[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":592},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,22,50,2696,[13,34,46,58,70,82,94,106,118,136,150,165,175,190,202,214,226,238,250,260,271,286,301,313,325,335,347,356,368,378,390,398,407,415,427,436,445,457,469,478,489,500,514,524,534,546,555,563,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1138625,1,"单选题","某建设项目建设期为3 年，其贷款分年均衡拨付，3 年贷款额分别为300 万元、400 万元、500 万元，年贷款利率为6%，建设期只计息不支付，则该项目的建设期应计利息为（ ）万元。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","36",false,{"key":24,"text":25,"correct":22},"B","59.37",{"key":27,"text":28,"correct":22},"C","72",{"key":30,"text":31,"correct":32},"D","98.91",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1138626,"在编制投资估算时，某建设工程项目第2年年初借款本息累计为5000万元，第2年当年借款额为600万元，借款利率为6%，则该年应计的建设期利息为（ ）万元。",[38,40,42,44],{"key":20,"text":39,"correct":22},"264",{"key":24,"text":41,"correct":22},"282",{"key":27,"text":43,"correct":32},"318",{"key":30,"text":45,"correct":22},"336",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1138627,"(2014真题)某施工机械购置费用为120万元，折旧年限为6年，年平均工作250个台班，预计净残值率为3%，按工作台班法提折旧，该机械台班折旧费为()元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"800",{"key":24,"text":53,"correct":32},"776",{"key":27,"text":55,"correct":22},"638",{"key":30,"text":57,"correct":22},"548",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1138628,"设计概算的分级不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"单位工程概算",{"key":24,"text":65,"correct":22},"单项工程综合概算",{"key":27,"text":67,"correct":22},"建设工程项目总概算",{"key":30,"text":69,"correct":32},"单项工程概算",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1138631,"设计概算是设计单位编制和确定的建设工程项目从筹建至（ ）所需全部费用的文件。",[74,76,78,80],{"key":20,"text":75,"correct":22},"办理完竣工结算",{"key":24,"text":77,"correct":32},"竣工交付使用",{"key":27,"text":79,"correct":22},"项目报废",{"key":30,"text":81,"correct":22},"施工保修期满",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1138632,"既是工程拨款或货款的最高限额，又是控制单位工程预算的主要依据的文件是经过批准的（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"开工报告",{"key":24,"text":89,"correct":22},"资金申请报告",{"key":27,"text":91,"correct":32},"设计概算文件",{"key":30,"text":93,"correct":22},"项目建议书",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1138633,"下列投资概算中，属于建筑单位工程概算的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"机械设备及安装工程概算",{"key":24,"text":101,"correct":22},"电气设备及安装工程概算",{"key":27,"text":103,"correct":22},"工器具及生产家具购置费用概算",{"key":30,"text":105,"correct":32},"通风空调工程概算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1138634,"设计概算的“三级概算”是指（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"建筑工程概算、安装工程概算、设备及工器具购置费概算",{"key":24,"text":113,"correct":22},"建设投资概算、建设期利息概算、铺底流动资金概算",{"key":27,"text":115,"correct":22},"主要工程项目概算、辅助和服务性工程项目概算、室内外工程项目概算",{"key":30,"text":117,"correct":32},"单位工程概算、单项工程综合概算、建设工程项目总概算",{"id":119,"libraryId":5,"type":120,"typeLabel":121,"stem":122,"options":123,"answer":135,"analysis":33},1138635,2,"多选题","建设工程项目总概算是确定整个建设项目从筹建开始到竣工验收、交付使用所需的全部费用的文件，它是由（ ）等汇总编制而成。",[124,126,128,130,132],{"key":20,"text":125,"correct":32},"各单项工程综合概算",{"key":24,"text":127,"correct":32},"工程建设其他费用概算",{"key":27,"text":129,"correct":32},"预备费",{"key":30,"text":131,"correct":32},"建设期利息概算",{"key":133,"text":134,"correct":22},"E","设计概算","ABCD",{"id":137,"libraryId":5,"type":120,"typeLabel":121,"stem":138,"options":139,"answer":149,"analysis":33},1138636,"对于一般工业与民用建筑工程而言，建设工程项目总概算包括（ ）。",[140,142,143,145,147],{"key":20,"text":141,"correct":22},"建筑单位工程概算",{"key":24,"text":65,"correct":32},{"key":27,"text":144,"correct":32},"预备费、建设期利息概算",{"key":30,"text":146,"correct":22},"设备及安装单位工程概算",{"key":133,"text":148,"correct":32},"经营性项目铺底流动资金概算","BCE",{"id":151,"libraryId":5,"type":120,"typeLabel":121,"stem":152,"options":153,"answer":164,"analysis":33},1138637,"(2014真题)建筑安装工程施工图预算的编制依据()。",[154,156,158,160,162],{"key":20,"text":155,"correct":22},"中标通知书",{"key":24,"text":157,"correct":22},"现场签证",{"key":27,"text":159,"correct":32},"工程地质勘察资料",{"key":30,"text":161,"correct":32},"建设项目施工组织设计",{"key":133,"text":163,"correct":32},"批准的设计概算","CDE",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":30,"analysis":33},1138638,"下列单位工程概算中，属于设备及安装工程概算的是（ ）。 2016",[169,170,172,174],{"key":20,"text":105,"correct":22},{"key":24,"text":171,"correct":22},"电气照明工程概算",{"key":27,"text":173,"correct":22},"弱电工程概算",{"key":30,"text":103,"correct":32},{"id":176,"libraryId":5,"type":120,"typeLabel":121,"stem":177,"options":178,"answer":189,"analysis":33},1138639,"关于建设工程项目设计概算的内容与作用的说法，正确的有（ ）。 2016",[179,181,183,185,187],{"key":20,"text":180,"correct":32},"设计概算是项目实施过程造价控制管理的依据",{"key":24,"text":182,"correct":32},"设计概算是考核设计方案的经济合理性和控制施工图预算的依据",{"key":27,"text":184,"correct":22},"项目总概算是反映项目从设计至竣工交付使用所需全部费用的文件",{"key":30,"text":186,"correct":22},"单位工程概算中应包括工程建设其他费用概算",{"key":133,"text":188,"correct":32},"政府投资项目经主管部门审批的总概算是总造价的最高限额，不得任意突破","ABE",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1138641,"在进行单位建筑工程设计概算构成审查时，对材料预算价格的审查，重点是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"材料原价",{"key":24,"text":197,"correct":22},"运输费用",{"key":27,"text":199,"correct":32},"耗用量最大的主要材料",{"key":30,"text":201,"correct":22},"是否有重复计算或遗漏",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1138642,"在对某建设项目设计概算审查时，找到了与其关键技术基本相同、规模相近的同类项目的设计概算和施工图预算资料。则该建设项目的设计概算最适宜的审查方法是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"标准审查法",{"key":24,"text":209,"correct":22},"分和计算审查法",{"key":27,"text":211,"correct":32},"对比分析法",{"key":30,"text":213,"correct":22},"查询核实法",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1138643,"在对综合概算和总概算进行审查时，如概算总投资超过原批准投资估算达到一定比例，需要进一步审查超估值的原因，这个比例是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"10%以上",{"key":24,"text":221,"correct":22},"5%以上",{"key":27,"text":223,"correct":22},"15%",{"key":30,"text":225,"correct":22},"20%",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1138644,"根据《财政投资项目评审操作规程》（试行）（财办理[2002]619号），投送评审机构评审的项目概算应由项目（ ）提供。",[230,232,234,236],{"key":20,"text":231,"correct":32},"建设单位",{"key":24,"text":233,"correct":22},"主管部门",{"key":27,"text":235,"correct":22},"设计单位",{"key":30,"text":237,"correct":22},"施工单位",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1138645,"在进行单位设备及安装工程设计概算构成审查时，其审查重点是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"预算单价",{"key":24,"text":245,"correct":32},"设备清单与安装费用",{"key":27,"text":247,"correct":22},"设备重量",{"key":30,"text":249,"correct":22},"设备安装工艺",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1138646,"某建设项目投资规模较大，土建部分工程量较小，从国外引进的可对该项目概算进行审查最适合的方法是（ ）。",[254,256,257,259],{"key":20,"text":255,"correct":22},"联合会审法",{"key":24,"text":213,"correct":32},{"key":27,"text":258,"correct":22},"分组计算审查法",{"key":30,"text":211,"correct":22},{"id":261,"libraryId":5,"type":120,"typeLabel":121,"stem":262,"options":263,"answer":270,"analysis":33},1138647,"设计概算审查的方法包括（ ）。",[264,265,266,267,268],{"key":20,"text":255,"correct":32},{"key":24,"text":258,"correct":22},{"key":27,"text":211,"correct":32},{"key":30,"text":213,"correct":32},{"key":133,"text":269,"correct":22},"全面审查法","ACD",{"id":272,"libraryId":5,"type":120,"typeLabel":121,"stem":273,"options":274,"answer":285,"analysis":33},1138648,"企业应当组织工程、技术、财会等部门的相关专业人员对编制的概预算重审查（ ）等是否真实、完整、准确。",[275,277,279,281,283],{"key":20,"text":276,"correct":32},"编制依据",{"key":24,"text":278,"correct":32},"定额套用",{"key":27,"text":280,"correct":22},"单价的计算方法",{"key":30,"text":282,"correct":32},"项目内容",{"key":133,"text":284,"correct":32},"工程量的计算","ABDE",{"id":287,"libraryId":5,"type":120,"typeLabel":121,"stem":288,"options":289,"answer":300,"analysis":33},1138649,"建筑工程概算的审查，除审查工程量以外，还要审查（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"标准设备原价",{"key":24,"text":293,"correct":32},"采用的定额和指标",{"key":27,"text":295,"correct":32},"各项费用取费标准是滞符合规定",{"key":30,"text":297,"correct":32},"材料预算价格",{"key":133,"text":299,"correct":32},"各项费用所包含的具体内容是否重复计算","BCDE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":20,"analysis":33},1138650,"未经过批准的不得采用，不得强调特殊理由擅自提高费用标准，这是审查设计概算编制依据的（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":32},"合法性",{"key":24,"text":308,"correct":22},"时效性",{"key":27,"text":310,"correct":22},"限制性",{"key":30,"text":312,"correct":22},"适用范围",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},1138651,"新建工程与某已建成工程仅外墙饰面不同，已建成工程外墙为水泥砂浆抹面，单价为8.75元\u002F㎡，每平方米建筑面积消耗量为0.852㎡;新建工程外墙为贴釉面砖，单价为49.25元\u002F㎡，每平方米建筑面积消耗量为0.814㎡，若已建成工程概算指标为536元\u002F㎡，则新建工程修正概算指标为()元\u002F㎡ (2016)",[317,319,321,323],{"key":20,"text":318,"correct":22},"576.50",{"key":24,"text":320,"correct":22},"585.25",{"key":27,"text":322,"correct":32},"568.63",{"key":30,"text":324,"correct":22},"613.26",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":30,"analysis":33},1138652,"审查设计概算时，对一些关键设备和设施、重要装置、引进工程图纸不全、难以核算的较大投资宜采用的审查方法是（ ）。 2016",[329,330,332,334],{"key":20,"text":211,"correct":22},{"key":24,"text":331,"correct":22},"筛选审查法",{"key":27,"text":333,"correct":22},"标准预算审查法",{"key":30,"text":213,"correct":32},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":30,"analysis":33},1138653,"某建设工程项目拟订购5台国产设备，订货价格为50万元\u002F台，设备运杂费率为8%，设备安装费率为20%，采用概算指标法确定该项目的设备安装费为（ ）万元。",[339,341,343,345],{"key":20,"text":340,"correct":22},"54",{"key":24,"text":342,"correct":22},"24",{"key":27,"text":344,"correct":22},"20",{"key":30,"text":346,"correct":32},"50",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},1138655,"设计概算审查时，对图纸不全的复杂建筑安装工程投资，通过向同类工程的建设，施工企业征求意见判断其合理性，这种审查方法属于（ ）。( 2015真题 )",[351,352,354,355],{"key":20,"text":211,"correct":22},{"key":24,"text":353,"correct":22},"专家意见法",{"key":27,"text":213,"correct":32},{"key":30,"text":255,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1138656,"根据现行规定，在审查概算的投资规模、生产能力等是否符合原批准的可行性研究报告或者立项批文时，若发现概算总投资超过原批准投资估算的（ ）以上，需要进一步审查超估算的原因。( 2015真题 )",[360,362,364,366],{"key":20,"text":361,"correct":22},"5%",{"key":24,"text":363,"correct":32},"10%",{"key":27,"text":365,"correct":22},"3%",{"key":30,"text":367,"correct":22},"8%",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1138657,"某建设项目订购了50t的国产非标准设备，订货价格为50000元\u002Ft，已知设备运杂费率为8%，设备安装费率为20%，依概算指标法，该项目的设备安装工程概算价值为（ ）万元。",[372,374,375,376],{"key":20,"text":373,"correct":22},"4",{"key":24,"text":346,"correct":32},{"key":27,"text":340,"correct":22},{"key":30,"text":377,"correct":22},"324",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1138658,"当初步设计深度不够，不能准确地计算工程量，但工程设计采用的技术比较成熟而又有类似工程概算指标可以利用时，可以采用（ ）编制工程概算。",[382,384,386,388],{"key":20,"text":383,"correct":22},"扩大单价法",{"key":24,"text":385,"correct":32},"概算指标法",{"key":27,"text":387,"correct":22},"类似工程预算法",{"key":30,"text":389,"correct":22},"预算单价法",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1138659,"若初步设计有详细的设备清单，则可用于编制设备安装工程概算且精确性最高的方法是（ ）。",[394,395,396,397],{"key":20,"text":389,"correct":32},{"key":24,"text":383,"correct":22},{"key":27,"text":385,"correct":22},{"key":30,"text":387,"correct":22},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},1138660,"某工程初步设计深度不够，不能准确计算工程量，但工程设计采用的技术比较成熟，又有类似的概算指标可以利用，则编制工程概算适合采用的方法是（ ）。",[402,404,405,406],{"key":20,"text":403,"correct":22},"概算定额法",{"key":24,"text":387,"correct":22},{"key":27,"text":385,"correct":32},{"key":30,"text":389,"correct":22},{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1138661,"当技术方案的初步设计达到一定深度，建筑结构比较明确时，进行单位建筑工程概算编制时，可采用（ ）进行。",[411,412,413,414],{"key":20,"text":403,"correct":32},{"key":24,"text":385,"correct":22},{"key":27,"text":387,"correct":22},{"key":30,"text":389,"correct":22},{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":24,"analysis":33},1138662,"编制建设工程项目设计概算时，在收集原始资料后应进行的工作有：①确定有关数据；②单位工程概算书编制；③各项费用计算；④单项工程综合概算书编制。其正确顺序是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"③→①→②→④",{"key":24,"text":422,"correct":32},"①→③→②→④",{"key":27,"text":424,"correct":22},"③→②→①→④",{"key":30,"text":426,"correct":22},"①→②→③→④",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},1138663,"某工程已有详细的设计图纸，建筑建构非常明确，采用的技术很成熟，则编制该单位建筑工程概算精度最高的方法是（ ）。",[431,432,433,434],{"key":20,"text":403,"correct":32},{"key":24,"text":385,"correct":22},{"key":27,"text":387,"correct":22},{"key":30,"text":435,"correct":22},"修正概算指标法",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1138664,"在初步设计有详细设备清单时，应采用（ ）编制设备安装工程概算。",[440,442,443,444],{"key":20,"text":441,"correct":22},"估价法",{"key":24,"text":383,"correct":22},{"key":27,"text":389,"correct":32},{"key":30,"text":385,"correct":22},{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1138665,"采用按占设备价值百分比的概算指标编制设备安装工程概算时，该指标的计算基数是（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":32},"设备原价",{"key":24,"text":452,"correct":22},"运杂费",{"key":27,"text":454,"correct":22},"设备购置费",{"key":30,"text":456,"correct":22},"设备抵岸价",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":30,"analysis":33},1138666,"某非生产性建设工程项目只有一个单项工程，则该单项工程综合概算包括建筑单位工程概算、设备及安装单位工程概算以及（ ）概算。",[461,463,465,467],{"key":20,"text":462,"correct":22},"电气照明工程",{"key":24,"text":464,"correct":22},"生产家具购置费用",{"key":27,"text":466,"correct":22},"给水排水及采暖工程",{"key":30,"text":468,"correct":32},"工程建设其他费用",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},1138667,"某单位建筑工程初步设计已达到一定深度，建筑结构明确，能够计算出概算工程量，则编制该单位建筑工程概算最适合的方法是（ ）。",[473,474,475,476],{"key":20,"text":387,"correct":22},{"key":24,"text":385,"correct":22},{"key":27,"text":403,"correct":32},{"key":30,"text":477,"correct":22},"生产能力指数法",{"id":479,"libraryId":5,"type":120,"typeLabel":121,"stem":480,"options":481,"answer":149,"analysis":33},1138668,"建筑工程概算的编制方法有（ ）。",[482,484,485,486,488],{"key":20,"text":483,"correct":22},"设备价值百分比法",{"key":24,"text":387,"correct":32},{"key":27,"text":403,"correct":32},{"key":30,"text":487,"correct":22},"综合吨位指标法",{"key":133,"text":385,"correct":32},{"id":490,"libraryId":5,"type":120,"typeLabel":121,"stem":491,"options":492,"answer":270,"analysis":33},1138669,"单位建筑工程概算的常用编制方法有（ ）。",[493,494,496,497,498],{"key":20,"text":403,"correct":32},{"key":24,"text":495,"correct":22},"预算定额法",{"key":27,"text":385,"correct":32},{"key":30,"text":387,"correct":32},{"key":133,"text":499,"correct":22},"生产能力指标法",{"id":501,"libraryId":5,"type":120,"typeLabel":121,"stem":502,"options":503,"answer":300,"analysis":33},1138670,"设备安装工程概算的编制中，当初步设计的设备清单不完备，或安装预算单价及扩大综合单价不全，无法采用预算单价法和扩大单价法时，可采用概算指标法编制概算。进行计算的主要指标包括（ ）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"设备安装工程量",{"key":24,"text":507,"correct":32},"按每吨设备安装费的概算指标",{"key":27,"text":509,"correct":32},"按占设备价值的百分比（安装费率）的概算指标",{"key":30,"text":511,"correct":32},"按设备工程每平方米建筑面积的概算指标",{"key":133,"text":513,"correct":32},"按台、座、套、组、根或功率等为计量单位的概算指标",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1138671,"对于只有一个单项工程的工程建设其他费用概算，其费用不包括（ ）。",[518,520,521,522],{"key":20,"text":519,"correct":22},"建设期利息",{"key":24,"text":454,"correct":32},{"key":27,"text":129,"correct":22},{"key":30,"text":523,"correct":22},"固定资产投资方向调节税",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},1138672,"铺底流动资金一般按流动资金的（ ）计算。",[528,529,530,532],{"key":20,"text":363,"correct":22},{"key":24,"text":225,"correct":22},{"key":27,"text":531,"correct":32},"30%",{"key":30,"text":533,"correct":22},"50%",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1138673,"某建设项目以80000元的价格订购了一批非标准设备，设备安装费率为20%，采用概算指标法编制该项目的设备安装工程概算价值为（ ）万元。",[538,540,542,544],{"key":20,"text":539,"correct":32},"1.6",{"key":24,"text":541,"correct":22},"2.0",{"key":27,"text":543,"correct":22},"2.4",{"key":30,"text":545,"correct":22},"3.0",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1138674,"在进行设备安装工程概算编制时，当初步设计的设备清单不完备，或仅有成套设备的重量时，可采用（ ）编制概算。",[550,551,552,553],{"key":20,"text":389,"correct":22},{"key":24,"text":383,"correct":32},{"key":27,"text":385,"correct":22},{"key":30,"text":554,"correct":22},"类似工程量预算法",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":27,"analysis":33},1138675,"当初步设计有详细设备清单时，编制设备及安装工程概算宜采用的编制方法是（ ）。",[559,560,561,562],{"key":20,"text":383,"correct":22},{"key":24,"text":385,"correct":22},{"key":27,"text":389,"correct":32},{"key":30,"text":387,"correct":22},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":30,"analysis":33},1138676,"某工程已有详细的设计图纸，建筑结构非常明确，采用的技术很成熟，则编制该单位建筑工程概算精度最高的方法是（ ）。",[567,568,569,571],{"key":20,"text":385,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":570,"correct":22},"修正的概算指标法",{"key":30,"text":403,"correct":32},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1138677,"采用扩大单价法编制设备安装工程概算，其适用条件包括（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"初步设计有详细设备清单",{"key":24,"text":579,"correct":32},"初步设计的设备清单不完备",{"key":27,"text":581,"correct":22},"具有类似设备安装工程预算",{"key":30,"text":583,"correct":22},"安装预算单价不全",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":30,"analysis":33},1138678,"(2014真题)编制设备安装工程概算，当初步设计的设备清单不完备，可供采用的安装预算单价及扩大综合单价不全时，适宜采用的概算编制方法是()。",[588,589,590,591],{"key":20,"text":403,"correct":22},{"key":24,"text":383,"correct":22},{"key":27,"text":387,"correct":22},{"key":30,"text":385,"correct":32},[593,596,599,602,605,608],{"id":15,"name":594,"category":7,"favorite":595},"领导干部任职前廉政法规知识测试题",92,{"id":597,"name":598,"category":7,"favorite":15},595,"建筑结构与设备",{"id":600,"name":601,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":603,"name":604,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":606,"name":607,"category":7,"favorite":8},534,"BIM工程师",{"id":609,"name":607,"category":7,"favorite":8},535]