{"key":30,"text":279,"correct":32},{"key":133,"text":281,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":30,"analysis":33},1138982,"(2014真题)某工程承包合同总额为9000万元，主要材料及构件所占比重为60%，工程预付款为合同总额的20%，则工程预付款起扣点为()万元。",[296,298,300,302],{"key":20,"text":297,"correct":22},"1800",{"key":24,"text":299,"correct":22},"3600",{"key":27,"text":301,"correct":22},"5400",{"key":30,"text":303,"correct":32},"6000",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":30,"analysis":33},1138984,"某建设工程施工过程中，由发包人供应的材料没有及时到货，导致承包人的工人窝工5个工作日，每个工日单价为200元；承包人租赁的一台挖土机窝工5个台班，台班租赁费为500元；承包人自有的一台卸汽车窝工2个台班，该自卸汽车折旧费每台300元，工作时燃油动力费每台班80元。则承包人可以索赔的费用是（ ）元。",[308,310,312,314],{"key":20,"text":309,"correct":22},"2500",{"key":24,"text":311,"correct":22},"3500",{"key":27,"text":313,"correct":22},"4260",{"key":30,"text":315,"correct":32},"4100",{"id":317,"libraryId":5,"type":120,"typeLabel":121,"stem":318,"options":319,"answer":267,"analysis":33},1138988,"《计价规范》中规定发承包双方发生工程造价合同纠纷时，争议的解决办法包括（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":32},"协商",{"key":24,"text":323,"correct":22},"讨论",{"key":27,"text":325,"correct":32},"调解",{"key":30,"text":327,"correct":32},"诉讼",{"key":133,"text":329,"correct":32},"仲裁",{"id":331,"libraryId":5,"type":120,"typeLabel":121,"stem":332,"options":333,"answer":344,"analysis":33},1138989,"(2014真题)国际工程投标总报价组成中，应计入现场管理费的有()。",[334,336,338,340,342],{"key":20,"text":335,"correct":32},"差旅交通费",{"key":24,"text":337,"correct":22},"临时设施工程费",{"key":27,"text":339,"correct":22},"工程辅助费",{"key":30,"text":341,"correct":32},"劳动保护费",{"key":133,"text":343,"correct":32},"检验试验费","ADE",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},1138993,"某工程合同价6000万元，合同约定:工期6个月，预付款120万元，每月进度款按实际完成工程价款的80%支付；每月再单独支付安全文明施工费50万元；质量保证金按进度款的3%逐月扣留；预付款在最后两个月等额扣回。2018真题承包人每月实际完成工程价款金额如下表，则第2个月发包人实际应支付的工程款金额为（）万元。2018真题",[349,351,353,355],{"key":20,"text":350,"correct":22},"850.0",{"key":24,"text":352,"correct":32},"826.0",{"key":27,"text":354,"correct":22},"824.5",{"key":30,"text":356,"correct":22},"776.0",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":27,"analysis":33},1138995,"受承包人委托编制的竣工结算应有工程造价咨询机构（ ）签字、盖章。",[361,363,365,367],{"key":20,"text":362,"correct":22},"经营业务人员",{"key":24,"text":364,"correct":22},"技术总监",{"key":27,"text":366,"correct":32},"法定代表人",{"key":30,"text":368,"correct":22},"财务总监",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1138996,"采用工程量清单计价的工程在竣工决算时，暂估价中的材料单价应按（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"承包方自行购买该材料的单价计入综合单价确定",{"key":24,"text":376,"correct":32},"发、承包双方最终确认价在综合单价中调整",{"key":27,"text":378,"correct":22},"招标文件中的暂估价定",{"key":30,"text":380,"correct":22},"市场价格信息在综合单价中调整",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1138997,"工程竣工结算由（ ）编制。",[385,387,389,391],{"key":20,"text":386,"correct":22},"发包人",{"key":24,"text":388,"correct":32},"承包人或受其委托的具有相应资质的工程造价咨询人",{"key":27,"text":390,"correct":22},"受发包人委托的具有相应资质的工程造价咨询人",{"key":30,"text":392,"correct":22},"发承包双方共同配合",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},1138998,"工程竣工结算书编制与核对的责任分工是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"发包人编制，承包人核对",{"key":24,"text":400,"correct":22},"监理机构编制，发包人核对",{"key":27,"text":402,"correct":32},"承包人编制，发包人核对",{"key":30,"text":404,"correct":22},"造价咨询人编制，承包人核对",{"id":406,"libraryId":5,"type":120,"typeLabel":121,"stem":407,"options":408,"answer":267,"analysis":33},1138999,"根据现行《建设工程价款结算暂行办法》，发包人未在合同约定的时间内向承包人支付工程竣工结算价款时，承包人可以采取的措施有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":32},"向发包人催促按约定支付工程结算价款",{"key":24,"text":412,"correct":22},"将该工程留置不予交付使用",{"key":27,"text":414,"correct":32},"向发包人要求按银行同期贷款利率支付拖欠工程价款的利息",{"key":30,"text":416,"correct":32},"与发包人协商将该工程折价抵款",{"key":133,"text":418,"correct":32},"向人民法院申请将该工程依法拍卖",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":30,"analysis":33},1139000,"(2014真题)按照国际工程投标报价的程序，投标人在参加标前会议之前应该进行的工作是()。",[423,425,427,429],{"key":20,"text":424,"correct":22},"分包工程询价",{"key":24,"text":426,"correct":22},"人工、材料、机械基础单价计算",{"key":27,"text":428,"correct":22},"生产要素询价",{"key":30,"text":430,"correct":32},"进行各项调查研究",{"id":432,"libraryId":5,"type":120,"typeLabel":121,"stem":433,"options":434,"answer":252,"analysis":33},1139002,"（2020年真题）根据《建设工程施工合同(示范文本)》对已缴纳履约保证金的承包人，其提交的竣工结算申请单的内容应包括（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":32},"竣工结算合同价格",{"key":24,"text":438,"correct":22},"已经处理完的索赔资料",{"key":27,"text":440,"correct":32},"发包人已支付承包人的款项",{"key":30,"text":442,"correct":22},"应扣留的质保金",{"key":133,"text":444,"correct":32},"发包人应支付承包人的合同价款",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1139004,"（2019年真题）根据《建设工程施工合同(示范文本)》通用合同条款，关于工程保修的说法，正确的是()",[449,451,453,455],{"key":20,"text":450,"correct":22},"保修期内因发包人使用不当造成工程的缺陷和损坏，可以委托承包人修复，发包人承担修复的数用但不用支付承包人利润",{"key":24,"text":452,"correct":22},"保修期内因发包人原因造成工程的缺陷和损坏，承包人应负责修复并承担修复的费用，但不承担因工程缺陷和损坏造成的人身及财产损失",{"key":27,"text":454,"correct":32},"保修期内因特大地震造成工程的缺陷和损坏，可以委托承包人修复，发包人承担修复的费用并支付承包人合理的利润",{"key":30,"text":456,"correct":22},"保修期内发包人发现已接收的工程存在任何缺陷应书面通知承包人修复，承包人接到通如后应在48小时内到工程现场修复缺陷",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1139005,"（2020年真题）根据《建设工程施工合同(示范文本)》关于工程保修期的说法，正确的是（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":32},"发包人未经竣工验收擅自使用工程的保修期，自转移占有之日起算",{"key":24,"text":464,"correct":22},"各分部工程的保修期应该是相同的",{"key":27,"text":466,"correct":22},"工程保修期从工程完工之日起起算",{"key":30,"text":468,"correct":22},"工程保修期可以根据具体情况适当低于法定最低保修年限",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},1139006,"（2020年真题）根据《建设工程施工合同(示范文本)》，质量保证金扣留的方式原则上采用（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":32},"在支付工程进度款时逐次扣留",{"key":24,"text":476,"correct":22},"工程竣工结算时一次性扣留",{"key":27,"text":478,"correct":22},"按照里程碑扣留",{"key":30,"text":480,"correct":22},"签订合同后一次性扣留",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":30,"analysis":33},1139007,"根据《建设工程施工合同(示范文本)》,下列可能引起合同解除的事件中,属于发包人违约的情形是（ ）。2018年",[485,487,489,491],{"key":20,"text":486,"correct":22},"因发包人所在国发生动乱导致合同无法履行连续超过100天",{"key":24,"text":488,"correct":22},"因罕见暴雨导致合同无法履行连续超过了20天",{"key":27,"text":490,"correct":22},"承包人未按进度计划及时完成合同约定工作",{"key":30,"text":492,"correct":32},"因发包人原因未能在计划开工日期前7天下达开工通知",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1139008,"根据《建设工程造价鉴定规范》，由于承包人违约导致合同解除的费用争议，发包人出具的鉴定费用中包括的费用是（）2019年",[497,499,501,503],{"key":20,"text":498,"correct":32},"完成永久工程的价款",{"key":24,"text":500,"correct":22},"遣散人员的费用",{"key":27,"text":502,"correct":22},"撤离现场的费用",{"key":30,"text":504,"correct":22},"已付款的材料等物品金额（归承包人所有）",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":30,"analysis":33},1139009,"《根据建设工程造价鉴定规范》下列现场签证争议鉴定的做法，正确的是()。2020年",[509,511,513,515],{"key":20,"text":510,"correct":22},"现场签证明确了人工、材料、机械台班数量及其价格的，按签证的数量和计日工的价格计算。",{"key":24,"text":512,"correct":22},"现场签证只有用工数量没有人工单价的，其人工单价比照鉴定项目相应工程人工单价计算",{"key":27,"text":514,"correct":22},"现场签证只有材料和机械台班用量没有价格的，其材料和台班价格按照鉴定项目相应工程的材料和台班单价适当上浮计算。",{"key":30,"text":516,"correct":32},"现场签证只有总价而无明细表述的，按总价款计算",{"id":518,"libraryId":5,"type":120,"typeLabel":121,"stem":519,"options":520,"answer":531,"analysis":33},1139010,"根据《建设工程造价鉴定规范》，关于计量争议鉴定的说法，正确的有（）。2019年",[521,523,525,527,529],{"key":20,"text":522,"correct":32},"在鉴定项目图纸完备，当事人对计量依据存在争议，合同专用条款没有明确约定且无国家标准的，鉴定人应以相关工程行业标准或地方标准规定计量",{"key":24,"text":524,"correct":32},"当事人一方对另一方的计量结果提出异议但未提供具体证据的，鉴定人应按原计量结果进行鉴定",{"key":27,"text":526,"correct":32},"当事人一方对另一方的计量结果提出异议又提供具体证据的，鉴定人应复核并依据复核结果进行鉴定",{"key":30,"text":528,"correct":32},"合同当事人签订的总价合同对工程计量有约定的，鉴定人应按约定进行鉴定",{"key":133,"text":530,"correct":22},"当事人签订的总价合同对工程计量没有约定的，鉴定人应对整个工程的工程量进行鉴定","ABCD",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":30,"analysis":33},1139012,"国际工程项目的价格构成比例中，材料部分约占（ ）左右的比重。",[536,538,540,542],{"key":20,"text":537,"correct":22},"10%～20%",{"key":24,"text":539,"correct":22},"20%～30%",{"key":27,"text":541,"correct":22},"30%～40%",{"key":30,"text":543,"correct":32},"30%～50%",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1139013,"国际工程投标过程中的关键环节是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":32},"投标报价",{"key":24,"text":551,"correct":22},"招标研究",{"key":27,"text":553,"correct":22},"工程量核算",{"key":30,"text":555,"correct":22},"现场勘察",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1139014,"在国际工程报价编制过程中，负责人工、材料、设备基础单价的计算，分摊费用的计算，单价分析和标价汇总的是（ ）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"承包商高级管理人员",{"key":24,"text":563,"correct":32},"工程估价人员",{"key":27,"text":565,"correct":22},"计划人员",{"key":30,"text":567,"correct":22},"财务顾问",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},1139015,"某国际工程投标过程中，投标人员在复核工程量时发现土方部分的工程量计算存在较大误差，其应采取的正确做法是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":32},"按招标文件的工程量填报自己的报价，并在投标函中予以说明",{"key":24,"text":575,"correct":22},"按孰有利的原则选择招标文件的工程量或自已核算的工程量报价",{"key":27,"text":577,"correct":22},"按招标文件的工程量和自己核算的工程量分别报价并加以说明",{"key":30,"text":579,"correct":22},"按自已核算的正确的工程量计算报价，并在投标函中予以说明",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":20,"analysis":33},1139016,"（ ）不仅是为了便于准确计算投标价格，更是今后在实施工程中测量每项工程量的依据，同时也是安排施工进度计划、选定施工方案的重要依据。",[584,586,587,589],{"key":20,"text":585,"correct":32},"工程量复核",{"key":24,"text":555,"correct":22},{"key":27,"text":588,"correct":22},"标前会议",{"key":30,"text":590,"correct":22},"各项调查研究",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":20,"analysis":33},1139017,"国际工程投标报价程序中，为了便于准确计算投标报价，并为今后在施工中测量每项工程量提供依据，投标人应当进行的工作是（ ）。",[595,596,597,599],{"key":20,"text":585,"correct":32},{"key":24,"text":424,"correct":22},{"key":27,"text":598,"correct":22},"出席标前会议",{"key":30,"text":600,"correct":22},"对工程项目业主进行调查",{"id":602,"libraryId":5,"type":120,"typeLabel":121,"stem":603,"options":604,"answer":531,"analysis":33},1139018,"国际工程投标报价进行的调查中，属于对竞争对手调查的内容包括（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":32},"规模和实力",{"key":24,"text":608,"correct":32},"技术特长",{"key":27,"text":610,"correct":32},"管理水平",{"key":30,"text":612,"correct":32},"经营状况",{"key":133,"text":614,"correct":22},"经济状况",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":27,"analysis":33},1139019,"(2014真题)关于国际工程投标报价中暂定金额的说法，错误的是()。",[619,621,623,625],{"key":20,"text":620,"correct":22},"暂定金额是业主在招标文件中明确规定了数额的一笔资金",{"key":24,"text":622,"correct":22},"承包商在投标报价时应将暂定金额计入工程总报价",{"key":27,"text":624,"correct":32},"暂定金额等同于暂估价",{"key":30,"text":626,"correct":22},"承包商无权做主使用暂定金额",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":20,"analysis":33},1139021,"国际工程投标中，投标人做出最终报价前应对估算人员算出的暂时标价进行对比分析，其目的是（ ）。",[631,633,635,637],{"key":20,"text":632,"correct":32},"从宏观上把握标价的合理性",{"key":24,"text":634,"correct":22},"分析报价的竞争力",{"key":27,"text":636,"correct":22},"预测报价的利润水平",{"key":30,"text":638,"correct":22},"检查标价计算是否存在错误",[640,643,646,649,652,655],{"id":15,"name":641,"category":7,"favorite":642},"领导干部任职前廉政法规知识测试题",92,{"id":644,"name":645,"category":7,"favorite":15},595,"建筑结构与设备",{"id":647,"name":648,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":650,"name":651,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":653,"name":654,"category":7,"favorite":8},534,"BIM工程师",{"id":656,"name":654,"category":7,"favorite":8},535]