[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,21,50,2696,[13,34,46,58,68,80,98,110,122,137,149,160,171,183,193,205,217,229,239,254,266,280,293,303,315,330,342,354,363,378,390,402,414,426,438,450,461,472,483,492,504,516,528,540,552,564,576,588,599,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1138565,1,"单选题","某项目购买一台国产设备，其购置费为1650万元，运杂费率为10%，则该设备的原价为（ ）万元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1815",false,{"key":24,"text":25,"correct":26},"B","1500",true,{"key":28,"text":29,"correct":22},"C","1450",{"key":31,"text":32,"correct":22},"D","1350","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1138566,"对卖方来说承担的风险较大，在国际贸易中卖方一般不愿意采用的交货方式是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"内陆交货类",{"key":24,"text":41,"correct":26},"目的地交货类",{"key":28,"text":43,"correct":22},"厂家交货类",{"key":31,"text":45,"correct":22},"装运港交货类",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1138567,"根据我国增值税条例，从国外进口的设备，其增值税按照（ ）依税率直接计算应纳税额。",[50,52,54,56],{"key":20,"text":51,"correct":22},"离岸价",{"key":24,"text":53,"correct":26},"组成计税价格",{"key":28,"text":55,"correct":22},"到岸价",{"key":31,"text":57,"correct":22},"交货价",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1138568,"采用装运港船上交货价的进口设备，估算其购置费时，货价按照（ ）计算。",[62,64,65,67],{"key":20,"text":63,"correct":22},"出厂价",{"key":24,"text":55,"correct":22},{"key":28,"text":66,"correct":22},"抵岸价",{"key":31,"text":51,"correct":26},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},1138569,"按人民币计算，某进口设备的离岸价为1000万元，到岸价为1050万元，关税为105万元，银行财务费率为0.5%，则该设备的银行财务费为（ ）万元。",[72,74,76,78],{"key":20,"text":73,"correct":26},"5.00",{"key":24,"text":75,"correct":22},"5.25",{"key":28,"text":77,"correct":22},"5.33",{"key":31,"text":79,"correct":22},"5.78",{"id":81,"libraryId":5,"type":82,"typeLabel":83,"stem":84,"options":85,"answer":97,"analysis":33},1138571,2,"多选题","估算建设项目设备购置费时，可直接作为设备原价的有( ）。 2016",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"国产非标准设备成本价",{"key":24,"text":89,"correct":26},"国产标准设备出厂价",{"key":28,"text":91,"correct":26},"国产标准设备订货合同价",{"key":31,"text":93,"correct":26},"进口设备抵岸价",{"key":95,"text":96,"correct":22},"E","进口设备出厂价","BCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":31,"analysis":33},1138573,"某项目拟从国外进口一套设备，重1000吨，装运港船上交货价300万美元，国际运费标准每吨360美元，海上运输保险费率0.266%。美元银行外汇牌价6.1元人民币。则该套设备国外运输保险费为（ ）万元。( 2015真题 )",[102,104,106,108],{"key":20,"text":103,"correct":22},"4.868",{"key":24,"text":105,"correct":22},"4.881",{"key":28,"text":107,"correct":22},"5.452",{"key":31,"text":109,"correct":26},"5.467",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":20,"analysis":33},1138574,"关于国产设备运杂费估算的说法，正确的是（ ）。( 2015真题 )",[114,116,118,120],{"key":20,"text":115,"correct":26},"国产设备运杂费包括由设备制造厂交货地点运至工地仓库所发生的运费",{"key":24,"text":117,"correct":22},"国产设备运至工地后发生的装卸费不应包括在运杂费中",{"key":28,"text":119,"correct":22},"运杂费在计取时不区分沿海和内陆，统一按运输距离估算",{"key":31,"text":121,"correct":22},"工程承包公司采购设备的相关费用不应计入运杂费",{"id":123,"libraryId":5,"type":82,"typeLabel":83,"stem":124,"options":125,"answer":136,"analysis":33},1138575,"(2014真题)下列工程建设其他费用中，属于建设单位管理费的有()。",[126,128,130,132,134],{"key":20,"text":127,"correct":26},"工程招标费",{"key":24,"text":129,"correct":22},"可行性研究费",{"key":28,"text":131,"correct":22},"工程监理费",{"key":31,"text":133,"correct":26},"竣工验收费",{"key":95,"text":135,"correct":26},"零星固定资产购置费","ADE",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":20,"analysis":33},1138577,"关于联合试运转费的说法，正确的是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":26},"试运转收入大于费用支出的工程，不列此项费用",{"key":24,"text":144,"correct":22},"联合试运转费应包括每台设备安装时的调试和试车费用",{"key":28,"text":146,"correct":22},"试运转费用支出大于收入的工程，不列此项费用",{"key":31,"text":148,"correct":22},"试运转中因设备缺陷发生的处理费用应计入联合试运转费",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":28,"analysis":33},1138578,"与项目建设有关的其他费用中，不属于建设管理费的是（ ）。",[153,155,156,158],{"key":20,"text":154,"correct":22},"建设单位管理费",{"key":24,"text":131,"correct":22},{"key":28,"text":157,"correct":26},"工程保险费",{"key":31,"text":159,"correct":22},"工程质量监督费",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1138579,"某工程为了验证设计参数，按设计规定在施工过程中必须对一新型结构进行测试，该项费用由建设单位支出，应计入（ ）。",[164,166,168,169],{"key":20,"text":165,"correct":22},"勘察设计费",{"key":24,"text":167,"correct":22},"生产准备费",{"key":28,"text":133,"correct":22},{"key":31,"text":170,"correct":26},"研究试验费",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":24,"analysis":33},1138580,"与项目建设有关的其他费用中，工程保险费不包括（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":22},"建筑安装工程一切险",{"key":24,"text":178,"correct":26},"施工管理用财产、车辆保险费",{"key":28,"text":180,"correct":22},"进口设备财产保险",{"key":31,"text":182,"correct":22},"人身意外伤害险",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},1138581,"编制劳动安全卫生预评价报告书所需要的费用属于（ ）。",[187,189,190,191],{"key":20,"text":188,"correct":22},"与项目建设有关的其他费用",{"key":24,"text":129,"correct":22},{"key":28,"text":165,"correct":22},{"key":31,"text":192,"correct":26},"劳动安全卫生评价费",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":20,"analysis":33},1138582,"工程建设其他费中的联合试运转费是指在项目竣工验收前，按照设计规定的工程质量标准和技术要求，（ ）。",[197,199,201,203],{"key":20,"text":198,"correct":26},"进行整个车间负荷试运转发生的费用支出大于试运转收入的费用净支出",{"key":24,"text":200,"correct":22},"进行整个车间负荷试运转发生的费用支出总额",{"key":28,"text":202,"correct":22},"包括单台设备的调试费",{"key":31,"text":204,"correct":22},"包括工器具及生产家具购置费用",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":28,"analysis":33},1138583,"办公和生活家具购置费按照设计定员人数乘以（ ）计算。",[209,211,213,215],{"key":20,"text":210,"correct":22},"单项指标",{"key":24,"text":212,"correct":22},"差旅交通费",{"key":28,"text":214,"correct":26},"综合指标",{"key":31,"text":216,"correct":22},"职工福利费",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":31,"analysis":33},1138584,"取得国有土地使用费不包括（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"拆迁补偿与临时安置补助费",{"key":24,"text":224,"correct":22},"土地使用权出让金",{"key":28,"text":226,"correct":22},"城市建设配套费",{"key":31,"text":228,"correct":26},"土地投资补偿费",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1138585,"生产单位提前进厂参加施工、设备安装、调试等人员的工资、工资性补贴、劳动保护费等应计入（ ）。",[233,235,236,238],{"key":20,"text":234,"correct":22},"联合试运转费",{"key":24,"text":167,"correct":26},{"key":28,"text":237,"correct":22},"基本预备费",{"key":31,"text":154,"correct":22},{"id":240,"libraryId":5,"type":82,"typeLabel":83,"stem":241,"options":242,"answer":253,"analysis":33},1138586,"工程保险费是指建设工程在建设期间根据需要，实施工程保险部分所需费用，包括（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":26},"建筑工程一切险",{"key":24,"text":246,"correct":22},"财务保险",{"key":28,"text":248,"correct":26},"人身意外伤害保险",{"key":31,"text":250,"correct":26},"安装工程一切险",{"key":95,"text":252,"correct":22},"机器损坏保险","ACD",{"id":255,"libraryId":5,"type":82,"typeLabel":83,"stem":256,"options":257,"answer":97,"analysis":33},1138587,"建设工程项目总投资组成中，工程建设其他费包括（ ）。",[258,260,261,262,264],{"key":20,"text":259,"correct":22},"失业保险费",{"key":24,"text":131,"correct":26},{"key":28,"text":170,"correct":26},{"key":31,"text":263,"correct":26},"生活家具购置费",{"key":95,"text":265,"correct":22},"生产家具购置费",{"id":267,"libraryId":5,"type":82,"typeLabel":83,"stem":268,"options":269,"answer":279,"analysis":33},1138588,"下列费用中，应计入建设工程项目投资中“生产准备费”的有（ ）。",[270,272,274,276,277],{"key":20,"text":271,"correct":26},"生产职工培训费",{"key":24,"text":273,"correct":22},"购买原材料、能源的费用",{"key":28,"text":275,"correct":22},"办公家具购置费",{"key":31,"text":234,"correct":22},{"key":95,"text":278,"correct":26},"提前进厂人员的工资、福利等费用","AE",{"id":281,"libraryId":5,"type":82,"typeLabel":83,"stem":282,"options":283,"answer":292,"analysis":33},1138589,"建设项目投资组成中，建设管理费包括（ ）。",[284,286,287,289,291],{"key":20,"text":285,"correct":22},"工程勘察费",{"key":24,"text":131,"correct":26},{"key":28,"text":288,"correct":22},"工程设计费",{"key":31,"text":290,"correct":22},"施工管理费",{"key":95,"text":154,"correct":26},"BE",{"id":294,"libraryId":5,"type":82,"typeLabel":83,"stem":295,"options":296,"answer":302,"analysis":33},1138590,"下列工程建设投资中，属于与未来生产经营有关的其他费用的有（ ）。",[297,298,299,300,301],{"key":20,"text":234,"correct":26},{"key":24,"text":154,"correct":22},{"key":28,"text":275,"correct":26},{"key":31,"text":263,"correct":26},{"key":95,"text":271,"correct":26},"ACDE",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1138591,"业主为验证桥梁的安全性，要求承包商对模拟桥梁进行破损性试验发生的费用属于（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":26},"业主方的研究试验费",{"key":24,"text":310,"correct":22},"业主方的建设单位管理费",{"key":28,"text":312,"correct":22},"业主方的勘察设计费",{"key":31,"text":314,"correct":22},"承包方的检验试验费",{"id":316,"libraryId":5,"type":82,"typeLabel":83,"stem":317,"options":318,"answer":329,"analysis":33},1138592,"(2014真题)根据《建筑安装工程费用项目组成》（建标[2013]44号），下列费用中，属于规费的有()。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"工程排污费",{"key":24,"text":322,"correct":22},"安全施工费",{"key":28,"text":324,"correct":22},"环境保护费",{"key":31,"text":326,"correct":26},"住房公积金",{"key":95,"text":328,"correct":22},"劳动保护费","AD",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},1138593,"(2014真题)关于联合试运转费的说法，正确的是()。",[334,336,338,340],{"key":20,"text":335,"correct":22},"联合试运转费包括单机的调试费",{"key":24,"text":337,"correct":22},"联合试运转费包括单机安装后试运转中因施工质量原因发生的处理费用",{"key":28,"text":339,"correct":26},"联合试运转费应为联合试运转所发生的费用净支出",{"key":31,"text":341,"correct":22},"联合试运转支出主要是材料费，不包含人工费",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},1138596,"编制某企业改扩建项目的投资估算时，生产准备费的计算基数应为（ ）。 2016",[346,348,350,352],{"key":20,"text":347,"correct":22},"新增建筑安装工程费用",{"key":24,"text":349,"correct":22},"原有设计定员",{"key":28,"text":351,"correct":26},"新增设计定员",{"key":31,"text":353,"correct":22},"全部设计定员",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1138598,"为预测和分析建设项目存在的职业危险、危害因素种类及危害程度，并提出合理应对措施而产生的费用属于（ ）。( 2015真题 )",[358,360,361,362],{"key":20,"text":359,"correct":22},"安全文明施工费",{"key":24,"text":154,"correct":22},{"key":28,"text":167,"correct":22},{"key":31,"text":192,"correct":26},{"id":364,"libraryId":5,"type":82,"typeLabel":83,"stem":365,"options":366,"answer":377,"analysis":33},1138599,"下列建设工程投资费用中，属于工程建设其他费用中的场地准备及临时设施费有（ ）。( 2015真题 )",[367,369,371,373,375],{"key":20,"text":368,"correct":22},"施工单位场地平整费",{"key":24,"text":370,"correct":26},"建设单位临时设施费",{"key":28,"text":372,"correct":22},"环境影响评价费",{"key":31,"text":374,"correct":26},"遗留设施拆除清理费",{"key":95,"text":376,"correct":22},"施工单位临时设施费","BD",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1138601,"（2019年真题）某建设项目的程费用为1500万元，工程建设其他费用为200万元，场地准备和临时设施费用的5%计算，预计项目完工后拆除工程产生的清理费用为20万元，拆除工程可收回材料作价5万元。则该项目的场地准备和临时设施费为(（2019年真题）)万元。",[382,384,386,388],{"key":20,"text":383,"correct":22},"70",{"key":24,"text":385,"correct":26},"90",{"key":28,"text":387,"correct":22},"75",{"key":31,"text":389,"correct":22},"100",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1138603,"某建设工程项目在建设初期估算的建筑安装工程费1 000万元、设备及工器具购置费为4 000万元，工程其他费为300万元，基本预备费率为10％，则该项目的基本预备费估算是 （ ）万元。",[394,396,398,400],{"key":20,"text":395,"correct":22},"500",{"key":24,"text":397,"correct":26},"530",{"key":28,"text":399,"correct":22},"430",{"key":31,"text":401,"correct":22},"130",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1138604,"某建设工程项目的设备及工器具购置费为2500万元，建筑安装工程费为2000万元，工程建设其他费为1500万元，基本预备费率为10%，则该项目的基本预备费为（ ）万元。",[406,408,410,412],{"key":20,"text":407,"correct":22},"200",{"key":24,"text":409,"correct":22},"400",{"key":28,"text":411,"correct":26},"600",{"key":31,"text":413,"correct":22},"450",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1138605,"某建设项目期初估算的建筑安装工程费和设备工器具购置费为1500万元，建设期为2年，第2年计划完成估算投资的40%，建设期内年平均价格上涨率为3%，则第2年的涨价预备费为（ ）万元。",[418,420,422,424],{"key":20,"text":419,"correct":22},"18.00",{"key":24,"text":421,"correct":26},"36.54",{"key":28,"text":423,"correct":22},"63.54",{"key":31,"text":425,"correct":22},"636.54",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1138606,"某建设项目设备及工器具购置费为600万元，建筑安装工程费为1200万元，工程建设其他费为100万元，建设期两年，建设期内预计年平均价格总水平上涨率为5%，则该项目的涨价预备费的计算基数应为（ ）万元。",[430,432,434,436],{"key":20,"text":431,"correct":22},"1900",{"key":24,"text":433,"correct":22},"1200",{"key":28,"text":435,"correct":22},"700",{"key":31,"text":437,"correct":26},"1800",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1138607,"某建设项目设备及工器具购置费为600万元，建筑安装工程费为1200万元，工程建设其他费为100万元，建设期贷款利息为20万元，基本预备费率为10%，则该项目基本预备费为（ ）万元。",[442,444,446,448],{"key":20,"text":443,"correct":26},"190",{"key":24,"text":445,"correct":22},"182",{"key":28,"text":447,"correct":22},"180",{"key":31,"text":449,"correct":22},"120",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1138608,"某建设项目实施到第2年时，由于规范变化导致某分项目工程量增加，因此增加的费用应从建设投资中的（ ）支出。",[454,455,457,459],{"key":20,"text":237,"correct":26},{"key":24,"text":456,"correct":22},"涨价预备费",{"key":28,"text":458,"correct":22},"建设期利息",{"key":31,"text":460,"correct":22},"工程建设其他费用",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1138609,"涨价预备费是以（ ）为计算基数的。",[465,467,468,470],{"key":20,"text":466,"correct":22},"设备工器具购置费、建筑安装工程费和工程建设其他费之和",{"key":24,"text":237,"correct":22},{"key":28,"text":469,"correct":22},"投资总额",{"key":31,"text":471,"correct":26},"建筑安装工程费、设备工器具购置费之和",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1138610,"某项目的设备及工器具购置费2000万元，建筑安装工程费800万元，工程建设其他费200万元，基本预备费费率5%，则该项目的基本预备费为（ ）万元。",[476,477,479,481],{"key":20,"text":389,"correct":22},{"key":24,"text":478,"correct":22},"110",{"key":28,"text":480,"correct":22},"140",{"key":31,"text":482,"correct":26},"150",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":28,"analysis":33},1138611,"编制建设项目投资估算时，考虑项目在实施中可能会发生涉及变更增加工程量，投资计划中需要事先预留的费用是（ ）。",[487,488,490,491],{"key":20,"text":456,"correct":22},{"key":24,"text":489,"correct":22},"铺底流动资金",{"key":28,"text":237,"correct":26},{"key":31,"text":460,"correct":22},{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":31,"analysis":33},1138612,"某工程的设备及工器具购置费为1000万元，建筑安装工程费为1300万元，工程建设其他费为600万元，基本预备费率为5％。该项目的基本预备费为（ ）万元。",[496,498,500,502],{"key":20,"text":497,"correct":22},"80",{"key":24,"text":499,"correct":22},"95",{"key":28,"text":501,"correct":22},"115",{"key":31,"text":503,"correct":26},"145",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":28,"analysis":33},1138613,"某建设工程项目在建设初期估算的建筑安装工程费、设备及工器具购置费为5000万元，按照项目进度计划，建设期为2年，第1年投资2000万元，第2年投资3000万元，预计建设期内价格总水平上涨率为每年5%，则该项目的涨价预备费估算是（ ）万元。",[508,510,512,514],{"key":20,"text":509,"correct":22},"250.00",{"key":24,"text":511,"correct":22},"307.50",{"key":28,"text":513,"correct":26},"407.50",{"key":31,"text":515,"correct":22},"512.50",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":24,"analysis":33},1138614,"(2014真题)施工企业按照规定标准对采购的建筑材料进行一般性鉴定、检查发生的费用应计入()。",[520,522,524,526],{"key":20,"text":521,"correct":22},"材料费",{"key":24,"text":523,"correct":26},"企业管理费",{"key":28,"text":525,"correct":22},"人工费",{"key":31,"text":527,"correct":22},"措施项目费",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1138616,"某建设工程项目建筑安装工程费为2000万元，设备及工器具购置费为800万元，工程建设其他费为300万元，基本预备费率为8%，该项目的基本预备费为（ ）万元。",[532,534,536,538],{"key":20,"text":533,"correct":26},"248",{"key":24,"text":535,"correct":22},"160",{"key":28,"text":537,"correct":22},"184",{"key":31,"text":539,"correct":22},"224",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":20,"analysis":33},1138617,"某工程投资中，设备购置费、建筑安装工程费和工程建设其他费用分别为600万元、1000万元和400万元，基本预备费率为10%，投资建设期2年，各年投资额相等。预计年均投资价格上涨5%，则该工程的涨价预备费为（ ）万元。",[544,546,548,550],{"key":20,"text":545,"correct":26},"167.75",{"key":24,"text":547,"correct":22},"152.50",{"key":28,"text":549,"correct":22},"122.00",{"key":31,"text":551,"correct":22},"52.50",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1138618,"某拟建项目的建筑安装工程费为1100万元，设备及工（器）具购置费为600万元，工程建设其他费为300万元，则该项目涨价预备费的计算基数为（）万元。",[556,558,560,562],{"key":20,"text":557,"correct":22},"1400",{"key":24,"text":559,"correct":22},"1700",{"key":28,"text":561,"correct":22},"1300",{"key":31,"text":563,"correct":26},"2000",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1138620,"某投资项目建设期为4年，并且第一年贷款100万元，第二年贷款200万元，第三年贷款100万元，第四年贷款50万元，贷款年利率为10%，用复利法计息建设期第二年的贷款利息应为（ ）万元。",[568,570,572,574],{"key":20,"text":569,"correct":22},"50",{"key":24,"text":571,"correct":26},"20.5",{"key":28,"text":573,"correct":22},"25.5",{"key":31,"text":575,"correct":22},"11",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1138621,"在建设工程投资估算中，建设期贷款利息按（ ）×年利率计算。",[580,582,584,586],{"key":20,"text":581,"correct":22},"年初借款本息累计+本年借款额",{"key":24,"text":583,"correct":26},"年初借款本息累计+本年借款额\u002F2",{"key":28,"text":585,"correct":22},"年初借款本息累计—本年借款额",{"key":31,"text":587,"correct":22},"年初借款本患累计一本年借款额\u002F2",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},1138622,"编制某工程项目投资估算时，项目建设期2年，第一年贷款800万元，第二年贷款600万元，贷款年利率10%，则该项目建设期利息总和为（ ）万元。",[592,594,596,597],{"key":20,"text":593,"correct":26},"154",{"key":24,"text":595,"correct":22},"114",{"key":28,"text":480,"correct":22},{"key":31,"text":598,"correct":22},"144",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":28,"analysis":33},1138623,"某建设工程项目的建设期为2年，第一年贷款600万元，第二年贷款800万元，贷款年利率10%，按年复利计息，则该项目建设期利息综合为（ ）万元。",[603,605,606,608],{"key":20,"text":604,"correct":22},"103",{"key":24,"text":480,"correct":22},{"key":28,"text":607,"correct":26},"133",{"key":31,"text":407,"correct":22},{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":28,"analysis":33},1138624,"某建设项目，建设期为两年，其向银行贷款1000万元，贷款时间和额度为第一年400万元，第二年600万元，贷款年利率6%，建设期不支付利息，则编制该项目投资结算时，建设期利息为（ ）万元。",[613,615,617,619],{"key":20,"text":614,"correct":22},"12.00",{"key":24,"text":616,"correct":22},"120.00",{"key":28,"text":618,"correct":26},"54.72",{"key":31,"text":620,"correct":22},"42.72",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]