[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,24,50,2696,[13,34,46,58,70,80,92,102,120,135,149,161,173,185,197,209,221,232,244,254,266,275,285,300,312,324,336,348,358,373,384,396,408,420,432,444,456,470,482,494,506,518,530,542,552,564,576,587,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1138749,1,"单选题","根据《建筑工程工程量清单计价规范》（GB50500--2008），分部分项工程量清单中，确定综合单价的依据是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","计量单位",false,{"key":24,"text":25,"correct":26},"B","项目特征",true,{"key":28,"text":29,"correct":22},"C","项目编码",{"key":31,"text":32,"correct":22},"D","项目名称","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1138750,"暂估价是招标人在工程量清单中提供的用于支付必然发生但暂时不能确定价格的材料的单价以及专业工程的金额，应列入（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分部分项工程量清单",{"key":24,"text":41,"correct":22},"措施项目费用",{"key":28,"text":43,"correct":26},"其他项目清单",{"key":31,"text":45,"correct":22},"规费项目清单",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1138751,"根据《建设工程工程量清单计价规范》，分部分项工程清单应按统一的（ ）进行编制。",[50,52,54,56],{"key":20,"text":51,"correct":22},"项目编码、项目名称、项目特征",{"key":24,"text":53,"correct":26},"项目编码、项目名称、计量单位",{"key":28,"text":55,"correct":22},"项目名称、项目特征、计量单位",{"key":31,"text":57,"correct":22},"项目编码、计量单位、项目特征",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1138752,"工程量清单作为招标文件的组成部分，其完整性和准确性应由（ ）负责。",[62,64,66,68],{"key":20,"text":63,"correct":22},"监理人",{"key":24,"text":65,"correct":26},"招标人",{"key":28,"text":67,"correct":22},"招投标管理部门",{"key":31,"text":69,"correct":22},"投标人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1138753,"分部分项工程清单不包括（ ）。",[74,76,77,78],{"key":20,"text":75,"correct":26},"项目金额",{"key":24,"text":29,"correct":22},{"key":28,"text":21,"correct":22},{"key":31,"text":79,"correct":22},"工程数量",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":31,"analysis":33},1138754,"根据《建设工程工程量清单计价规范》(GB 50500--2008)编制的工程量清单中，某分部分项工程的项目编码是010302004005，则“005”的含义是（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"工程分类顺序码",{"key":24,"text":87,"correct":22},"分项工程顺序码",{"key":28,"text":89,"correct":22},"分部工程顺序码",{"key":31,"text":91,"correct":26},"工程量清单项目顺序码",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1138755,"根据《建设工程工程量清单计价规范》（GB50500-2013），招标工程量清单的准确性和完整性应由（ ）负责。",[96,97,99,101],{"key":20,"text":69,"correct":22},{"key":24,"text":98,"correct":22},"招标人指定的招标代理机构",{"key":28,"text":100,"correct":22},"招标人的上级部门",{"key":31,"text":65,"correct":26},{"id":103,"libraryId":5,"type":104,"typeLabel":105,"stem":106,"options":107,"answer":119,"analysis":33},1138756,2,"多选题","工程量清单计价中关于工程量计算说法正确的是（ ）。",[108,110,112,114,116],{"key":20,"text":109,"correct":26},"除另有说明外，所有清单项目的工程量应以实体工程量为准",{"key":24,"text":111,"correct":26},"除另有说明外，所有清单项目的工程量应以完成后的净值计算",{"key":28,"text":113,"correct":22},"投标报价时，不应再考虑施工中的各种损耗",{"key":31,"text":115,"correct":26},"投标报价时，应在单价中考虑施工中需要增加的工程量",{"key":117,"text":118,"correct":22},"E","清单工程量应包括施工中所需的工作面等增加的工程量","ABD",{"id":121,"libraryId":5,"type":104,"typeLabel":105,"stem":122,"options":123,"answer":134,"analysis":33},1138757,"其他项目清单的列项内容包括（ ）。",[124,126,128,130,132],{"key":20,"text":125,"correct":26},"暂列金额",{"key":24,"text":127,"correct":22},"零星工作费",{"key":28,"text":129,"correct":26},"计日工",{"key":31,"text":131,"correct":26},"总承包服务费",{"key":117,"text":133,"correct":26},"暂估价","ACDE",{"id":136,"libraryId":5,"type":104,"typeLabel":105,"stem":137,"options":138,"answer":148,"analysis":33},1138758,"工程量清单由（ ）等组成。",[139,140,142,144,146],{"key":20,"text":39,"correct":26},{"key":24,"text":141,"correct":22},"综合单价分析清单",{"key":28,"text":143,"correct":26},"措施项目清单",{"key":31,"text":145,"correct":22},"其他项目价格清单",{"key":117,"text":147,"correct":22},"主要材料价格清单","AC",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},1138759,"根据《建设工程工程量清单计价规范》（GB50500-2008）编制的分部分项工程量清单，其工程数量是按照（ ）计算的。",[153,155,157,159],{"key":20,"text":154,"correct":26},"设计文件图示尺寸的工程量净值",{"key":24,"text":156,"correct":22},"设计文件结合不同施工方案确定的工程量平均值",{"key":28,"text":158,"correct":22},"工程实体量和损耗量之和",{"key":31,"text":160,"correct":22},"实际施工完成的全部工程量",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1138760,"编制措施项目清单时，大型机械设备进出场及按拆、混凝土模板及支架、脚手架、施工排水降水、垂直运输机械、组装平台等项目的设置主要参考（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"相关的工程验收规范",{"key":24,"text":168,"correct":26},"拟建工程的常规施工技术",{"key":28,"text":170,"correct":22},"拟建工程的设计文件",{"key":31,"text":172,"correct":22},"相关的施工规范",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":24,"analysis":33},1138761,"根据《建设工程工程量清单计价规范》（GB 50500-2008），垂直运输机械费应列在（ ）中。",[177,179,181,183],{"key":20,"text":178,"correct":22},"分部分项工程量清单与计价表",{"key":24,"text":180,"correct":26},"措施项目清单与计价表",{"key":28,"text":182,"correct":22},"其他项目清单与计价汇总表",{"key":31,"text":184,"correct":22},"专业工程暂估价表",{"id":186,"libraryId":5,"type":104,"typeLabel":105,"stem":187,"options":188,"answer":196,"analysis":33},1138762,"根据拟建工程的具体情况，列入工程量清单中其他项目清单的有（ ）。",[189,190,192,193,194],{"key":20,"text":125,"correct":26},{"key":24,"text":191,"correct":22},"已完工程及设备保护费",{"key":28,"text":133,"correct":26},{"key":31,"text":129,"correct":26},{"key":117,"text":195,"correct":22},"文明施工费","ACD",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1138763,"根据《建设工程工程量清单计价规范》（GB50500），关于工程量清单编制的说法，正确的是（ ）",[201,203,205,207],{"key":20,"text":202,"correct":26},"同一招标工程的项目编码不能重复",{"key":24,"text":204,"correct":22},"措施项目都应该以“项”为计量单位",{"key":28,"text":206,"correct":22},"所有清单项目的工程量都应以实际施工的工程量为准",{"key":31,"text":208,"correct":22},"暂估价是用于施工中可能发生工程变更时的工程价款调整的费用",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":31,"analysis":33},1138764,"根据《建设工程工程量清单计价规范》，十二位分部分项工程量清单项目编码中，由工程量清单编制人设置的是第（ ）位。",[213,215,217,219],{"key":20,"text":214,"correct":22},"三至四",{"key":24,"text":216,"correct":22},"五至六",{"key":28,"text":218,"correct":22},"七至九",{"key":31,"text":220,"correct":26},"十至十二",{"id":222,"libraryId":5,"type":104,"typeLabel":105,"stem":223,"options":224,"answer":231,"analysis":33},1138766,"按照《建设工程工程量清单计价规范》规定，工程量清单应当由分部分项工程量清单及（ ）组成。",[225,226,227,228,229],{"key":20,"text":29,"correct":22},{"key":24,"text":143,"correct":26},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"key":117,"text":230,"correct":26},"税金项目清单","BCDE",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":28,"analysis":33},1138767,"根据《建设工程工程量清单计价规范》（GB50500-2008），分部分项工程量清单中所列工程量以形成工程实体为准，按（ ）计算。",[236,238,240,242],{"key":20,"text":237,"correct":22},"施工方案计算出来的数值",{"key":24,"text":239,"correct":22},"实际完成的全部工程量",{"key":28,"text":241,"correct":26},"工程完成后的净值",{"key":31,"text":243,"correct":22},"工程实体量与耗损量之和",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":24,"analysis":33},1138768,"工程量清单的准确性和完整性是由（ ）负责。",[248,249,250,252],{"key":20,"text":69,"correct":22},{"key":24,"text":65,"correct":26},{"key":28,"text":251,"correct":22},"发包人",{"key":31,"text":253,"correct":22},"承包人",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":28,"analysis":33},1138769,"根据《建设工程工程量清单计价规范》(GB 50500—2008)，除另有说明外，所有清单项目的工程量（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"均以清单列明工程量为准",{"key":24,"text":261,"correct":22},"按照清单计算公式计算确定",{"key":28,"text":263,"correct":26},"以实体工程量为准，并以完成后的净值计算",{"key":31,"text":265,"correct":22},"由发、承包双方友好协商确定",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":28,"analysis":33},1138770,"编制工程量清单时，若有总承包服务费，则应列在（ ）中。",[270,272,273,274],{"key":20,"text":271,"correct":22},"分部分项工程清单",{"key":24,"text":143,"correct":22},{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":22},{"id":276,"libraryId":5,"type":104,"typeLabel":105,"stem":277,"options":278,"answer":119,"analysis":33},1138771,"按《建设工程工程量清单计价规范》规定，分部分项工程量清单应按统一的（） 进行编制。",[279,280,281,282,283],{"key":20,"text":29,"correct":26},{"key":24,"text":32,"correct":26},{"key":28,"text":25,"correct":22},{"key":31,"text":21,"correct":26},{"key":117,"text":284,"correct":22},"工程量计算规则",{"id":286,"libraryId":5,"type":104,"typeLabel":105,"stem":287,"options":288,"answer":299,"analysis":33},1138772,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，工程量清单计价计算公式正确的有()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"措施项目费=∑措施项目工程量*措施项目综合单价",{"key":24,"text":292,"correct":26},"分部分项工程费=∑分部分项工程量*分部分项工程综合单价",{"key":28,"text":294,"correct":26},"单项工程造价=∑单位工程造价",{"key":31,"text":296,"correct":22},"单位工程造价=∑分部分项工程费",{"key":117,"text":298,"correct":22},"建设项目总造价=∑单项工程造价+工程建设其他费用+建设期利息","BC",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1138773,"(2014真题)根据《建设工程工程量清单计价规范》GB50500-2013，分部分项工程清单综合单价应包含()以及一定范围内的风险费用。",[304,306,308,310],{"key":20,"text":305,"correct":26},"人工费、材料和工程设备费、施工机具使用费、企业管理费、利润",{"key":24,"text":307,"correct":22},"人工费、材料费、施工机具使用费、企业管理费、规费",{"key":28,"text":309,"correct":22},"人工费、材料和工程设备费、施工机具使用费、规费、利润、税金",{"key":31,"text":311,"correct":22},"材料费、工程设备费、施工机具使用费、规费、税金、企业管理费",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1138777,"某技术方案进行单因素敏感性分析的结果是：产品售价下降10%时内部收益率的变化率为55%；原材料价格上涨10%时内部收益率的变化率为39%；建设投资上涨10%时内部收益率的变化率为50%；人工工资上涨10%时内部收益率的变化率为30%。则该技术方案的内部收益率对（ ）最敏感。",[316,318,320,322],{"key":20,"text":317,"correct":22},"人工工资",{"key":24,"text":319,"correct":26},"产品售价",{"key":28,"text":321,"correct":22},"原材料价格",{"key":31,"text":323,"correct":22},"建设投资",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":28,"analysis":33},1138778,"根据《建设工程工程量清单计价规范》（GB 50500—2013），关于分部分项工程量清单中工程计算量的说法，正确的是（ ）。 2016",[328,330,332,334],{"key":20,"text":329,"correct":22},"实际施工中的各种损耗应列入措施项目费中",{"key":24,"text":331,"correct":22},"所有招标清单项目工程量按实际施工工程量计算",{"key":28,"text":333,"correct":26},"采用工程量清单计算规则计算时，工程实体的工程量是唯一的",{"key":31,"text":335,"correct":22},"计算综合单价时需考虑施工方案增加的工程量，但不考虑施工中的材料损耗",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1138780,"根据《建设工程工程量清单计价？……》 清单中项目名称的说法，正确的是（ ）。 2016",[340,342,344,346],{"key":20,"text":341,"correct":22},"《计量规范》中的项目名称是分项工程名称，以工程主要材料命名",{"key":24,"text":343,"correct":26},"编制清单时，项目名称应根据《计量规范》的项目名称结合拟建工程实际确定",{"key":28,"text":345,"correct":22},"《计量规范》中的项目名称是分部工程名称，以工程实体命名",{"key":31,"text":347,"correct":22},"编制清单时，《计量规范》中的项目名称不能变化，但应补充项目规格、材质",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":31,"analysis":33},1138781,"根据《建设工程工程量清单计价规范》 （GB 50500-2013），不能列入其他项目清单的是（ ）。 2016",[352,354,355,356],{"key":20,"text":353,"correct":22},"专业工程暂估价",{"key":24,"text":129,"correct":22},{"key":28,"text":131,"correct":22},{"key":31,"text":357,"correct":26},"总承包人自行分包管理费",{"id":359,"libraryId":5,"type":104,"typeLabel":105,"stem":360,"options":361,"answer":372,"analysis":33},1138782,"根据《建设工程工程量清单计价规范》（GB 50500-2013），编制措施项目清单时，措施项目设置的依据有（ ）。 2016",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"投标企业的资质等级与规模",{"key":24,"text":365,"correct":26},"拟建工程的常规施工组织设计",{"key":28,"text":367,"correct":26},"拟建工程的常规施工技术方案",{"key":31,"text":369,"correct":26},"招标文件中需要通过一定技术措施才能实现的要求",{"key":117,"text":371,"correct":22},"实施中因变更可能产生的零星工作","BCD",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1138786,"根据《建设工程工程量清单计价规范》（GB50500-2013）编制分部分项清单时，编制人员须确定项目名称、计量单位、工程数量和（ ）。( 2015真题 )",[377,379,380,382],{"key":20,"text":378,"correct":22},"填表须知",{"key":24,"text":25,"correct":26},{"key":28,"text":381,"correct":22},"项目总说明",{"key":31,"text":383,"correct":22},"项目工程内容",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1138787,"根据《建设工程工程量清单计价规范》（GB50500-2013），编制工程量清单时，计日工表中的人工应按（ ）列项。( 2015真题 )",[388,390,392,394],{"key":20,"text":389,"correct":26},"工种",{"key":24,"text":391,"correct":22},"职称",{"key":28,"text":393,"correct":22},"职务",{"key":31,"text":395,"correct":22},"技术等级",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1138788,"招标人编制工程量清单时，对各专业工程现行《计量规范》中未包括的项目应作补充，则关于该补充项目及其编码的说法，正确的是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"该项目编码应由对应（计量规范）的代码和三位阿拉伯数字组成",{"key":24,"text":403,"correct":26},"清单编制人应将补充项目报省级或行业工程造价管理机构备案",{"key":28,"text":405,"correct":22},"清单编制人在最后一个清单项目后面自行补充该项目，不需编码",{"key":31,"text":407,"correct":22},"该项目按《计量规范》中相近或相似的清单项目编码",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1138795,"分部分项工程量清单中所列工程量应按规定的工程量计算规则计算，该规定是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":26},"《计价规范》附录",{"key":24,"text":415,"correct":22},"《计价规范》规范条文",{"key":28,"text":417,"correct":22},"行业协会",{"key":31,"text":419,"correct":22},"政府主管部门",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},1138796,"工程量清单一个最基本的功能是（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"为计价和询标、评标的基础",{"key":24,"text":427,"correct":22},"为施工过程中支付工程进度款提供依据",{"key":28,"text":429,"correct":22},"为办理竣工结算及工程索赔提供了重要依据",{"key":31,"text":431,"correct":26},"作为信息的载体，为潜在的投标者提供必要的信息",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":31,"analysis":33},1138797,"新版《建设工程工程量清单计价规范》GB50500-2008包括规范条文和附录两部分，规范条文中不包括（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"工程量清单编制",{"key":24,"text":439,"correct":22},"工程量清单计价",{"key":28,"text":441,"correct":22},"工程量清单计价表格",{"key":31,"text":443,"correct":26},"工程量清单项目及计算规则",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":28,"analysis":33},1138798,"清单一经报出，即被认为是包括了所有应该发生的措施项目的（ ）费用。",[448,450,452,454],{"key":20,"text":449,"correct":22},"大部分",{"key":24,"text":451,"correct":22},"主要",{"key":28,"text":453,"correct":26},"全部",{"key":31,"text":455,"correct":22},"一小部分",{"id":457,"libraryId":5,"type":104,"typeLabel":105,"stem":458,"options":459,"answer":134,"analysis":33},1138799,"工程量清单是（ ）的依据。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"进行工程索赔",{"key":24,"text":463,"correct":22},"编制项目投资估算",{"key":28,"text":465,"correct":26},"编制招标控制价",{"key":31,"text":467,"correct":26},"支付工程进度款",{"key":117,"text":469,"correct":26},"办理竣工结算",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1138801,"一般来讲，夜间施工费可采用（ ）计价。",[474,476,478,480],{"key":20,"text":475,"correct":26},"参数法",{"key":24,"text":477,"correct":22},"实物量法",{"key":28,"text":479,"correct":22},"分包法",{"key":31,"text":481,"correct":22},"比率法",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1138802,"《建设工程工程量清单计价规范》（GB50500）中的综合单价，是指完成工程量清单中一个规定计量单位项目所需的（ ），并考虑风险因素产生的费用。",[486,488,490,492],{"key":20,"text":487,"correct":26},"直接工程费、管理费、利润",{"key":24,"text":489,"correct":22},"直接工程费、利润、税金",{"key":28,"text":491,"correct":22},"直接费、利润、税金",{"key":31,"text":493,"correct":22},"直接费、接费、利润",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1138803,"全费用综合单价的计算公式为（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"人工费+材料费+机械使用费",{"key":24,"text":501,"correct":22},"人工费+材料费+机械使用费+利润+管理费",{"key":28,"text":503,"correct":22},"人工费+材料费+机械使用费+管理费+利润+税金",{"key":31,"text":505,"correct":26},"人工费+材料费+机械使用费+措施项目费+管理费+规费+利润+税金",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1138804,"在工程量清单计价中，其他项目费中的计日工和总承包服务费应（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"由招标人按估算金额确定",{"key":24,"text":513,"correct":22},"按照国家或省级、行业建设主管部门的规定计算确定",{"key":28,"text":515,"correct":26},"由承包人根据招标人提出的要求，按估算的费用确定",{"key":31,"text":517,"correct":22},"按照地区或行业定额估算确定",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":33},1138805,"根据现行《建筑安装工程费用项目组成》（建标【2013】44号），下列费用中，应计入分部分项工程费的是（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"安全文明施工费",{"key":24,"text":525,"correct":22},"二次搬运费",{"key":28,"text":527,"correct":26},"施工机械使用费",{"key":31,"text":529,"correct":22},"大型机械设备进出场及安拆费",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1138806,"下列各项不属于资金占用费的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"股票股利",{"key":24,"text":537,"correct":22},"银行借款利息",{"key":28,"text":539,"correct":22},"债券利息",{"key":31,"text":541,"correct":26},"发行股票支付的印刷费",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":28,"analysis":33},1138807,"根据《建设工程工程量清单计价规范》（GB 50500—2008）。采用工程量清单招标的工程，投标人在投标报价时不得作为竞争性费用的是（ ）。",[546,548,550,551],{"key":20,"text":547,"correct":22},"夜间施工费",{"key":24,"text":549,"correct":22},"施工排水降水费",{"key":28,"text":523,"correct":26},{"key":31,"text":525,"correct":22},{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":28,"analysis":33},1138808,"某分部分项工程，消耗人工费300万元，材料费2000万元，机械台班费3000万元，管理费费率为20%，利润率为5%，以直接工程费为取费基础，该分部分项工程费为（ ）万元。",[556,558,560,562],{"key":20,"text":557,"correct":22},"6360",{"key":24,"text":559,"correct":22},"6625",{"key":28,"text":561,"correct":26},"6678",{"key":31,"text":563,"correct":22},"5300",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1138809,"根据《建设工程工程量清单计价规范》（GB 50500—2008）计价的某土方工程，业主方提供的清单工程量为3951m3。施工企业预计的实际施工量为7902m3，预计完成该分项工程的直接费为115265.27元，管理费为39190.19元，利润为9221.22元，不考虑风险费和其他因素，则该分项工程的综合单价应为（ ）元\u002F m3。",[568,570,572,574],{"key":20,"text":569,"correct":26},"41.43",{"key":24,"text":571,"correct":22},"20.71",{"key":28,"text":573,"correct":22},"29.17",{"key":31,"text":575,"correct":22},"94.48",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1138810,"采用工程量清单计价法，分部分项工程量清单中项目的工程量是以完成后的净值计算的，对于由施工方案引起的工程费用的增加折算计入（ ）。",[580,582,584,585],{"key":20,"text":581,"correct":22},"工程索赔款",{"key":24,"text":583,"correct":26},"综合单价",{"key":28,"text":127,"correct":22},{"key":31,"text":586,"correct":22},"预留金",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},1138811,"在编制措施项目清单时，适用于使用参数法计算的措施项目是（ ）。",[591,592,594,596],{"key":20,"text":547,"correct":26},{"key":24,"text":593,"correct":22},"垂直运输",{"key":28,"text":595,"correct":22},"脚手架搭拆费",{"key":31,"text":597,"correct":22},"室内空气污染测试",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1138812,"措施项目清单中，（ ）适用于施工过程中必须发生，但在投标时很难具体分项预测，又无法单独列出项目内容的措施项目。",[602,604,606,608],{"key":20,"text":603,"correct":26},"参数法计价",{"key":24,"text":605,"correct":22},"实物量法计价",{"key":28,"text":607,"correct":22},"分包法计价",{"key":31,"text":609,"correct":22},"综合单价法",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":31,"analysis":33},1138813,"按照《建设工程工程量清单计价规范》（GB50500-2013）投标的工程，完全不能竞争的部分是（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":22},"分部分项工程费",{"key":24,"text":617,"correct":22},"措施项目费",{"key":28,"text":619,"correct":22},"其他项目费",{"key":31,"text":621,"correct":26},"规费",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]