[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,23,50,2696,[13,34,46,58,68,80,98,110,122,135,150,164,178,190,202,210,225,239,251,263,275,287,297,311,326,340,354,366,378,390,402,414,426,435,444,453,462,470,479,487,498,512,521,529,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1138680,1,"单选题","某学生宿舍建筑面积为2400㎡，按概算指标计算每平方米建筑面积的直接费为850元，因设计图纸与所选用的概算指标有差异，每100㎡建筑面积发生了如下表所示的变化，则修正后的单位直接费为（ ）元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","790.00",false,{"key":24,"text":25,"correct":26},"B","849.40",true,{"key":28,"text":29,"correct":22},"C","849.98",{"key":31,"text":32,"correct":22},"D","850.60","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1138682,"设备及安装工程概算的编制方法不包括()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"预算单价法",{"key":24,"text":41,"correct":22},"概算指标法",{"key":28,"text":43,"correct":26},"设备价值百分比法",{"key":31,"text":45,"correct":22},"扩大单价法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1138683,"某新建设项目建筑面积5000m2，按概算指标和地区材料预算单价等算出一般土建工程单位造价为1200元（其中，人、料、机费用1000元，综合费率20%）。但新建项目的设计资料与概算指标相比，其结构中有部分变更：设计资料中外墙1砖厚，预算单价200元\u002Fm3，而概算指标中外墙1砖厚，预算单价180元\u002Fm3，设计资料中每100m2建筑面积含外墙62m3，而概算指标中含47m3，其余条件均不考虑，则调整后的一般土建工程概算单价为（ ）元\u002F m3。( 2015真题 )",[50,52,54,56],{"key":20,"text":51,"correct":22},"1152.72",{"key":24,"text":53,"correct":22},"1203.60",{"key":28,"text":55,"correct":22},"1487.28",{"key":31,"text":57,"correct":26},"1247.28",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1138684,"某单位建筑工程初步设计深度不够，不能准确地计算工程量，但工程采用的技术比较成熟而又有类似指标可以利用时，编制该工程设计概算宜采用的方法是（ ）。( 2015真题 )",[62,63,65,67],{"key":20,"text":45,"correct":22},{"key":24,"text":64,"correct":22},"类似工程换算法",{"key":28,"text":66,"correct":22},"生产能力指数法",{"key":31,"text":41,"correct":26},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1138685,"某建设项目工程费用6800万元，其他费用1200万元，预备费500万元，建设期贷款利息370万元，铺底流动资金710万元。预计在建设中原房屋拆除变现收入100万元，试车收入大于支出金额150万元，则该项目总概算为（ ）万元。( 2015真题 )",[72,74,76,78],{"key":20,"text":73,"correct":22},"9580",{"key":24,"text":75,"correct":26},"9330",{"key":28,"text":77,"correct":22},"9680",{"key":31,"text":79,"correct":22},"9430",{"id":81,"libraryId":5,"type":82,"typeLabel":83,"stem":84,"options":85,"answer":97,"analysis":33},1138686,2,"多选题","建设项目总概算书的内容有编制说明和（ ）。( 2015真题 )",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"单位工程概算表",{"key":24,"text":89,"correct":22},"分部分项工程概算表",{"key":28,"text":91,"correct":26},"单项工程综合概算表",{"key":31,"text":93,"correct":26},"工程建设其他费用概算表",{"key":95,"text":96,"correct":26},"E","总概算表","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":24,"analysis":33},1138687,"（2019年真题）某建设项目的建筑面积为10000㎡，按类似工程概算指标计算的一般土建工程单位概算造价为1158.84元\u002F㎡（其中人、料、机费用为800元\u002F㎡），项目所在地建筑安装工程管理费率为8%，按人、料、机和企业管理费计算的规费费率为15%，利润率为7%;增值税税率为9%，与类似工程概算指标规定的结构特比较，该项目结构有部分变更，换出结构构件中每100㎡的人、料、机费用为12450元，换入结构构件中每100㎡的人、料、机费用为15800元，人、料、机费用均不包含增值税可抵扣进项模额，则该项目一般土建工程修正后的概算单价为(（2019年真题）（2019年真题）)元\u002F㎡。",[102,104,106,108],{"key":20,"text":103,"correct":22},"833.50",{"key":24,"text":105,"correct":26},"1207.36",{"key":28,"text":107,"correct":22},"1192.34",{"key":31,"text":109,"correct":22},"1316.84",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":24,"analysis":33},1138690,"（2020年真题）利用概算定额编制单位工程概算的工作有：①计算单位工程的人、料、机费用;②列出分项工程并计算工程量;③计算企业管理费、利润、规费和税金;④确定分部分项工程的概算定额单价;⑤计算单位工程概算造价;编制正确的顺序是（ ）。",[114,116,118,120],{"key":20,"text":115,"correct":22},"④②①⑤③",{"key":24,"text":117,"correct":26},"②④①③⑤",{"key":28,"text":119,"correct":22},"①②③④⑤",{"key":31,"text":121,"correct":22},"④①②③⑤",{"id":123,"libraryId":5,"type":82,"typeLabel":83,"stem":124,"options":125,"answer":134,"analysis":33},1138692,"施工图预算编制的可采用的方法有（ ）。",[126,128,130,131,133],{"key":20,"text":127,"correct":26},"工料单价法",{"key":24,"text":129,"correct":26},"综合单价法",{"key":28,"text":45,"correct":22},{"key":31,"text":132,"correct":22},"税费单价法",{"key":95,"text":41,"correct":22},"AB",{"id":136,"libraryId":5,"type":82,"typeLabel":83,"stem":137,"options":138,"answer":149,"analysis":33},1138693,"施工图预算的编制依据包括（ ）。",[139,141,143,145,147],{"key":20,"text":140,"correct":22},"施工定额",{"key":24,"text":142,"correct":26},"施工组织设计",{"key":28,"text":144,"correct":26},"预算定额和地区单位估价表",{"key":31,"text":146,"correct":26},"经批准的设计概算文件",{"key":95,"text":148,"correct":26},"经批准和会审的施工图设计文件及有关标准图集","BCDE",{"id":151,"libraryId":5,"type":82,"typeLabel":83,"stem":137,"options":152,"answer":163,"analysis":33},1138694,[153,155,157,159,161],{"key":20,"text":154,"correct":26},"批准的设计概算",{"key":24,"text":156,"correct":26},"相应预算定额或地区单位估价表",{"key":28,"text":158,"correct":22},"地方政府发布的区域发展规划",{"key":31,"text":160,"correct":26},"批准的施工图纸",{"key":95,"text":162,"correct":26},"项目的技术复杂程度","ABDE",{"id":165,"libraryId":5,"type":82,"typeLabel":83,"stem":166,"options":167,"answer":177,"analysis":33},1138697,"施工图预算的编制依据有（ ）。( 2015真题 )",[168,170,172,174,175],{"key":20,"text":169,"correct":22},"建设单位的资金到位情况",{"key":24,"text":171,"correct":22},"施工投标单位的资质等级",{"key":28,"text":173,"correct":22},"施工投标单位的施工组织设计",{"key":31,"text":154,"correct":26},{"key":95,"text":176,"correct":26},"批准的施工图设计图纸","DE",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1138699,"在施工企业组织施工生产的过程中，作为控制施工成本依据的是（ ） 。",[182,184,186,188],{"key":20,"text":183,"correct":22},"设计概算",{"key":24,"text":185,"correct":22},"投资估算",{"key":28,"text":187,"correct":26},"施工图预算",{"key":31,"text":189,"correct":22},"预算手册",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1138700,"施工图预算对施工单位的作用不包括（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"是监督检查执行定额标准、测算造价指数及审定招标工程标底的重要依据",{"key":24,"text":197,"correct":22},"是控制施工成本的依据",{"key":28,"text":199,"correct":22},"是进行施工准备的依据",{"key":31,"text":201,"correct":22},"是确定投标报价的依据",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1138701,"在施工企业组织施工生产的过程中，作为施工单位编制进度计划、统计完成工作量、进行经济核算的依据是（ ）。",[206,207,208,209],{"key":20,"text":183,"correct":22},{"key":24,"text":185,"correct":22},{"key":28,"text":187,"correct":26},{"key":31,"text":189,"correct":22},{"id":211,"libraryId":5,"type":82,"typeLabel":83,"stem":212,"options":213,"answer":224,"analysis":33},1138702,"对施工单位而言，施工图预算是（ ）的依据。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"确定投标报价",{"key":24,"text":217,"correct":26},"控制施工成本",{"key":28,"text":219,"correct":22},"进行贷款",{"key":31,"text":221,"correct":22},"编制工程概算",{"key":95,"text":223,"correct":26},"进行施工准备","ABE",{"id":226,"libraryId":5,"type":82,"typeLabel":83,"stem":227,"options":228,"answer":97,"analysis":33},1138703,"关于传统计价模式下施工图预算的作用的说法，正确的有（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":26},"施工图预算是施工单位确定投标报价的依据",{"key":24,"text":232,"correct":22},"施工图预算是报审项目投资额的依据",{"key":28,"text":234,"correct":26},"施工图预算是施工单位进行施工准备的依据",{"key":31,"text":236,"correct":26},"施工图预算是监督检查执行定额标准的依据",{"key":95,"text":238,"correct":26},"施工图预算是控制施工成本的依据",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":28,"analysis":33},1138706,"定额单价法编制施工图预算的过程包括：①计算工程量；②套用定额单价，计算直接工程费；③按计价程序计取其他费用，并汇总造价；④编制工料分析表；⑤准备资料，熟悉施工图纸。正确的排列顺序是（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":22},"④⑤②①③",{"key":24,"text":246,"correct":22},"④⑤①②③",{"key":28,"text":248,"correct":26},"⑤①②④③",{"key":31,"text":250,"correct":22},"⑤②①③④",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":28,"analysis":33},1138707,"采用定额单价法计算工程费用时，若分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，对定额的处理方法一般是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":22},"编制补充单价表",{"key":24,"text":258,"correct":22},"直接套用定额单价",{"key":28,"text":260,"correct":26},"调量不换价",{"key":31,"text":262,"correct":22},"按实际价格换算定额单价",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":20,"analysis":33},1138708,"实物量法和定额单价法在编制施工图预算的主要区别在于（ ）不同。",[267,269,271,273],{"key":20,"text":268,"correct":26},"直接工程费计算过程",{"key":24,"text":270,"correct":22},"依据的定额",{"key":28,"text":272,"correct":22},"工程量的计算规则",{"key":31,"text":274,"correct":22},"确定利润的方法",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":31,"analysis":33},1138709,"采用定额单价法编制施工图预算时，出现分项工程的主要材料品种与预算单价或地区单位估价表中规定的材料不一致时，正确的处理方式是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":22},"不可以直接套用定额单价，应根据实际使用材料编制补充单位估算表",{"key":24,"text":282,"correct":22},"直接套用定额单价，不考虑材料品种差异的影响",{"key":28,"text":284,"correct":22},"直接套用定额单价，根据实际使用材料对材料数量进行调整",{"key":31,"text":286,"correct":26},"不可以直接套用定额单价，应根据实际使用材料价格换算分项工程预算单价",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":28,"analysis":33},1138710,"误差较小，适用于市场经济条件波动较大的施工图预算编制方法是（ ）。",[291,293,294,296],{"key":20,"text":292,"correct":22},"单价法",{"key":24,"text":39,"correct":22},{"key":28,"text":295,"correct":26},"实物法",{"key":31,"text":129,"correct":22},{"id":298,"libraryId":5,"type":82,"typeLabel":83,"stem":299,"options":300,"answer":163,"analysis":33},1138711,"采用定额单价法编制施工图预算，计算直接工程费时需注意几项内容包括（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"分项工程的名称、规格、计量单位与定额单价或单位估价表中所列内容完全一致时，可以直接套用定额单价",{"key":24,"text":304,"correct":26},"分项工程的主要材料品种与定额单价或单位估价表中规定材料不一致时，需要按实际使用材料价格",{"key":28,"text":306,"correct":22},"对计算结果的计量单位进行调整，使之与定额中相应的分部分项工程的计量单位保持一致",{"key":31,"text":308,"correct":26},"分项工程不能直接套用定额、不能换算和调整时，应编制补充单位估价表",{"key":95,"text":310,"correct":26},"分项工程施工工艺条件与定额单价或单位估债表不一致而造成人工、机械的数量数量减时，一般调量不换价",{"id":312,"libraryId":5,"type":82,"typeLabel":83,"stem":313,"options":314,"answer":325,"analysis":33},1138712,"采用定额单价法编制施工图预算过程中，工料分析表的编制依据有（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":26},"分部分项工程实物工程量",{"key":24,"text":318,"correct":26},"预算定额项目中所列的用工数量",{"key":28,"text":320,"correct":22},"当时当地的市场价格信息",{"key":31,"text":322,"correct":26},"预算定额项目中所列的材料数量",{"key":95,"text":324,"correct":22},"投标企业的企业定额","ABD",{"id":327,"libraryId":5,"type":82,"typeLabel":83,"stem":328,"options":329,"answer":224,"analysis":33},1138713,"采用定额单价法编制施工图预算的最后一步是填写编制说明，编制说明应写明预算所包括的工程内容范围、依据和图纸编号，以及（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"承包方式",{"key":24,"text":333,"correct":26},"套用单价需补充说明的问题",{"key":28,"text":335,"correct":22},"预算总造价和单方造价",{"key":31,"text":337,"correct":22},"采用的取费费率",{"key":95,"text":339,"correct":26},"有关部门现行的调价文件号",{"id":341,"libraryId":5,"type":82,"typeLabel":83,"stem":342,"options":343,"answer":224,"analysis":33},1138714,"关于定额单价法编制施工图预算的说法，正确的有（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"当分项工程的名称、规格、计量单位与定额单价中所列内容完全一致时，可直接套用定额单价",{"key":24,"text":347,"correct":26},"当分项工程的主要材料的品种与定额单价中规定的材料不一致时，应该把实际使用材料价格换算定额单价",{"key":28,"text":349,"correct":22},"当分项工程施工工艺条件与定额单价不一致而造成人工、机械的数量增减时，应调价不换量",{"key":31,"text":351,"correct":22},"当本地区统一的定额单价表中没有与本项目分项工程相应的内容时，可套用邻近地区的单价估算表",{"key":95,"text":353,"correct":26},"当分项工程不能直接套用定额、不能换算和调整时，应编制补充单位估价表。",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1138715,"(2014真题)采用工程量清单招标时，提供招标工程量清单并对其完整性和准确性负责的单位是()。",[358,360,362,364],{"key":20,"text":359,"correct":26},"发布招标文件的招标人",{"key":24,"text":361,"correct":22},"发放招标文件的招标代理人",{"key":28,"text":363,"correct":22},"编制清单的工程造价咨询人",{"key":31,"text":365,"correct":22},"招标人的上级管理单位",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1138717,"(2014真题)施工图预算审核时，利用房屋建筑工程标准层建筑面积数对楼面找平层、天棚抹灰等工程量进行审查的方法，属于()。",[370,372,374,376],{"key":20,"text":371,"correct":26},"分组计算审查法",{"key":24,"text":373,"correct":22},"重点审查法",{"key":28,"text":375,"correct":22},"筛选审查法",{"key":31,"text":377,"correct":22},"对比审查法",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1138719,"(2014真题)某分部分项工程的清单编码为010302004014，则该分部分项工程的清单项目顺序码为()。",[382,384,386,388],{"key":20,"text":383,"correct":22},"01",{"key":24,"text":385,"correct":26},"014",{"key":28,"text":387,"correct":22},"03",{"key":31,"text":389,"correct":22},"004",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":28,"analysis":33},1138721,"采用定额单价法编制施工图预算时，如果分项工程的某一种主要材料品种与定额单价中规定的材料品种不完全一致，该分项工程单价的确定方法是（ ）。( 2015真题 )",[394,396,398,400],{"key":20,"text":395,"correct":22},"直接套用同类材料的定额单价",{"key":24,"text":397,"correct":22},"调整工程量而不换算定额单价",{"key":28,"text":399,"correct":26},"按实际使用材料价格换算定额单价",{"key":31,"text":401,"correct":22},"编制补充定额单价",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1138722,"实物量法编制施工图预算所用的材料单价应采用（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"网上咨询厂家的报价",{"key":24,"text":409,"correct":22},"编制预算定额时采用的单价",{"key":28,"text":411,"correct":26},"当时当地的实际价格",{"key":31,"text":413,"correct":22},"预算定额中采用的单价加上运杂费",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1138726,"施工图预算审查的步骤是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"作好准备工作，选择审查方法，审查各项内容",{"key":24,"text":421,"correct":22},"作好准备工作，选择审查方法，调整预算",{"key":28,"text":423,"correct":22},"选择审查方法，综合整理资料，调整预算",{"key":31,"text":425,"correct":26},"准备工作，选择审查方法，审查相应内容，整理并调整预算",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1138727,"施工图预算审查方法中，（ ）方法适用于审查住宅工程或不具备全面审查条件的工程。",[430,431,432,434],{"key":20,"text":373,"correct":22},{"key":24,"text":377,"correct":22},{"key":28,"text":433,"correct":22},"标准预算审查法",{"key":31,"text":375,"correct":26},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},1138728,"审查精度高、效果好，但工作量大，时间较长的施工图预算审查方法是（ ）。",[439,441,442,443],{"key":20,"text":440,"correct":26},"逐项审查法",{"key":24,"text":373,"correct":22},{"key":28,"text":377,"correct":22},{"key":31,"text":375,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},1138729,"在进行施工图预算审查时，利用计算出的底层建筑面积或楼（地）面面积，对楼面找平层、顶棚抹灰等的工程量进行审查。这种审查方法是（ ）。",[448,449,450,451],{"key":20,"text":440,"correct":22},{"key":24,"text":371,"correct":26},{"key":28,"text":377,"correct":22},{"key":31,"text":452,"correct":22},"“筛选”审查法",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1138730,"对采用通用图纸的多个工程施工图预算进行审查时，为节省时间，宜采用的审查方法是（ ）。",[457,459,460,461],{"key":20,"text":458,"correct":22},"全图审查法",{"key":24,"text":375,"correct":22},{"key":28,"text":377,"correct":22},{"key":31,"text":433,"correct":26},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1138731,"施工图预算审查时，将分部分项工程的单位建筑面积指标总结归纳为工程量、价格、用工三个单方基本指标，然后利用这些基本指标对拟建项目分部分项工程预算进行审查的方法称为（ ）。",[466,467,468,469],{"key":20,"text":375,"correct":26},{"key":24,"text":377,"correct":22},{"key":28,"text":371,"correct":22},{"key":31,"text":440,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1138732,"当建设工程条件相同时，用同类已完工程的预算或未完但已经过审查修正的工程预算审查拟建工程的方法是（ ）。",[474,475,476,477],{"key":20,"text":433,"correct":22},{"key":24,"text":377,"correct":26},{"key":28,"text":375,"correct":22},{"key":31,"text":478,"correct":22},"全面审查法",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},1138733,"具有审查全面、细致、审查效果好等优点，但只适宜于规模较小，工艺较简单的工程预算审查的方法是（ ）。",[483,484,485,486],{"key":20,"text":377,"correct":22},{"key":24,"text":371,"correct":22},{"key":28,"text":440,"correct":26},{"key":31,"text":433,"correct":22},{"id":488,"libraryId":5,"type":82,"typeLabel":83,"stem":489,"options":490,"answer":497,"analysis":33},1138734,"施工图预算的审查方法主要有（ ）。",[491,492,493,494,496],{"key":20,"text":440,"correct":26},{"key":24,"text":371,"correct":26},{"key":28,"text":377,"correct":26},{"key":31,"text":495,"correct":22},"查询核实法",{"key":95,"text":433,"correct":26},"ABCE",{"id":499,"libraryId":5,"type":82,"typeLabel":83,"stem":500,"options":501,"answer":224,"analysis":33},1138735,"施工图预算审查的具体内容有（ ）。",[502,504,506,508,510],{"key":20,"text":503,"correct":26},"其他的有关费用",{"key":24,"text":505,"correct":26},"工程量",{"key":28,"text":507,"correct":22},"施工图样",{"key":31,"text":509,"correct":22},"预算编制说明",{"key":95,"text":511,"correct":26},"单价",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1138736,"当拟建工程与已完工程的建设条件和工程设计相同时，用已完工程的预算审查拟建工程的同类工程预算的方法是（ ）。 2016",[516,517,519,520],{"key":20,"text":433,"correct":22},{"key":24,"text":518,"correct":22},"分组审查法",{"key":28,"text":373,"correct":22},{"key":31,"text":377,"correct":26},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},1138739,"对于设计方案比较特殊，无同类工程可比，且审查精度要求高的施工图预算，适宜采用的审查方法是（ ）。( 2015真题 )",[525,526,527,528],{"key":20,"text":478,"correct":26},{"key":24,"text":433,"correct":22},{"key":28,"text":377,"correct":22},{"key":31,"text":373,"correct":22},{"id":530,"libraryId":5,"type":82,"typeLabel":83,"stem":531,"options":532,"answer":541,"analysis":33},1138741,"（2019年真题）运用筛选审查法审查建筑工程施工图预算时，需要先确定有关分部分项工程的建筑面积基本数值指标，其指标包括()。",[533,534,536,537,539],{"key":20,"text":505,"correct":26},{"key":24,"text":535,"correct":22},"能耗",{"key":28,"text":511,"correct":26},{"key":31,"text":538,"correct":26},"用工量",{"key":95,"text":540,"correct":22},"占地","ACD",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},1138743,"施工图预算编制的传统计价模式和工程量清单计价模式的主要区别在于（ ）不同。",[546,548,550,552],{"key":20,"text":547,"correct":26},"计算方式和管理方式",{"key":24,"text":549,"correct":22},"费用构成",{"key":28,"text":551,"correct":22},"编制主体",{"key":31,"text":553,"correct":22},"作用",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},1138744,"在传统计价模式下，编制施工图预算的要素价格是根据（ ）确定的。",[558,560,562,564],{"key":20,"text":559,"correct":22},"企业定额",{"key":24,"text":561,"correct":22},"市场价格",{"key":28,"text":563,"correct":22},"要素信息价",{"key":31,"text":565,"correct":26},"预算定额",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":24,"analysis":33},1138745,"(2014真题)采用实物量法编制施工图预算时，计算并复核工程量后紧接着进行的工作是()。",[570,572,574,576],{"key":20,"text":571,"correct":22},"套用定额单价，计算人料机费用",{"key":24,"text":573,"correct":26},"套用消耗定额，计算人料机消耗量",{"key":28,"text":575,"correct":22},"汇总人料机费用",{"key":31,"text":577,"correct":22},"计算管理费等其他各项费用",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},1138746,"根据《建设工程工程量清算单计价规范》（GB50500—2008），施工招标投标时，工程量清单应由（ ）负责提供。",[582,584,586,588],{"key":20,"text":583,"correct":22},"工程招标代理机构",{"key":24,"text":585,"correct":22},"工程设计单位",{"key":28,"text":587,"correct":22},"招投标管理部门",{"key":31,"text":589,"correct":26},"招标人",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},1138747,"根据《建设工程量清单计价规范》（GB50500-2008）编制的工程量清单中，某分部分项工程的项目编码010302004005，则“01”的含义是（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"分项工程顺序码",{"key":24,"text":597,"correct":22},"分部工程顺序码",{"key":28,"text":599,"correct":22},"专业工程顺序码",{"key":31,"text":601,"correct":26},"工程分类顺序码",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":24,"analysis":33},1138748,"在《建设工程工程量清单计价规范》中，其他项目清单一般包括（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":22},"预备金、分包费、材料费、机械使用费",{"key":24,"text":609,"correct":26},"暂列金额、暂估价、计工日、总承包服务费",{"key":28,"text":611,"correct":22},"总承包管理费、材料购置费、预留金、风险费",{"key":31,"text":613,"correct":22},"预留金、总承包费、分包费、材料购置费",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]