[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":642},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,18,50,2696,[13,34,46,58,70,82,94,112,127,142,154,166,178,188,200,212,224,236,247,261,276,287,298,310,322,334,344,356,367,379,393,404,414,425,440,449,461,473,485,497,509,520,535,550,565,579,594,606,618,630],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1138380,1,"单选题","（2019年真题）在进行施工作业时间研究时，下列方法中，属于计时测定方法的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","图纸分析法",false,{"key":24,"text":25,"correct":22},"B","比较类推法",{"key":27,"text":28,"correct":29},"C","写实记录法",true,{"key":31,"text":32,"correct":22},"D","经验估计法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1138382,"施工定额是从事某项工作的基础，这项工作是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工企业计划管理",{"key":24,"text":41,"correct":29},"施工企业管理工作",{"key":27,"text":43,"correct":22},"计算工人劳动报酬",{"key":31,"text":45,"correct":22},"组织施工生产",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1138383,"编制和应用施工定额之所以有利于推广先进技术是因为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工定额是强制实施的",{"key":24,"text":53,"correct":22},"施工定额是工程定额体系的基础",{"key":27,"text":55,"correct":29},"施工定额水平本身包含成熟先进的施工技术",{"key":31,"text":57,"correct":22},"施工定额是用先进的技术方法测定出来的",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1138384,"关于企业定额作用的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"企业定额是编制施工组织设计的依据",{"key":24,"text":65,"correct":22},"企业定额能反应在不同项目上的最高管理水平",{"key":27,"text":67,"correct":22},"依据企业定额可以计算出施工企业完成投标工程的实际成本",{"key":31,"text":69,"correct":22},"企业定额不能直接反映出本企业的施工技术水平",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1138385,"在编制企业定额时，一般情况下，人工价格按（ ）计算确定。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工定额",{"key":24,"text":77,"correct":29},"地区劳务市场价格",{"key":27,"text":79,"correct":22},"企业平均工资水平",{"key":31,"text":81,"correct":22},"当地平均工资水平",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1138386,"在施工定额的主要作用中，不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"是企业计划管理的依据",{"key":24,"text":89,"correct":22},"是组织和指挥施工生产的有效工具",{"key":27,"text":91,"correct":22},"有利于推广先进技术",{"key":31,"text":93,"correct":29},"计算与确定建筑工程预算以及施工企业和建设单位结算工程价款的依据",{"id":95,"libraryId":5,"type":96,"typeLabel":97,"stem":98,"options":99,"answer":111,"analysis":33},1138387,2,"多选题","关于施工定额作用的说法，正确的有（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":29},"施工定额是企业编制施工组织设计的依据",{"key":24,"text":103,"correct":29},"施工定额是计算工人计件工资的基础",{"key":27,"text":105,"correct":29},"施工定额是编制施工预算的基础",{"key":31,"text":107,"correct":29},"施工定额是组织和指挥施工生产的有效工具",{"key":109,"text":110,"correct":22},"E","施工定额是编制竣工结算的依据","ABCD",{"id":113,"libraryId":5,"type":96,"typeLabel":97,"stem":114,"options":115,"answer":126,"analysis":33},1138388,"企业定额的作用是（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"企业定额是施工企业计算和确定工程施工成本的依据，是施工企业进行成本管理、经济核算的基础",{"key":24,"text":119,"correct":29},"企业定额是施工企业进行工程投标，编制工程投标价格的基础和主要依据",{"key":27,"text":121,"correct":29},"企业定额是施工企业编制施工组织设计的依据",{"key":31,"text":123,"correct":22},"企业定额是计算工作劳动报酬的依据",{"key":109,"text":125,"correct":22},"企业定额有利于推广先进技术","ABC",{"id":128,"libraryId":5,"type":96,"typeLabel":97,"stem":129,"options":130,"answer":141,"analysis":33},1138389,"施工定额的编制原则为（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"动态管理的原则",{"key":24,"text":134,"correct":29},"平均先进的原则",{"key":27,"text":136,"correct":22},"量价分离的原则",{"key":31,"text":138,"correct":29},"简明适用的原则",{"key":109,"text":140,"correct":22},"独立自主编制的原则","BD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1138390,"(2014真题)完成某预算定额项目单位工程量的基本用工为2.8工日，辅助用工为0.7工日，超运距用工为0.9工日，人工幅度差系数为10%，该定额的人工工日消耗量为()工日。",[146,148,150,152],{"key":20,"text":147,"correct":29},"4.84",{"key":24,"text":149,"correct":22},"4.75",{"key":27,"text":151,"correct":22},"4.56",{"key":31,"text":153,"correct":22},"4.68",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1138391,"(2014真题)预算定额作为一项综合性定额，是由组成()的消耗量综合而成的。",[158,160,162,164],{"key":20,"text":159,"correct":22},"分部工程的各分项工程",{"key":24,"text":161,"correct":22},"单位工程的各分部工程",{"key":27,"text":163,"correct":29},"分项工程的各工序",{"key":31,"text":165,"correct":22},"分项工程的各检验批",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1138392,"在合理的劳动组织和正常的施工条件下，完成某单位合格分项工程的时间消耗为所有班组完成时间均不超过1个工日，其中个别班组可以在0.50工日完成，多数班组经过努力可以在0.80工日完成。则编制施工定额时，人工消耗宜为（）工日。2018真题",[170,172,174,176],{"key":20,"text":171,"correct":22},"1.00",{"key":24,"text":173,"correct":29},"0.80",{"key":27,"text":175,"correct":22},"0.77",{"key":31,"text":177,"correct":22},"0.50",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1138395,"建筑安装工程材料损耗率一般采用（ ）计算确定。",[182,184,185,187],{"key":20,"text":183,"correct":22},"技术测定法",{"key":24,"text":25,"correct":22},{"key":27,"text":186,"correct":29},"观察法",{"key":31,"text":32,"correct":22},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":31,"analysis":33},1138396,"测定材料消耗定额时，定额中的损耗量是指操作过程中不可避免的废料和损耗，以及不可避免的（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"保管过程中的损耗",{"key":24,"text":195,"correct":22},"施工现场内运输损耗和场外运输损耗",{"key":27,"text":197,"correct":22},"采购过程中的计量误差",{"key":31,"text":199,"correct":29},"施工现场内运输损耗",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":24,"analysis":33},1138397,"材料消耗定额中不可避免的损耗一般以损耗率表示，公式为（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"损耗率=损耗量\u002F材料消耗定额×100%",{"key":24,"text":207,"correct":29},"损耗率=损耗量\u002F净用量×100%",{"key":27,"text":209,"correct":22},"损耗率=损耗量\u002F（净用量+损耗量）×100%",{"key":31,"text":211,"correct":22},"损耗率=损耗量\u002F（净用量-损耗量）×100%",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},1138398,"某混凝土结构施工采用木模板。木模板一次净用量为200m2 ，模板现场制作安装不可避免的损耗率为3%，模板可周转使用5次，每次补损率为5%，该模板周转使用量为（ ）m2 。",[216,218,220,222],{"key":20,"text":217,"correct":22},"41.2",{"key":24,"text":219,"correct":29},"49.44",{"key":27,"text":221,"correct":22},"43.20",{"key":31,"text":223,"correct":22},"51.50",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":24,"analysis":33},1138399,"施工企业成本核算或投标报价时，周转性材料消耗量指标应根据（ ）来确定。",[228,230,232,234],{"key":20,"text":229,"correct":22},"第二次使用时需要的补充量",{"key":24,"text":231,"correct":29},"摊销量",{"key":27,"text":233,"correct":22},"最终回收量",{"key":31,"text":235,"correct":22},"一次使用量",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},1138400,"某项工程需要某种材料的净耗量是0.95t，损耗率是5 %，那么该项工程对这种材料的总消耗量是（ ）。",[240,242,244,245],{"key":20,"text":241,"correct":22},"0.98",{"key":24,"text":243,"correct":29},"0.9975",{"key":27,"text":171,"correct":22},{"key":31,"text":246,"correct":22},"1.03",{"id":248,"libraryId":5,"type":96,"typeLabel":97,"stem":249,"options":250,"answer":260,"analysis":33},1138401,"材料损耗率可以通过（ ）计算确定。",[251,252,254,256,258],{"key":20,"text":186,"correct":29},{"key":24,"text":253,"correct":22},"测定法",{"key":27,"text":255,"correct":22},"经验法",{"key":31,"text":257,"correct":22},"综合法",{"key":109,"text":259,"correct":29},"统计法","AE",{"id":262,"libraryId":5,"type":96,"typeLabel":97,"stem":263,"options":264,"answer":275,"analysis":33},1138402,"材料消耗定额指标按其使用性质、用途和用量大小划分为（ ）。",[265,267,269,271,273],{"key":20,"text":266,"correct":29},"周转性材料",{"key":24,"text":268,"correct":29},"主要材料",{"key":27,"text":270,"correct":22},"库存材料",{"key":31,"text":272,"correct":29},"辅助材料",{"key":109,"text":274,"correct":29},"零星材料","ABDE",{"id":277,"libraryId":5,"type":96,"typeLabel":97,"stem":278,"options":279,"answer":275,"analysis":33},1138403,"编制材料消耗定额时，材料净用量的确定方法有（ ）。",[280,282,284,285,286],{"key":20,"text":281,"correct":29},"理论计算法",{"key":24,"text":283,"correct":29},"图纸计算法",{"key":27,"text":25,"correct":22},{"key":31,"text":253,"correct":29},{"key":109,"text":255,"correct":29},{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":31,"analysis":33},1138404,"(2016)",[291,293,294,296],{"key":20,"text":292,"correct":22},"48.00",{"key":24,"text":219,"correct":22},{"key":27,"text":295,"correct":22},"51.00",{"key":31,"text":297,"correct":29},"48.96",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1138405,"已知标准砖的尺寸为240mm×115mm×53mm，灰缝为10mm，则砌1m3半砖墙标准砖的用砖量为（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"385块",{"key":24,"text":305,"correct":22},"527.1块",{"key":27,"text":307,"correct":29},"529.1块",{"key":31,"text":309,"correct":22},"1017.5块",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1138406,"(2014真题)在机械工作时间消耗分类中，由于人工装料数量不足引起的机械不能满负荷工作的时间属于()。",[314,316,318,320],{"key":20,"text":315,"correct":22},"有根据地降低负荷下的工作时间",{"key":24,"text":317,"correct":22},"机械的多余工作时间",{"key":27,"text":319,"correct":22},"正常负荷下的有效工作时间",{"key":31,"text":321,"correct":29},"低负荷下的工作时间",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1138409,"一台混凝土搅拌机的纯工作正常生产率是2t\u002Fh，其工作班延续时间8h，机械正常利用系数为0.8，则施工机械时间定额为（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"0.0417",{"key":24,"text":329,"correct":29},"0.0781",{"key":27,"text":331,"correct":22},"0.1042",{"key":31,"text":333,"correct":22},"0.0625",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1138410,"某机械台班产量为4m3，与之配合的工人小组由5人组成，则单位产品的人工时间定额为（ ）工日。",[338,339,340,342],{"key":20,"text":177,"correct":22},{"key":24,"text":173,"correct":22},{"key":27,"text":341,"correct":22},"1.20",{"key":31,"text":343,"correct":29},"1.25",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},1138411,"施工作业过程中，筑路机在工作区末端调头消耗的时间应计入施工机械台班使用定额，其时间消耗的性质是（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"不可避免的停工时间",{"key":24,"text":351,"correct":22},"不可避免的中断工作时间",{"key":27,"text":353,"correct":29},"不可避免的无负荷工作时间",{"key":31,"text":355,"correct":22},"正常负荷下的工作时间",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},1138412,"施工机械工作时间不包括（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"有效工作时间",{"key":24,"text":363,"correct":29},"可避免的无负荷工作时间",{"key":27,"text":365,"correct":22},"不可避免的中断时间",{"key":31,"text":355,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},1138413,"某施工机械的时间定额为0.391台班\u002F100立方米，与之配合的工人小组由4人，则该机械的产量定额为（ ）立方米\u002F台班。",[371,373,375,377],{"key":20,"text":372,"correct":22},"2.56",{"key":24,"text":374,"correct":29},"256",{"key":27,"text":376,"correct":22},"0.64",{"key":31,"text":378,"correct":22},"64",{"id":380,"libraryId":5,"type":96,"typeLabel":97,"stem":381,"options":382,"answer":392,"analysis":33},1138414,"编制施工机械台班使用定额时，属于机械工作实践中损失时间的有（ ）。",[383,385,387,389,391],{"key":20,"text":384,"correct":29},"施工本身原因造成的停工时间",{"key":24,"text":386,"correct":29},"非施工原因造成的停工时间",{"key":27,"text":388,"correct":29},"违反劳动纪律引起的时间损失",{"key":31,"text":390,"correct":22},"工人正常的休息时间",{"key":109,"text":321,"correct":29},"ABCE",{"id":394,"libraryId":5,"type":96,"typeLabel":97,"stem":395,"options":396,"answer":126,"analysis":33},1138415,"编制机械台班使用定额时，机械工作必需消耗的时间包括（ ）。",[397,398,399,400,402],{"key":20,"text":365,"correct":29},{"key":24,"text":353,"correct":29},{"key":27,"text":361,"correct":29},{"key":31,"text":401,"correct":22},"低负荷下工作时间",{"key":109,"text":403,"correct":22},"由于违背劳动纪律引起的中断时间",{"id":405,"libraryId":5,"type":96,"typeLabel":97,"stem":406,"options":407,"answer":392,"analysis":33},1138416,"在合理劳动组织与合理使用机械的条件下，完成单位合格产品所必需的机械工作时间包括（ ）。",[408,409,410,411,413],{"key":20,"text":355,"correct":29},{"key":24,"text":365,"correct":29},{"key":27,"text":315,"correct":29},{"key":31,"text":412,"correct":22},"施工过程中操作工人违反劳动纪律的停工时间",{"key":109,"text":353,"correct":29},{"id":415,"libraryId":5,"type":96,"typeLabel":97,"stem":416,"options":417,"answer":424,"analysis":33},1138417,"机械工作时间的消耗，按其性质可分为必须消耗的时间和损失时间，其中必须消耗的时间包括（ ）。",[418,420,421,422,423],{"key":20,"text":419,"correct":22},"停工时间",{"key":24,"text":361,"correct":29},{"key":27,"text":321,"correct":22},{"key":31,"text":353,"correct":29},{"key":109,"text":365,"correct":29},"BDE",{"id":426,"libraryId":5,"type":96,"typeLabel":97,"stem":427,"options":428,"answer":439,"analysis":33},1138418,"(2014真题)编制预算定额人工消费指标时，下列人工消耗量属于人工幅度差用工的有()。",[429,431,433,435,437],{"key":20,"text":430,"correct":29},"施工过程中水电维修用工",{"key":24,"text":432,"correct":29},"隐蔽工程验收影响的操作时间",{"key":27,"text":434,"correct":22},"现场材料水平搬运用工",{"key":31,"text":436,"correct":22},"现场材料加工用工",{"key":109,"text":438,"correct":22},"现场筛砂子增加的用工量","AB",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},1138420,"汽车运输重量轻而体积大的货物时，不能充分利用载重吨位因而不得不在低于其计算负荷下工作的时间应计入（ ）。 2016",[444,445,446,447],{"key":20,"text":355,"correct":22},{"key":24,"text":365,"correct":22},{"key":27,"text":315,"correct":29},{"key":31,"text":448,"correct":22},"损失的工作时间",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1138422,"下列机械工作时间消耗中，属于机械台班使用定额中不可避免的无负荷工作时间的是（ ）。( 2015真题 )",[453,455,457,459],{"key":20,"text":454,"correct":22},"汽车在运送土方时没有装满导致的延长时间",{"key":24,"text":456,"correct":29},"筑路机在工作区末端调头的时间",{"key":27,"text":458,"correct":22},"未及时供给机械燃料而导致的停工时间",{"key":31,"text":460,"correct":22},"暴雨时压路机被迫停工时间",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1138425,"机械幅度差是指在施工定额中未曾包括的，而机械在合理的施工组织条件下所必需的停歇时间，在编制预算定额时应予以考虑，下列不属于机械幅度差内容的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"施工机械转移工作面及配置机械互相影响损失的时间",{"key":24,"text":468,"correct":22},"在正常的施工情况下，机械施工中不可避免的工序间歇",{"key":27,"text":470,"correct":22},"检查工程质量影响机械操作的时间",{"key":31,"text":472,"correct":29},"机械不可避免的无负荷工作时间",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":20,"analysis":33},1138426,"某砖混结构墙体砌筑工程完成10m3砖墙需基本用工为26个工日，辅助用工为5个工日，超距离运砖需2个工日，人工幅度差系数为10%，则预算定额人工工日消耗量为（ ）工日／10m3。",[477,479,481,483],{"key":20,"text":478,"correct":29},"36.3",{"key":24,"text":480,"correct":22},"35.8",{"key":27,"text":482,"correct":22},"35.6",{"key":31,"text":484,"correct":22},"33.7",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},1138427,"编制预算定额人工消耗量时，人工幅度差用工是指人工定额中未包括的，而在一般正常施工情况下又不可避免的一些（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"返工用工",{"key":24,"text":492,"correct":22},"低效率用工",{"key":27,"text":494,"correct":22},"用工浪费",{"key":31,"text":496,"correct":29},"零星用工",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},1138428,"预算定额是以建筑物或构筑物（ ）为对象编制的定额。",[501,503,505,507],{"key":20,"text":502,"correct":22},"各个工序",{"key":24,"text":504,"correct":22},"单项工程",{"key":27,"text":506,"correct":29},"各个分部分项工程",{"key":31,"text":508,"correct":22},"单位工程",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},1138429,"在初步设计计算编制设计概算或技术设计阶段编制修正概算，确定建设工程项目投资额的依据是（ ）。",[513,514,516,518],{"key":20,"text":75,"correct":22},{"key":24,"text":515,"correct":29},"概算定额",{"key":27,"text":517,"correct":22},"概算指标",{"key":31,"text":519,"correct":22},"投资估算指标",{"id":521,"libraryId":5,"type":96,"typeLabel":97,"stem":522,"options":523,"answer":534,"analysis":33},1138430,"概算指标的组成内容为（ ）。",[524,526,528,530,532],{"key":20,"text":525,"correct":29},"文字说明",{"key":24,"text":527,"correct":22},"编制范围",{"key":27,"text":529,"correct":22},"编制依据",{"key":31,"text":531,"correct":29},"指标列表",{"key":109,"text":533,"correct":29},"附录","ADE",{"id":536,"libraryId":5,"type":96,"typeLabel":97,"stem":537,"options":538,"answer":549,"analysis":33},1138431,"下列设备安装工程概述计算式中，属于概算指标法的有（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":29},"设备安装费=设备原价×设备安装费率",{"key":24,"text":542,"correct":22},"设备安装费=设备安装工程量×预算单价",{"key":27,"text":544,"correct":29},"设备安装费=设备吨数×每吨设备安装费",{"key":31,"text":546,"correct":29},"设备安装费=设备台数×每台设备安装费",{"key":109,"text":548,"correct":29},"设备安装费=建筑面积×单位面积安装费","ACDE",{"id":551,"libraryId":5,"type":96,"typeLabel":97,"stem":552,"options":553,"answer":564,"analysis":33},1138432,"关于概算定额的说法，正确的有（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":29},"概算定额是人工、材料、机械台班消耗量的数量标准",{"key":24,"text":557,"correct":29},"概算定额是在初步设计阶段确定投资额的依据",{"key":27,"text":559,"correct":22},"概算定额和预算定额的项目划分相同",{"key":31,"text":561,"correct":22},"概算定额是在概算指标的基础上综合而成的",{"key":109,"text":563,"correct":29},"概算定额水平的确定应与预算定额的水平基本一致","ABE",{"id":566,"libraryId":5,"type":96,"typeLabel":97,"stem":567,"options":568,"answer":439,"analysis":33},1138433,"单位估价表是由分部分项工程单位构成的单价表，属于其表现形式的是（ ）。",[569,571,573,575,577],{"key":20,"text":570,"correct":29},"工料单价",{"key":24,"text":572,"correct":29},"综合单价",{"key":27,"text":574,"correct":22},"人工单价",{"key":31,"text":576,"correct":22},"材料单价",{"key":109,"text":578,"correct":22},"企业单价",{"id":580,"libraryId":5,"type":96,"typeLabel":97,"stem":581,"options":582,"answer":593,"analysis":33},1138434,"概算定额是以扩大的分部分项工程为对象编制的，其作用主要有（ ）。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"是编制扩大初步设计的依据",{"key":24,"text":586,"correct":22},"用于施工管理",{"key":27,"text":588,"correct":29},"是确定建设项目投资额的依据",{"key":31,"text":590,"correct":29},"是编制概算指标的基础",{"key":109,"text":592,"correct":22},"是编制施工定额的基础","CD",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1138435,"(2014真题)关于设计概算的说法，错误的是()。",[598,600,602,604],{"key":20,"text":599,"correct":22},"设计概算是确定和控制建设工程项目全部投资的文件",{"key":24,"text":601,"correct":29},"编制设计概算不需考虑建设项目施工条件对投资的影响",{"key":27,"text":603,"correct":22},"如果设计概算值超过投资控制额，必须修改设计或重新立项审批",{"key":31,"text":605,"correct":22},"设计概算由项目设计单位负责编制，并对其编制质量负责",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":20,"analysis":33},1138439,"某工程的分项工程材料费占直接工程费的比例为75％，该地区原费用定额测算所选典型工程材料费占人、 料、 机费用合计的比例为60%， 根据综合单价法计价程序， 宜采用 （ ）为计算基础计算含税造价。",[610,612,614,616],{"key":20,"text":611,"correct":29},"直接工程费",{"key":24,"text":613,"correct":22},"人工费和机械费合计",{"key":27,"text":615,"correct":22},"人工费",{"key":31,"text":617,"correct":22},"材料费和机械费合计",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":24,"analysis":33},1138440,"国家计量规范规定不宜计量的措施项目费的通用计算方法是（ ）。 2016",[622,624,626,628],{"key":20,"text":623,"correct":22},"Σ（措施项目工程量×综合单价）",{"key":24,"text":625,"correct":29},"Σ（计算基数×相应费率）",{"key":27,"text":627,"correct":22},"Σ（直接工程费×相应费率）",{"key":31,"text":629,"correct":22},"Σ（措施项目项数×综合单价）",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":20,"analysis":33},1138441,"某建设项目建设期3年，生产经营期17年，建设投资5500万元，流动资金500万元，建设期第1年初贷款2000万元，年利率9%，贷款期限5年，每年复利息一次，到期一次还本付息，该项目的总投资为（ ）万元。",[634,636,638,640],{"key":20,"text":635,"correct":29},"6000",{"key":24,"text":637,"correct":22},"6540",{"key":27,"text":639,"correct":22},"6590",{"key":31,"text":641,"correct":22},"7077",[643,646,649,652,655,658],{"id":15,"name":644,"category":7,"favorite":645},"领导干部任职前廉政法规知识测试题",92,{"id":647,"name":648,"category":7,"favorite":15},595,"建筑结构与设备",{"id":650,"name":651,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":653,"name":654,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":656,"name":657,"category":7,"favorite":8},534,"BIM工程师",{"id":659,"name":657,"category":7,"favorite":8},535]