[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,25,50,2696,[13,38,52,64,76,88,100,112,125,137,149,160,172,184,195,203,215,226,238,250,262,273,282,294,307,319,331,343,355,367,382,397,410,420,432,444,459,468,478,489,501,513,522,534,542,554,565,577,591,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1138814,2,"多选题","按《建设工程工程量清单计价规范》规定，工程量清单采用的全费用综合单价，包括（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","人工费",true,{"key":24,"text":25,"correct":22},"B","措施项目费",{"key":27,"text":28,"correct":22},"C","机械使用费",{"key":30,"text":31,"correct":22},"D","管理费",{"key":33,"text":34,"correct":35},"E","意外费",false,"ABCD","",{"id":39,"libraryId":5,"type":40,"typeLabel":41,"stem":42,"options":43,"answer":24,"analysis":37},1138815,1,"单选题","按工程量清单计价，建筑安装工程造价的组成包括（ ）。",[44,46,48,50],{"key":20,"text":45,"correct":35},"分部分项工程费、措施项目费、其他项目费",{"key":24,"text":47,"correct":22},"分部分项工程费、措施项目费、其他项目费、规费和税金",{"key":27,"text":49,"correct":35},"分部分项工程费、措施项目费、其他项目费、企业管理费、利润",{"key":30,"text":51,"correct":35},"分部分项工程费、措施项目费、总承包服务费、营业税",{"id":53,"libraryId":5,"type":40,"typeLabel":41,"stem":54,"options":55,"answer":27,"analysis":37},1138816,"按照《建设工程工程量清单计价规范》（GB 50500--2008）规定，在清单计价中测算人、材、 机消耗量时，编制投标报价时一般采用（ ）。",[56,58,60,62],{"key":20,"text":57,"correct":35},"政府颁发的消耗量定额",{"key":24,"text":59,"correct":35},"根据市场询价的情况",{"key":27,"text":61,"correct":22},"反映企业水平的企业定额",{"key":30,"text":63,"correct":35},"地区定额",{"id":65,"libraryId":5,"type":40,"typeLabel":41,"stem":66,"options":67,"answer":27,"analysis":37},1138817,"根据《建设工程工程量清单计价规范》，利用综合单价法计算分部分项工程费需要解决的核心问题是（ ）。",[68,70,72,74],{"key":20,"text":69,"correct":35},"计价公式的选择",{"key":24,"text":71,"correct":35},"单项工程单价的确定",{"key":27,"text":73,"correct":22},"确定各分部分项工程量及其综合单价",{"key":30,"text":75,"correct":35},"工料单价的确定",{"id":77,"libraryId":5,"type":40,"typeLabel":41,"stem":78,"options":79,"answer":24,"analysis":37},1138818,"其他项目清单中的暂列金额和暂估价由（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":35},"投标人可以根据企业自身特点作适当的变更",{"key":24,"text":83,"correct":22},"招标人按估算金额确定",{"key":27,"text":85,"correct":35},"承包人根据招标人提出的要求，按估算的费用确定",{"key":30,"text":87,"correct":35},"招标人按国家或行业建设主管部门规定标准计算确定",{"id":89,"libraryId":5,"type":40,"typeLabel":41,"stem":90,"options":91,"answer":24,"analysis":37},1138819,"根据《建设工程工程量清单计价规范》（GB50500-2013），采用工程量清单招标的工程，投标人在投标报价时不得作为竞争性费用的是（ ）。",[92,94,96,98],{"key":20,"text":93,"correct":35},"工程定位复测费",{"key":24,"text":95,"correct":22},"税金",{"key":27,"text":97,"correct":35},"冬雨季施工增加费",{"key":30,"text":99,"correct":35},"总承包服务费",{"id":101,"libraryId":5,"type":40,"typeLabel":41,"stem":102,"options":103,"answer":30,"analysis":37},1138820,"工程量清单计价模式下，分部分项工程量的确定方法是（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":35},"按施工图图示尺寸加允许误差计算工程量",{"key":24,"text":107,"correct":35},"按施工方案计算工程总量",{"key":27,"text":109,"correct":35},"按施工方案加允许误差计算工程量",{"key":30,"text":111,"correct":22},"按施工图图示尺寸计算工程净量",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":124,"analysis":37},1138821,"根据《建设工程工程量清单计价规范》（GB 50500-2008），分部分项工程综合单价包括完成规定计量单位清单项目所需的人工费、材料费、机械使用费以及（ ）。",[116,117,119,121,122],{"key":20,"text":31,"correct":22},{"key":24,"text":118,"correct":22},"利润",{"key":27,"text":120,"correct":35},"规费",{"key":30,"text":95,"correct":35},{"key":33,"text":123,"correct":22},"一定范围内的风险费","ABE",{"id":126,"libraryId":5,"type":40,"typeLabel":41,"stem":127,"options":128,"answer":24,"analysis":37},1138822,"按《建设工程工程量清单计价规范》规定，工程量清单计价应采用（ ） 。",[129,131,133,135],{"key":20,"text":130,"correct":35},"工料单价法",{"key":24,"text":132,"correct":22},"综合单价法",{"key":27,"text":134,"correct":35},"扩大单价法",{"key":30,"text":136,"correct":35},"预算单价法",{"id":138,"libraryId":5,"type":40,"typeLabel":41,"stem":139,"options":140,"answer":30,"analysis":37},1138823,"某建筑安装工程，分部分项工程量清单计价1770万元，措施项目清单计价51.34万元，其他项目清单计价100万元，规费80万元，税金68.25万元，则其单位工程报价为（ ）万元。",[141,143,145,147],{"key":20,"text":142,"correct":35},"1821.34",{"key":24,"text":144,"correct":35},"1921.34",{"key":27,"text":146,"correct":35},"2001.34",{"key":30,"text":148,"correct":22},"2069.59",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":159,"analysis":37},1138824,"按《建设工程工程量清单计价规范》规定，分部分项工程量清单采用综合单价计价，包括（ ）。",[153,154,155,157,158],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":35},{"key":27,"text":156,"correct":22},"施工机械使用费",{"key":30,"text":31,"correct":22},{"key":33,"text":120,"correct":35},"ACD",{"id":161,"libraryId":5,"type":40,"typeLabel":41,"stem":162,"options":163,"answer":24,"analysis":37},1138825,"计算措施项目综合单价的方法不包括（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":35},"实物量法",{"key":24,"text":167,"correct":22},"总包法",{"key":27,"text":169,"correct":35},"分包法",{"key":30,"text":171,"correct":35},"参数法",{"id":173,"libraryId":5,"type":40,"typeLabel":41,"stem":174,"options":175,"answer":27,"analysis":37},1138826,"某采用工程量清单计价的招标工程，工程量清单中挖土方的工程量为2600立方米，投标人甲根据其施工方案估算的挖土方工程量为4400立方米，直接工程费为76000元，管理费为18000元，利润为8000元，不考虑其他因素，则投标人甲填报的综合单价应为（ ）元\u002F立方米。",[176,178,180,182],{"key":20,"text":177,"correct":35},"36.15",{"key":24,"text":179,"correct":35},"29.23",{"key":27,"text":181,"correct":22},"39.23",{"key":30,"text":183,"correct":35},"23.18",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":124,"analysis":37},1138827,"根据《建设工程工程量清单计价规范》的规定，分部分项工程量清单的综合单价中，不包括（ ）。",[188,190,191,193,194],{"key":20,"text":189,"correct":22},"措施费",{"key":24,"text":120,"correct":22},{"key":27,"text":192,"correct":35},"企业管理费",{"key":30,"text":118,"correct":35},{"key":33,"text":95,"correct":22},{"id":196,"libraryId":5,"type":40,"typeLabel":41,"stem":197,"options":198,"answer":24,"analysis":37},1138828,"根据《建设工程工程量清单计价规范》（GB 50500—2008）编制施工图预算时，“分项工程量×相应单价”计算得到的价款中已经包含（ ）。",[199,200,201,202],{"key":20,"text":189,"correct":35},{"key":24,"text":31,"correct":22},{"key":27,"text":95,"correct":35},{"key":30,"text":120,"correct":35},{"id":204,"libraryId":5,"type":40,"typeLabel":41,"stem":205,"options":206,"answer":24,"analysis":37},1138829,"工程量清单计价应包括按招标文件规定，完成工程量清单所列项目的（ ）费用。",[207,209,211,213],{"key":20,"text":208,"correct":35},"主要",{"key":24,"text":210,"correct":22},"全部",{"key":27,"text":212,"correct":35},"一大部分",{"key":30,"text":214,"correct":35},"一小部分",{"id":216,"libraryId":5,"type":40,"typeLabel":41,"stem":217,"options":218,"answer":24,"analysis":37},1138830,"按照《建设工程工程量清单计价规范》(GB 50500--2008)规定，其他项目清单中的暂列金额和暂估价（ ）。",[219,220,222,224],{"key":20,"text":81,"correct":35},{"key":24,"text":221,"correct":22},"由招标人按估算金额确定",{"key":27,"text":223,"correct":35},"由承包人根据招标人提出的要求，按估算的费用确定",{"key":30,"text":225,"correct":35},"由招标人按国家或行业建设主管部门规定标准计算确定",{"id":227,"libraryId":5,"type":40,"typeLabel":41,"stem":228,"options":229,"answer":27,"analysis":37},1138831,"(2014真题)投标人经复核，认为招标人公布的招标控制价未按照《建设工程工程量清单计价规范》GB50500-2013的规定进行编制的，应在招标控制价公布后()d内向招投标监督机构和工程造价管理机构投诉。",[230,232,234,236],{"key":20,"text":231,"correct":35},"10",{"key":24,"text":233,"correct":35},"7",{"key":27,"text":235,"correct":22},"5",{"key":30,"text":237,"correct":35},"3",{"id":239,"libraryId":5,"type":40,"typeLabel":41,"stem":240,"options":241,"answer":30,"analysis":37},1138832,"某土方工程，招标工程质量清单中挖土方工程数量为3000㎡。投标人依据地质资料和施工方案计算的实际挖土方量为3600㎡，挖土方的人、料、机费为65000元；人工运土的人、料、机费用为25000元，机械运土的人、料、机费用58000元。企业管理费取人、料、机总费用的14%，利润率取人、料、机总费用与管理费和的8%，不考虑其他因素，则投标人挖土方的投标综合单价为（ ）元。",[242,244,246,248],{"key":20,"text":243,"correct":35},"60.19",{"key":24,"text":245,"correct":35},"50.62",{"key":27,"text":247,"correct":35},"50.16",{"key":30,"text":249,"correct":22},"60.74",{"id":251,"libraryId":5,"type":40,"typeLabel":41,"stem":252,"options":253,"answer":20,"analysis":37},1138833,"根据《建设工程工程量清单计价规范》（GB 50500—2013），施工企业综合单价的计算有以下工作，①确定组合定额子目并计算各子目工程量；②确定人、料、机单价；③测算人、料、机的数量；④计算清单项目的综合单价；⑤计算清单项目的管理费和利润；⑥计算清单项目的人、料、机总费用，正确的步骤是（ ）。 2016",[254,256,258,260],{"key":20,"text":255,"correct":22},"①-③-②-⑥-⑤-④",{"key":24,"text":257,"correct":35},"②-③-①-⑤-⑥-④",{"key":27,"text":259,"correct":35},"③-①-②-⑥-⑤-④",{"key":30,"text":261,"correct":35},"①-③-②-④-⑥-⑤",{"id":263,"libraryId":5,"type":40,"typeLabel":41,"stem":264,"options":265,"answer":20,"analysis":37},1138836,"根据《建设工程量清单计价规范》（GB50500--2013），适宜采用综合单价法计价的措施项目费是（ ）。 2016",[266,268,270,271],{"key":20,"text":267,"correct":22},"脚手架工程费",{"key":24,"text":269,"correct":35},"夜间施工增加费",{"key":27,"text":97,"correct":35},{"key":30,"text":272,"correct":35},"二次搬运费",{"id":274,"libraryId":5,"type":40,"typeLabel":41,"stem":275,"options":276,"answer":30,"analysis":37},1138842,"根据《建设工程工程量清单计价规范》（GB505000-2013），建设工程投标报价中，不得作为竞争性费用的是（ ）。( 2015真题 )",[277,278,279,281],{"key":20,"text":99,"correct":35},{"key":24,"text":269,"correct":35},{"key":27,"text":280,"correct":35},"分部分项工程费",{"key":30,"text":120,"correct":22},{"id":283,"libraryId":5,"type":40,"typeLabel":41,"stem":284,"options":285,"answer":24,"analysis":37},1138843,"某工程项目土方工程采用人工挖土方、人工运输和机械运输，招标工程量清单中挖土方数量为2000m3，投标人计算的施工挖土方数量为3800m3，取土外运，投标人计算的人工挖土费用为42000元、人工运土费用为15000元、机械运土费用38000、管理费用人、料、机之和的14%，利润取人、料、机与管理费之和的8%，根据《建设工程量清单计价规范》（GB50500-2013），不考虑其他因素，投标人报价的挖土方综合单价为（ ）元\u002Fm3。( 2015真题 )",[286,288,290,292],{"key":20,"text":287,"correct":35},"33.41",{"key":24,"text":289,"correct":22},"58.48",{"key":27,"text":291,"correct":35},"61.56",{"key":30,"text":293,"correct":35},"73.10",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":159,"analysis":37},1138844,"适宜用参数法计价的措施项目费有（ ）。( 2015真题 )",[298,299,301,303,305],{"key":20,"text":272,"correct":22},{"key":24,"text":300,"correct":35},"混凝土模板费",{"key":27,"text":302,"correct":22},"安全文明施工费",{"key":30,"text":304,"correct":22},"已完工程及设备保护费",{"key":33,"text":306,"correct":35},"垂直运输费",{"id":308,"libraryId":5,"type":40,"typeLabel":41,"stem":309,"options":310,"answer":24,"analysis":37},1138847,"（2019年真题）根据《建设工程工程量清单计价规范》，某招标工程量清单中挖沟槽土方的工程量为2600m3，投标人在考虑工作面和放坡后，预计开挖土方量为5090m3，运输土方量为1925m3，人料机及管理费、利润合价为118200元。不考虑其他因素，则该分项工程的工程量清单综合单价为()元\u002Fm3。",[311,313,315,317],{"key":20,"text":312,"correct":35},"16.85",{"key":24,"text":314,"correct":22},"45.46",{"key":27,"text":316,"correct":35},"23.22",{"key":30,"text":318,"correct":35},"61.40",{"id":320,"libraryId":5,"type":40,"typeLabel":41,"stem":321,"options":322,"answer":27,"analysis":37},1138849,"建设工程项目招标控制价的编制主体是（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":35},"项目监理机构",{"key":24,"text":326,"correct":35},"项目建设主管部门",{"key":27,"text":328,"correct":22},"招标人或受其委托的工程造价咨询人",{"key":30,"text":330,"correct":35},"工程所在地政府造价管理机构",{"id":332,"libraryId":5,"type":40,"typeLabel":41,"stem":333,"options":334,"answer":20,"analysis":37},1138850,"国有资金投资的工程建设项目实行工程量清单招标，并应编制（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"招标控制价",{"key":24,"text":338,"correct":35},"工程量清单说明",{"key":27,"text":340,"correct":35},"最低交易价",{"key":30,"text":342,"correct":35},"招标文件说明",{"id":344,"libraryId":5,"type":40,"typeLabel":41,"stem":345,"options":346,"answer":30,"analysis":37},1138851,"招标方提供的工程量清单中，投标人可以根据拟建项目的施工方案进行调整的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":35},"规费清单",{"key":24,"text":350,"correct":35},"税金清单",{"key":27,"text":352,"correct":35},"分部分项工程量清单",{"key":30,"text":354,"correct":22},"措施项目清单",{"id":356,"libraryId":5,"type":40,"typeLabel":41,"stem":357,"options":358,"answer":24,"analysis":37},1138852,"按照《建设工程工程量清单计价规范》规定，一般情况下，编制招标控制价采用的材料价格应是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":35},"按照招标人的要求确定的价格",{"key":24,"text":362,"correct":22},"工程造价管理机构通过工程造价信息发布的材料单价",{"key":27,"text":364,"correct":35},"完全按照市场价格水平确定",{"key":30,"text":366,"correct":35},"以市场价格为基础，在参考未来市场价格波动因素来确定",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":381,"analysis":37},1138853,"关于招标控制价中“暂列金额”的说法，正确的有（ ）。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"设计图纸详细深入的工程，可适当降低暂列金额",{"key":24,"text":374,"correct":22},"复杂工程的暂列金额可适当提高",{"key":27,"text":376,"correct":35},"暂列金额由材料暂估价和专业工程暂估价两部分组成",{"key":30,"text":378,"correct":22},"暂列金额的估算要考虑工程环境条件",{"key":33,"text":380,"correct":35},"暂列金额应根据拟采用的施工方案估算","ABD",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":396,"analysis":37},1138854,"根据《建设工程工程量清单计价规范》（GB50500-2008），关于政府投资项目招标控制价的说法，正确的有（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":22},"招标控制价是对招标工程限定的最高限价",{"key":24,"text":389,"correct":22},"招标控制价超过批准的概算时，招标人应将其报原概算审批部门审核",{"key":27,"text":391,"correct":22},"投标人的投标报价高于招标控制价的，其投标应予以拒绝",{"key":30,"text":393,"correct":35},"招标控制价可以在公布后上调或下浮",{"key":33,"text":395,"correct":35},"招标控制价的作用与标底完全相同","ABC",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":124,"analysis":37},1138855,"73.根据《建设工程工程量清单计价规范》（GB 50500-2013），关于招标控制价的说法，正确的有（ ）。",[401,403,404,406,408],{"key":20,"text":402,"correct":22},"招标控制价是对招标工程项目规定的最高工程造价",{"key":24,"text":389,"correct":22},{"key":27,"text":405,"correct":35},"国有或非国有资金投资的建设工程招标，招标人必须编制招标控制价",{"key":30,"text":407,"correct":35},"招标控制价应在招标文件中公布，在招标过程中不应上调，但可适当下浮",{"key":33,"text":409,"correct":22},"投标人的投标报价高于招标控制价时，其投标应按废标处理",{"id":411,"libraryId":5,"type":40,"typeLabel":41,"stem":412,"options":413,"answer":24,"analysis":37},1138856,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，投标企业可以根据拟建工程的具体施工方案进行列项的清单是()。",[414,415,416,418],{"key":20,"text":352,"correct":35},{"key":24,"text":354,"correct":22},{"key":27,"text":417,"correct":35},"其他项目清单",{"key":30,"text":419,"correct":35},"规费项目清单",{"id":421,"libraryId":5,"type":40,"typeLabel":41,"stem":422,"options":423,"answer":27,"analysis":37},1138857,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，关于投标报价的说法，错误的是()。",[424,426,428,430],{"key":20,"text":425,"correct":35},"暂列金额应按照招标工程量清单中列出的金额填写，不得变动",{"key":24,"text":427,"correct":35},"专业工程暂估价必须按照招标工程量清单中列出的金额填写",{"key":27,"text":429,"correct":22},"计日工应按照招标文件中的数量和单价计算总费用",{"key":30,"text":431,"correct":35},"总承包服务费应按照招标人的要求和现场管理需要自主确定",{"id":433,"libraryId":5,"type":40,"typeLabel":41,"stem":434,"options":435,"answer":30,"analysis":37},1138858,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，关于工程量清单编制的说法，正确的是()。",[436,438,440,442],{"key":20,"text":437,"correct":35},"综合单价包括应由招标人承担的全部风险费用",{"key":24,"text":439,"correct":35},"招标文件提供了暂估单价的材料，其材料费用应计入其他项目清单费",{"key":27,"text":441,"correct":35},"措施项目费包括规费、税金等在内",{"key":30,"text":443,"correct":22},"规费和税金必须按有关部门的规定计算，不得作为竞争性费用",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":458,"analysis":37},1138861,"根据《建设工程工程量清单计价规范》（GB50500--2013），关于招标控制价的说法，正确的有（ ）。 2016",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"国有资金投资的建设工程招标，必须编制招标控制价",{"key":24,"text":451,"correct":22},"国有资金投资的建设工程招标，招标控制价应控制在已批准的投资概算内",{"key":27,"text":453,"correct":35},"招标控制价只能由具有编制能力的招标人自行编制",{"key":30,"text":455,"correct":22},"招标控制价应在招标文中公布，不得变动",{"key":33,"text":457,"correct":22},"投标人的投标报价若高于招标控价，其投标应被拒绝","ABDE",{"id":460,"libraryId":5,"type":40,"typeLabel":41,"stem":461,"options":462,"answer":24,"analysis":37},1138865,"根据《建设工程工程量清单计价规范》（GB50500—2008），投标时可由投标企业根据其施工组织设计自主报价的是（ ）。",[463,464,466,467],{"key":20,"text":302,"correct":35},{"key":24,"text":465,"correct":22},"大型机械设备进出场及安拆费",{"key":27,"text":120,"correct":35},{"key":30,"text":95,"correct":35},{"id":469,"libraryId":5,"type":40,"typeLabel":41,"stem":470,"options":471,"answer":24,"analysis":37},1138866,"实行工程量清单招标，投标人的投标总价应当与组成工程量清单的分部分项工程费、措施项目费、其他项目费和规费、税金的合计的金额一致，投标人对投标报价的任何优惠（或降价、让利）均应反映在相应清单的（ ）中。",[472,473,475,477],{"key":20,"text":120,"correct":35},{"key":24,"text":474,"correct":22},"综合单价",{"key":27,"text":476,"correct":35},"其他项目费",{"key":30,"text":189,"correct":35},{"id":479,"libraryId":5,"type":40,"typeLabel":41,"stem":480,"options":481,"answer":30,"analysis":37},1138867,"招标人编制招标控制价与投标人报价的共同基础是（ ）。",[482,484,485,487],{"key":20,"text":483,"correct":35},"工料单价",{"key":24,"text":474,"correct":35},{"key":27,"text":486,"correct":35},"按拟采用施工方案计算额工程量",{"key":30,"text":488,"correct":22},"工程量清单标明的工程量",{"id":490,"libraryId":5,"type":40,"typeLabel":41,"stem":491,"options":492,"answer":27,"analysis":37},1138868,"根据《建设工程工程量清单计价规范》（GB50500-2008），编制投标文件时，招标文件中已提供暂估价的材料价格应根据（ ）填报。",[493,495,497,499],{"key":20,"text":494,"correct":35},"投标人自主确定价格",{"key":24,"text":496,"correct":35},"投标时当地的市场价格",{"key":27,"text":498,"correct":22},"招标文件提供的价格",{"key":30,"text":500,"correct":35},"政府主管部门公布的价格",{"id":502,"libraryId":5,"type":40,"typeLabel":41,"stem":503,"options":504,"answer":30,"analysis":37},1138869,"在招投标过程中，若招标文件某分部分项工程量清单项目特征描述与设计图纸不符，投标人报价时应按（ ）确定综合单价。",[505,507,509,511],{"key":20,"text":506,"correct":35},"设计图纸",{"key":24,"text":508,"correct":35},"预算定额",{"key":27,"text":510,"correct":35},"企业定额",{"key":30,"text":512,"correct":22},"工程量清单",{"id":514,"libraryId":5,"type":40,"typeLabel":41,"stem":515,"options":516,"answer":24,"analysis":37},1138870,"根据《建设工程工程量清单计价规范》（GB50500-2008），采用工程量清单招标的工程，投标人在投标报价时不得作为竞争性费用的是（ ）。",[517,518,519,521],{"key":20,"text":272,"correct":35},{"key":24,"text":302,"correct":22},{"key":27,"text":520,"correct":35},"夜间施工费",{"key":30,"text":99,"correct":35},{"id":523,"libraryId":5,"type":40,"typeLabel":41,"stem":524,"options":525,"answer":24,"analysis":37},1138871,"根据《建设工程工程量清单计价规范》(GB 50500--2008)，若施工中施工图纸或设计变更与工程量清单项目特征描述不一致时，发、承包双方应（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":35},"按照工程量清单项目特征描述确定综合单价",{"key":24,"text":529,"correct":22},"按实际施工的项目特征，依据合同约定重新确定综合单价",{"key":27,"text":531,"correct":35},"通过仲裁确定综合单价",{"key":30,"text":533,"correct":35},"按照行业建设主管部门要求确定综合单价",{"id":535,"libraryId":5,"type":40,"typeLabel":41,"stem":536,"options":537,"answer":24,"analysis":37},1138872,"根据《建设工程工程量清单计价规范》，若施工中施工图纸或设计变更与工程量清单项目特征描述不一致时，发、承包双方应（ ）。",[538,539,540,541],{"key":20,"text":527,"correct":35},{"key":24,"text":529,"correct":22},{"key":27,"text":531,"correct":35},{"key":30,"text":533,"correct":35},{"id":543,"libraryId":5,"type":40,"typeLabel":41,"stem":544,"options":545,"answer":27,"analysis":37},1138873,"按照《建设工程工程量清单计价规范》规定，投标报价中的企业管理费费率应当（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":35},"按照国家定额标准确定",{"key":24,"text":549,"correct":35},"按照行业建设主管部门对定标准确定",{"key":27,"text":551,"correct":22},"由投标人根据本企业近年的企业管理费核算数据自行测定",{"key":30,"text":553,"correct":35},"按照招标文件规定标准确定",{"id":555,"libraryId":5,"type":40,"typeLabel":41,"stem":556,"options":557,"answer":30,"analysis":37},1138874,"投标企业没有企业定额时，可根据企业自身情况参照（ ）进行调整。",[558,560,561,563],{"key":20,"text":559,"correct":35},"行业计价定额",{"key":24,"text":508,"correct":35},{"key":27,"text":562,"correct":35},"国家计价定额",{"key":30,"text":564,"correct":22},"消耗量定额",{"id":566,"libraryId":5,"type":40,"typeLabel":41,"stem":567,"options":568,"answer":20,"analysis":37},1138875,"投标人对招标人提供的措施项目清单所列项目，按规定（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"可根据企业自身情况作适当变更增减",{"key":24,"text":572,"correct":35},"不得进行变更增减",{"key":27,"text":574,"correct":35},"若要变更增减，应事先征得招标人同意",{"key":30,"text":576,"correct":35},"若要变更增减，应事先征得工程师同意",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":159,"analysis":37},1138876,"根据《建设工程工程量清单计价规范》（GB50500-2008），关于投标人投标报价编制的说法，正确的有（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"投标报价应以投标人的企业定额为依据",{"key":24,"text":584,"correct":35},"投标报价应根据投标人的投标战略确定，必要的时候可以低于成本",{"key":27,"text":586,"correct":22},"投标中若发现清单中的项目特征与设计图纸不符，应以项目特征为准",{"key":30,"text":588,"correct":22},"招标文件中要求投标人承担的风险费用，投标人应在综合单价中予以考虑",{"key":33,"text":590,"correct":35},"投标人可以根据项目的复杂程度调整招标人清单中的暂列金额的大小",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":605,"analysis":37},1138877,"下面关于投标价编制内容的说法，正确的是（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":35},"投标人可以考虑对投标总价作适当优惠",{"key":24,"text":598,"correct":22},"规费和税金不得作为竞争性费用",{"key":27,"text":600,"correct":22},"暂列金额应按照其他项目清单中列出的金额填写，不得变动",{"key":30,"text":602,"correct":22},"投标人可根据工程项目实际情况以及施工组织设计或施工方案，自主确定措施项目费",{"key":33,"text":604,"correct":22},"投标企业没有企业定额时可根据企业自身情况参照消耗量定额进行调整","BCDE",{"id":607,"libraryId":5,"type":40,"typeLabel":41,"stem":608,"options":609,"answer":30,"analysis":37},1138879,"(2014真题)因暴雨引发山体滑坡而实施的公路交通紧急抢修项目，其合同计价方式宜采用()。",[610,612,614,616],{"key":20,"text":611,"correct":35},"固定总价合同",{"key":24,"text":613,"correct":35},"固定单价合同",{"key":27,"text":615,"correct":35},"可调单价合同",{"key":30,"text":617,"correct":22},"成本加酬金合同",[619,622,625,628,631,634],{"id":40,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":40},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":40},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":40},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]