[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":644},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,26,50,2696,[13,38,52,64,76,88,100,115,127,139,151,161,176,188,203,218,230,242,254,268,283,291,303,315,327,339,347,362,374,386,396,408,420,432,444,456,468,480,492,504,516,530,545,557,569,581,593,605,620,632],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1138880,2,"多选题","工程量清单招标时，投标人编制投标报价前应认真复核工程量清单中的分部分项工程量，因为该工程量会影响（ ）。 2016",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","投标总价的计算",false,{"key":24,"text":25,"correct":22},"B","结算工程量的确定",{"key":27,"text":28,"correct":29},"C","施工方法选择",true,{"key":31,"text":32,"correct":29},"D","劳动力和机具安排",{"key":34,"text":35,"correct":29},"E","投标综合单价报价","CDE","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":20,"analysis":37},1138881,1,"单选题","投标过程中，若投标人发现招标工程量清单项目特征描述与施工图纸不符时，应以（ ）为准进行报价。",[44,46,48,50],{"key":20,"text":45,"correct":29},"招标工程量清单的项目特征",{"key":24,"text":47,"correct":22},"招标文件中的施工图纸说明",{"key":27,"text":49,"correct":22},"实际施工的项目特征",{"key":31,"text":51,"correct":22},"投标人按规范修正后的项目特征",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":20,"analysis":37},1138884,"某工程的招标工程量清单中人工挖土方数量为5800m3，投标单位根据己方施工方案确定的挖土工程量为11200m3，人工、材料、机械费用之和为50元\u002Fm3，综合单价确定为80元\u002Fm3，则在如下人工挖土方分项工程的综合单价分析表汇总，“*”位置对应的数量应为（）。2018真题",[56,58,60,62],{"key":20,"text":57,"correct":29},"1.93",{"key":24,"text":59,"correct":22},"1.60",{"key":27,"text":61,"correct":22},"0.63",{"key":31,"text":63,"correct":22},"0.52",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":27,"analysis":37},1138887,"(2014真题)关于单价合同中工程计量的说法，正确的是()。",[68,70,72,74],{"key":20,"text":69,"correct":22},"单价合同应予计量的工程量是承包人实际施工的工程量",{"key":24,"text":71,"correct":22},"承包人因自身原因造成返工的工程量应予计量",{"key":27,"text":73,"correct":29},"工程计量应以设计图纸为依据",{"key":31,"text":75,"correct":22},"承包人为保证工程质量超过图纸要求的工程量应予计量",{"id":77,"libraryId":5,"type":40,"typeLabel":41,"stem":78,"options":79,"answer":24,"analysis":37},1138889,"关于工程量清单招标方式下投标人报价的说法，正确的是（ ）。( 2015真题 )",[80,82,84,86],{"key":20,"text":81,"correct":22},"专业工程暂估价中的专业工程应由投标人自主确定价格并计入报价",{"key":24,"text":83,"correct":29},"暂估价中的材料应按暂估单价计入综合单价",{"key":27,"text":85,"correct":22},"措施项目中的总价项目应包括规费和税金",{"key":31,"text":87,"correct":22},"投标人报价时可以给予一定幅度的总价优惠",{"id":89,"libraryId":5,"type":40,"typeLabel":41,"stem":90,"options":91,"answer":24,"analysis":37},1138890,"对建设规模较小，技术难度较低、施工工期较短，施工图设计已经审查批准的工程，从有利于业主方控制投资的角度，适宜采用的合同类型是（ ）。( 2015真题 )",[92,94,96,98],{"key":20,"text":93,"correct":22},"固定单价合同",{"key":24,"text":95,"correct":29},"固定总价合同",{"key":27,"text":97,"correct":22},"成本加酬金合同",{"key":31,"text":99,"correct":22},"可调单价合同",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":114,"analysis":37},1138891,"关于工程量清单计价下施工企业投标报价原则的说法，正确的有（ ）。( 2015真题 )",[104,106,108,110,112],{"key":20,"text":105,"correct":22},"投标报价由投标人自主确定",{"key":24,"text":107,"correct":29},"投标报价不得低于工程成本",{"key":27,"text":109,"correct":29},"投标人应该以施工方案、技术措施等作为投标报价计算的基本条件",{"key":31,"text":111,"correct":22},"确定投标报价时不需要考虑发承包模式",{"key":34,"text":113,"correct":29},"投标报价要以招标文件中设定的发承包双方责任划分作为基础","BCE",{"id":116,"libraryId":5,"type":40,"typeLabel":41,"stem":117,"options":118,"answer":20,"analysis":37},1138895,"若施工招标文件和中标人投标文件对工程质量标准的定义不一致，则商签施工合同时，工程质量标准约定应以（ ）为准。",[119,121,123,125],{"key":20,"text":120,"correct":29},"中标人投标文件",{"key":24,"text":122,"correct":22},"双方重新协商的结果",{"key":27,"text":124,"correct":22},"招标文件",{"key":31,"text":126,"correct":22},"中标通知书",{"id":128,"libraryId":5,"type":40,"typeLabel":41,"stem":129,"options":130,"answer":31,"analysis":37},1138896,"按照《建设工程工程量清单计价规范》规定，单价合同和总价合同均可以采用工程量清单计价，区别仅在于（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"计价公式不同",{"key":24,"text":134,"correct":22},"计价费用构成不一样",{"key":27,"text":136,"correct":22},"价款最终结算方式不一样",{"key":31,"text":138,"correct":29},"清单中所填写的工程量的合同约束力不同",{"id":140,"libraryId":5,"type":40,"typeLabel":41,"stem":141,"options":142,"answer":20,"analysis":37},1138897,"《计价规范》中规定，对使用工程量清单计价的工程，宜采用（ ）合同。",[143,145,147,149],{"key":20,"text":144,"correct":29},"单价",{"key":24,"text":146,"correct":22},"固定总价",{"key":27,"text":148,"correct":22},"可调总价",{"key":31,"text":150,"correct":22},"成本加酬金",{"id":152,"libraryId":5,"type":40,"typeLabel":41,"stem":153,"options":154,"answer":24,"analysis":37},1138898,"根据《建设工程工程量清单计价规范》（GB50500-2013），实行工程量清单计价的工程，应采用的合同类型是（ ）。",[155,157,159,160],{"key":20,"text":156,"correct":22},"总价合同",{"key":24,"text":158,"correct":29},"单价合同",{"key":27,"text":95,"correct":22},{"key":31,"text":97,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":175,"analysis":37},1138899,"建设工程施工合同根据合同计价方式的不同，一般可以划分为总价合同、单价合同和成本加酬金合同三种类型。具体工程项目可以选择何种合同计价形式，主要依据是（ ）。",[165,167,169,171,173],{"key":20,"text":166,"correct":29},"设计图纸深度",{"key":24,"text":168,"correct":22},"计价方式",{"key":27,"text":170,"correct":29},"工期长短",{"key":31,"text":172,"correct":29},"工程规模",{"key":34,"text":174,"correct":29},"复杂程度","ACDE",{"id":177,"libraryId":5,"type":40,"typeLabel":41,"stem":178,"options":179,"answer":20,"analysis":37},1138901,"下列四种情形中，适宜采用固定总价合同的工程是（ ）。 2016",[180,182,184,186],{"key":20,"text":181,"correct":29},"工期6个月，规模小且施工图设计已审查批准的办公楼工程",{"key":24,"text":183,"correct":22},"采用某种新技术且较复杂，工期5年的海底隧道工程",{"key":27,"text":185,"correct":22},"采用工程量清单计价，只有初步设计图纸，工期2年的地铁站房建设工程",{"key":31,"text":187,"correct":22},"特大暴雨过后的紧急抢险工程",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":202,"analysis":37},1138903,"根据《建设工程价款结算暂行办法》（财建{2004}369号），发承包双方***在施工合同中约定的合同价款事项有（ ）。( 2015真题 )",[192,194,196,198,200],{"key":20,"text":193,"correct":22},"投标保证金的数额、支付方式及时间",{"key":24,"text":195,"correct":29},"工程价款的调整因素 、方法、程序、支付方式及时间",{"key":27,"text":197,"correct":29},"承担计价风险的内容、范围以及超出约定内容、范围的调整方法",{"key":31,"text":199,"correct":29},"工程竣工价款结算编制与核对、支付方式及时间",{"key":34,"text":201,"correct":29},"违约责任以及发生合同价款争议的解决方法及时间","BCDE",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":217,"analysis":37},1138906,"(2014真题)根据《标准施工招标文件》，下列事件中，承包人向发包人既可索赔工期又可索赔费用的有()。",[207,209,211,213,215],{"key":20,"text":208,"correct":22},"发包人原因导致工程缺陷和损失",{"key":24,"text":210,"correct":29},"承包人遇到不利物质条件",{"key":27,"text":212,"correct":22},"发包人要求向承包人提前交付工程设备",{"key":31,"text":214,"correct":29},"施工过程发现文物",{"key":34,"text":216,"correct":22},"承包人遇到异常恶劣的气候条件","BD",{"id":219,"libraryId":5,"type":40,"typeLabel":41,"stem":220,"options":221,"answer":20,"analysis":37},1138909,"根据《建设工程工程量清单计价规范》（GB50500——2013），工程变更引起施工方案改变并使措施项目发生变化时，承包人提出调整措施项目费用的，应事先将（ ）提交发包人确认。( 2015真题 )",[222,224,226,228],{"key":20,"text":223,"correct":29},"拟实施的施工方案",{"key":24,"text":225,"correct":22},"索赔意向通知",{"key":27,"text":227,"correct":22},"拟申请增加的费用明细",{"key":31,"text":229,"correct":22},"工程变更的内容",{"id":231,"libraryId":5,"type":40,"typeLabel":41,"stem":232,"options":233,"answer":31,"analysis":37},1138910,"根据《建设工程量清单计价规范》（GB50500-2013），工程发包时，招标人要求索赔的工期天数超过定额工期（ ）时，应当在招标文件中明示增加赶工费用。( 2015真题 )",[234,236,238,240],{"key":20,"text":235,"correct":22},"5%",{"key":24,"text":237,"correct":22},"10%",{"key":27,"text":239,"correct":22},"15%",{"key":31,"text":241,"correct":29},"20%",{"id":243,"libraryId":5,"type":40,"typeLabel":41,"stem":244,"options":245,"answer":20,"analysis":37},1138911,"根据《建设工程工程量清单计价》（GB50500-2013），已标价工程量清单中没有适用也没有类似于变更工程项目的，变更工程项目单价应由（ ）提出。",[246,248,250,252],{"key":20,"text":247,"correct":29},"承包人",{"key":24,"text":249,"correct":22},"监理人",{"key":27,"text":251,"correct":22},"发包人",{"key":31,"text":253,"correct":22},"设计人",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":114,"analysis":37},1138912,"根据《建设工程工程量清单计价规范》（GB50500-2013）工程变更引起施工方案改变并使措施项目发生变化时，关于措施项目费调整的说法，正确的有（ ）。( 2015真题 )",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"安全文明施工费按实际发生的措施项目，考虑承包人报价浮动因素进行调整",{"key":24,"text":261,"correct":29},"安全文明施工费按实际发生变化的措施项目调整，不得浮动",{"key":27,"text":263,"correct":29},"对单价计算的措施项目，按实际发生变化的措施项目和已标价工程量清单项目确定单价",{"key":31,"text":265,"correct":22},"对总价计算的措施项目费一般不能进行调整",{"key":34,"text":267,"correct":29},"对总价计算的措施项目费，按实际发生变化的措施项目并考虑承包人报价浮动因素进行调整",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},1138913,"施工合同履行过程中，导致工程量清单缺项并应调整合同价款的原因有（ ）。( 2015真题 )",[272,274,276,278,280],{"key":20,"text":273,"correct":29},"设计变更",{"key":24,"text":275,"correct":29},"施工条件改变",{"key":27,"text":277,"correct":22},"承包人投标漏项",{"key":31,"text":279,"correct":29},"工程量清单编制错误",{"key":34,"text":281,"correct":22},"施工技术进步","ABD",{"id":284,"libraryId":5,"type":40,"typeLabel":41,"stem":285,"options":286,"answer":20,"analysis":37},1138914,"（2020年真题）根据《建设工程施工合同(示范文本)》，因设计单位提出设计变更，变更后已标价工程量清单中没有相同及类似变更项目单价的，变更估价申请应由（ ）提出。",[287,288,289,290],{"key":20,"text":247,"correct":29},{"key":24,"text":249,"correct":22},{"key":27,"text":251,"correct":22},{"key":31,"text":253,"correct":22},{"id":292,"libraryId":5,"type":40,"typeLabel":41,"stem":293,"options":294,"answer":27,"analysis":37},1138916,"《计价规范》中给出的工程量清单计价表格包括工程量清单、招标控制价、投标报价、竣工结算等各个阶段计价使用的封面和表样，表样的数量是（ ）种。",[295,297,299,301],{"key":20,"text":296,"correct":22},"18",{"key":24,"text":298,"correct":22},"20",{"key":27,"text":300,"correct":29},"22",{"key":31,"text":302,"correct":22},"25",{"id":304,"libraryId":5,"type":40,"typeLabel":41,"stem":305,"options":306,"answer":24,"analysis":37},1138917,"能够反映构成每一个清单项目综合单价的各个价格要素的价格及主要的“工、料、机”消耗量，可以作为对因工程变更调整综合单价的基础价格数据来源的是（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"单位工程投标控制价汇总表",{"key":24,"text":310,"correct":29},"工程量清单综合单价分析",{"key":27,"text":312,"correct":22},"分部分项工程量清单与计价表",{"key":31,"text":314,"correct":22},"单项工程投标控制价汇总表",{"id":316,"libraryId":5,"type":40,"typeLabel":41,"stem":317,"options":318,"answer":24,"analysis":37},1138918,"在我国工程量清单中，垂直运输机械属于（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"分部分项工程量清单",{"key":24,"text":322,"correct":29},"措施项目清单",{"key":27,"text":324,"correct":22},"其他项目清单",{"key":31,"text":326,"correct":22},"零星工作项目费",{"id":328,"libraryId":5,"type":40,"typeLabel":41,"stem":329,"options":330,"answer":31,"analysis":37},1138919,"(2014真题)采用清单计价的某分部分项工程，招标控制的综合单价为320元，投标报价的综合单价为265元，该工程投标报价下浮率为5%，结算时，该分部分项工程工程量比清单量增加了18%，且合同未确定综合单价调整方法，则综合单价的处理方式是()。",[331,333,335,337],{"key":20,"text":332,"correct":22},"上浮18%",{"key":24,"text":334,"correct":22},"下调5%",{"key":27,"text":336,"correct":22},"调整为292.5元",{"key":31,"text":338,"correct":29},"可不调整",{"id":340,"libraryId":5,"type":40,"typeLabel":41,"stem":341,"options":342,"answer":24,"analysis":37},1138920,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，当合同中没有约定时，对于任一招标工程量清单项目，如果因工程变更等原因导致工程量偏差超过()时，合同单价应进行调整。",[343,344,345,346],{"key":20,"text":241,"correct":22},{"key":24,"text":239,"correct":29},{"key":27,"text":237,"correct":22},{"key":31,"text":235,"correct":22},{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":361,"analysis":37},1138922,"施工过程中，可以作为工程量计量依据的资料有（ ）。 2016",[351,353,355,357,359],{"key":20,"text":352,"correct":29},"质量合格证书",{"key":24,"text":354,"correct":29},"《计量规范》",{"key":27,"text":356,"correct":22},"招标工程量清单",{"key":31,"text":358,"correct":29},"技术规范",{"key":34,"text":360,"correct":29},"设计图纸","ABDE",{"id":363,"libraryId":5,"type":40,"typeLabel":41,"stem":364,"options":365,"answer":27,"analysis":37},1138924,"根据《建设工程工程量清单计价规范》（GB 50500-2013），关于单价合同计量的说法，正确的是（ ）。 2016",[366,368,370,372],{"key":20,"text":367,"correct":22},"承包人为保证施工质量超出施工图纸范围实施的工程量，应该予以计量",{"key":24,"text":369,"correct":22},"承包人收到计量的通知后不派人参加计量，则发包人的计量结果无效",{"key":27,"text":371,"correct":29},"发包人应在计量前24小时通知承包人，无论承包人是否参加，计量结果有效",{"key":31,"text":373,"correct":22},"发包人可以在任何方便的时候计量，计量结果有效",{"id":375,"libraryId":5,"type":40,"typeLabel":41,"stem":376,"options":377,"answer":24,"analysis":37},1138925,"根据《建设工程工程量清单计价规范》（GB 50500-2013），关于施工中工程计量的说法，正确的是（ ）。 2016",[378,380,382,384],{"key":20,"text":379,"correct":22},"发包人应在收到承包人已完工程量报告后14天内核实工程量",{"key":24,"text":381,"correct":29},"单价合同的工程量必须以承包人完成合同工程应予计量的工程量确定",{"key":27,"text":383,"correct":22},"总价合同结算时的工程量必须按实际工程量计量",{"key":31,"text":385,"correct":22},"对质量不合格的工程，承包人承诺返工的工程量给予计量",{"id":387,"libraryId":5,"type":40,"typeLabel":41,"stem":388,"options":389,"answer":24,"analysis":37},1138926,"某灌注桩计量支付条款约定工程量以米计算，若设计长度为20米的灌注桩，承包人做了21米，监理工程师未对施工质量表示异议，则发包人应该按（ ）米支付价款。( 2015真题 )",[390,392,393,395],{"key":20,"text":391,"correct":22},"19",{"key":24,"text":298,"correct":29},{"key":27,"text":394,"correct":22},"21",{"key":31,"text":300,"correct":22},{"id":397,"libraryId":5,"type":40,"typeLabel":41,"stem":398,"options":399,"answer":24,"analysis":37},1138928,"（2020年真题）单价合同在执行过程中,发现招标工程量清单中出现工程量偏差引起工程量增加，则该合同工程量应按（ ）计量。",[400,402,404,406],{"key":20,"text":401,"correct":22},"招标文件中所附的施工图纸的工程量",{"key":24,"text":403,"correct":29},"承包人在履行合同义务中完成的工程量",{"key":27,"text":405,"correct":22},"承包人提交的已完工程量报告中的数量",{"key":31,"text":407,"correct":22},"原招标工程量清单中的工程量",{"id":409,"libraryId":5,"type":40,"typeLabel":41,"stem":410,"options":411,"answer":27,"analysis":37},1138929,"某工程采用工程量清单招标，评标时发现甲投标人的分部分项工程量清单计价表中，有一项未填报综合单价与合价，则视为（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"投标人漏项，招标人应要求甲投标人予以补充",{"key":24,"text":415,"correct":22},"此分部分项工程在施工中不需要做",{"key":27,"text":417,"correct":29},"此项费用已包含在工程量清单的其他单价和合价中",{"key":31,"text":419,"correct":22},"甲投标人的投标为废标",{"id":421,"libraryId":5,"type":40,"typeLabel":41,"stem":422,"options":423,"answer":31,"analysis":37},1138930,"投标单位的投标报价应按招标单位提供的工程量清单的每一单项计算填写单价、合价，在开标后发现投标单位没有填写单价、合价的项目，则（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"允许投标单位补充填写",{"key":24,"text":427,"correct":22},"视为废标",{"key":27,"text":429,"correct":22},"由招标人退回投标书",{"key":31,"text":431,"correct":29},"认为此费用已包括在工程量清单的其他单价或合价中",{"id":433,"libraryId":5,"type":40,"typeLabel":41,"stem":434,"options":435,"answer":20,"analysis":37},1138931,"某采用工程量清单招标的工程，评标委员会发现某标书漏填了分部分项工程类清单中“地面找平”一项的综合单价和合价，则评标委员会的正确处理方式是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":29},"视为该项费用已包含在工程量清单的其他单价和合价中",{"key":24,"text":439,"correct":22},"认定该标书为废标",{"key":27,"text":441,"correct":22},"要求投标人就此项进行单独报价，补充到原报价书中",{"key":31,"text":443,"correct":22},"由评标委员会认定一个合理价格补充到原报价书中",{"id":445,"libraryId":5,"type":40,"typeLabel":41,"stem":446,"options":447,"answer":27,"analysis":37},1138932,"工程量清单计划格式中的任何内容不得随意删除或涂改，投标人应填报工程量清单计价格中列明的所有需要填报的单价和合价，如未填报的单价和合价，则（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"招标人应要求投标人及时补充",{"key":24,"text":451,"correct":22},"投标人可以在中标后提出索赔",{"key":27,"text":453,"correct":29},"招标人可认为此项费用包含在工程量清单的其他单价和合价中",{"key":31,"text":455,"correct":22},"投标人应该在开标之前补充",{"id":457,"libraryId":5,"type":40,"typeLabel":41,"stem":458,"options":459,"answer":31,"analysis":37},1138933,"根据《建设工程工程量清单计价规范》（GB 50500 - 2013》，招标人委托工程造价咨询人编制的招标工程量清单，其封面应有招标人和（ ）盖章确认。",[460,462,464,466],{"key":20,"text":461,"correct":22},"编制清单的造价员",{"key":24,"text":463,"correct":22},"造价咨询人的造价工程师",{"key":27,"text":465,"correct":22},"工程造价咨询人的法人代表",{"key":31,"text":467,"correct":29},"工程造价咨询人",{"id":469,"libraryId":5,"type":40,"typeLabel":41,"stem":470,"options":471,"answer":27,"analysis":37},1138934,"根据《建设工程工程量清单计价规范》，造价员编制的工程量清单应（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":22},"由其本人签字盖章",{"key":24,"text":475,"correct":22},"由所在单位法人盖章",{"key":27,"text":477,"correct":29},"由造价工程师审核并签字盖章",{"key":31,"text":479,"correct":22},"由发包人盖章",{"id":481,"libraryId":5,"type":40,"typeLabel":41,"stem":482,"options":483,"answer":24,"analysis":37},1138935,"某独立土方工程，招标文件中估计工程量为80万m3。合同中规定，土方工程单价为10元\u002Fm3，当实际完成工程量超过估计工程量10%时，调整单价，单价调为8元\u002Fm3。工程结束时实际完成土方工程量为100万m3，则该土方工程款为（ ）万元。",[484,486,488,490],{"key":20,"text":485,"correct":22},"816",{"key":24,"text":487,"correct":29},"976",{"key":27,"text":489,"correct":22},"1 000",{"key":31,"text":491,"correct":22},"800",{"id":493,"libraryId":5,"type":40,"typeLabel":41,"stem":494,"options":495,"answer":24,"analysis":37},1138936,"根据《建设工程工程量清单计价规范》（GB50500-2013），因不可抗力事件导致的损害及其费用增加，应由承包人承担的是（ ）。",[496,498,500,502],{"key":20,"text":497,"correct":22},"工程本身的损害",{"key":24,"text":499,"correct":29},"承包人的施工机械损坏",{"key":27,"text":501,"correct":22},"发包方现场的人员伤亡",{"key":31,"text":503,"correct":22},"工程所需的修复费用",{"id":505,"libraryId":5,"type":40,"typeLabel":41,"stem":506,"options":507,"answer":31,"analysis":37},1138937,"招标工程以投标截止日前28天，非招标工程以合同签订前28天前为基准日，其后国家的法律、法规、规章和政策发生变化影响工程造价的，应按省级或行业建设主管部门或其授权的工程造价管理机构发布的规定调整（ ）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"招标控制价",{"key":24,"text":511,"correct":22},"投标报价",{"key":27,"text":513,"correct":22},"综合单价",{"key":31,"text":515,"correct":29},"合同价款",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":217,"analysis":37},1138938,"因不可抗力事件导致的费用，发、承包双方应分别承担并调整工程价款，其原则包括（ ）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"因工程本身损害导致第三方人员伤亡和财产损失",{"key":24,"text":523,"correct":29},"发包人、承包人人员伤亡由其所在单位负责，并承担相应费用",{"key":27,"text":525,"correct":22},"承包人的施工机械设备损坏及停工损失，由发包人承担",{"key":31,"text":527,"correct":29},"停工期间承包人应发包人要求留在施工场地的必要的管理人员的费用，由发包人承担",{"key":34,"text":529,"correct":22},"工程所需清理、修复费用，由承包人承担",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":544,"analysis":37},1138939,"根据《建设工程施工合同（示范文本）》（GF-99-0201），关于工程变更程序的说法，正确的有（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"发包人若需对原工程设计进行变更，应提前7天书面通知承包人",{"key":24,"text":537,"correct":29},"工程变更超过原设计标准或批准的建设规模时，发包人应该重新报批",{"key":27,"text":539,"correct":22},"对于发包人的变更通知，承包人有权拒绝执行",{"key":31,"text":541,"correct":29},"承包人在施工中提出的合理化建议涉及设计图纸更改的，须经工程师同意",{"key":34,"text":543,"correct":29},"未经工程师同意，承包人擅自变更工程的，承包人应承担由此发生的相应费用","BDE",{"id":546,"libraryId":5,"type":40,"typeLabel":41,"stem":547,"options":548,"answer":20,"analysis":37},1138940,"某独立土方工程，根据《建设工程工程量清单佳佳规范》（GB50500—2013），签订了固定单价合同，招标工程量为3000m3，承包人标书中土方工程报价为55元m3。合同约定：当实际工程量超过估计工程量15%时，超过部分工程量单价调整为50元\u002Fm3。工程结束时实际完成并经监理确认的土方工程为4500 m3 ，则土方工程总价为（ ）元。",[549,551,553,555],{"key":20,"text":550,"correct":29},"242250",{"key":24,"text":552,"correct":22},"240000",{"key":27,"text":554,"correct":22},"247500",{"key":31,"text":556,"correct":22},"225000",{"id":558,"libraryId":5,"type":40,"typeLabel":41,"stem":559,"options":560,"answer":24,"analysis":37},1138943,"根据《建设工程工程量清单计价规范》（GB50500-2013），在合同履行期间，由于招标工程量清单缺项，新增了分部分项工程量清单项目，关于其合同价款确定的说法，正确的是（ ）。 2016",[561,563,565,567],{"key":20,"text":562,"correct":22},"新增清单项目的综合单价应由监理工程师提出",{"key":24,"text":564,"correct":29},"新增清单项目导致新增措施项目的，承包人应将新增措施项目实施方案提交发包人批准",{"key":27,"text":566,"correct":22},"新增清单项目的综合单价应由承包人提出，但相关措施项目费不能再做调整",{"key":31,"text":568,"correct":22},"新样清单项目应按额外工作处理，承包人可选择做或者不做",{"id":570,"libraryId":5,"type":40,"typeLabel":41,"stem":571,"options":572,"answer":20,"analysis":37},1138944,"根据《建设工程工程量清单计价规范》（GB 50500-2013），关于合同工期的说法正确的是（ ）。 2016",[573,575,577,579],{"key":20,"text":574,"correct":29},"发包人要求合同工程提前竣工的，应承担承包人由此增加的提前竣工费用",{"key":24,"text":576,"correct":22},"招标人压缩的工期天数不得超过定额工期的30%",{"key":27,"text":578,"correct":22},"招标人压缩的工期天数超过定额工期的20%但不超过30%时，不额外支付赶工费用",{"key":31,"text":580,"correct":22},"工程实施过程中，发包人要求合同工程提前竣工的，承包人必须采取加快工程进度的措施",{"id":582,"libraryId":5,"type":40,"typeLabel":41,"stem":583,"options":584,"answer":27,"analysis":37},1138946,"根据《建设工程工程量清单计价规范》（GB50500-2013），采用清单计价的某分部分项工程，招标控制价的综合单价为350元，承包人投标报价的综合单价为300元。该工程投标报价总的下浮率为5%。结算时，该分部分项工程工程量比清单工程量增加了16%，且合同未确定综合单价调整方法，则对该综合单价的正确处理方式是（ ）。 2016",[585,587,589,591],{"key":20,"text":586,"correct":22},"调整为257元",{"key":24,"text":588,"correct":22},"调整为282.63元",{"key":27,"text":590,"correct":29},"不做任何调整",{"key":31,"text":592,"correct":22},"调整为345元",{"id":594,"libraryId":5,"type":40,"typeLabel":41,"stem":595,"options":596,"answer":31,"analysis":37},1138948,"根据《建设工程工程量计价规范》（GB50500－2013），由于承包人原因未在约定的工期内竣工的，则对原约定竣工日期后继续施工的工程，在使用价格调整公式进行价格调整时，应使用的现行价格指数是（ ）。 2016",[597,599,601,603],{"key":20,"text":598,"correct":22},"原约定竣工日期的价格指数",{"key":24,"text":600,"correct":22},"实际竣工日期的价格指数",{"key":27,"text":602,"correct":22},"原约定竣工日期与实际竣工日期的两个价格指数中较高者",{"key":31,"text":604,"correct":29},"原约定竣工日期与实际竣工日期的两个价格指数中较低者",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":619,"analysis":37},1138950,"关于《建设工程施工合同（示范文本）》条件下工程变更的说法，正确的是（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"承包人对发包人的变更通知有权拒绝",{"key":24,"text":612,"correct":22},"施工中承包人经工程师同意，可以为了施工方便对原工程设计进行变更",{"key":27,"text":614,"correct":29},"未经工程师同意承包人擅自更改设计，承包人应该承担由此发生的费用",{"key":31,"text":616,"correct":29},"承发包双方对工期要求的变化，应当由一方提出，双方协商一致后，进行变更",{"key":34,"text":618,"correct":22},"因承包人自身原因导致的工程变更，经工程师确认，承包人可以要求追加合同价款","CD",{"id":621,"libraryId":5,"type":40,"typeLabel":41,"stem":622,"options":623,"answer":20,"analysis":37},1138951,"某工程随工合同约定根据价格调整公式调整合同价，已知不调值部分占合同价的比例为15%，可参与调值部分的费用类型、占合同总价的比例和相关价格指数见下表，若结算当月完成的合同额为1000万元，则调整后的合同金额为（）。2018真题",[624,626,628,630],{"key":20,"text":625,"correct":29},"1050",{"key":24,"text":627,"correct":22},"1034",{"key":27,"text":629,"correct":22},"1017",{"key":31,"text":631,"correct":22},"1000",{"id":633,"libraryId":5,"type":40,"typeLabel":41,"stem":634,"options":635,"answer":20,"analysis":37},1138952,"根据《建设工程工程量清单计价规范》（GB50500—2013），施工过程中发生的计日工，应按照（ ）计价。( 2015真题 )",[636,638,640,642],{"key":20,"text":637,"correct":29},"已标价工程量清单中的计日工单价",{"key":24,"text":639,"correct":22},"计日工发生时承包人提出的综合单价",{"key":27,"text":641,"correct":22},"计日工发生当月市场人工工资单价",{"key":31,"text":643,"correct":22},"计日工发生当月造价管理部门发布的人工指导价",[645,648,651,654,657,660],{"id":40,"name":646,"category":7,"favorite":647},"领导干部任职前廉政法规知识测试题",92,{"id":649,"name":650,"category":7,"favorite":40},595,"建筑结构与设备",{"id":652,"name":653,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":655,"name":656,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":658,"name":659,"category":7,"favorite":8},534,"BIM工程师",{"id":661,"name":659,"category":7,"favorite":8},535]