[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":590},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,17,50,2696,[13,34,52,64,76,88,100,112,124,139,151,163,175,187,199,209,221,233,241,253,265,279,293,302,310,318,330,338,348,360,368,377,389,401,413,425,433,441,453,461,469,481,495,506,520,532,547,558,568,576],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1138324,1,"单选题","对存货进行ABC分类的最基本标准是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","品种数量和金额标准",true,{"key":24,"text":25,"correct":26},"B","品种数量标准",false,{"key":28,"text":29,"correct":26},"C","金额标准",{"key":31,"text":32,"correct":26},"D","重量标准","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1138325,2,"多选题","下列各项中，属于“存货”的有（ ）。",[40,42,44,46,48],{"key":20,"text":41,"correct":22},"周转材料",{"key":24,"text":43,"correct":22},"低值易耗品",{"key":28,"text":45,"correct":26},"临时设施",{"key":31,"text":47,"correct":22},"施工产品",{"key":49,"text":50,"correct":22},"E","在建施工产品","ABDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":24,"analysis":33},1138326,"关于企业存货管理的说法，正确的是（ ）。 2016",[56,58,60,62],{"key":20,"text":57,"correct":26},"存货管理的目标是最大限度地降低存货成本",{"key":24,"text":59,"correct":22},"存货管理是要在存货成本与存货效益之间做出权衡，达到两者之间的最佳结合",{"key":28,"text":61,"correct":26},"财务部门存货管理的职责是选择供应单位及筹集订货资金",{"key":31,"text":63,"correct":26},"根据存货管理的ABC分析法，应对C类存货实施严格控制",{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":28,"analysis":33},1138328,"某施工企业生产所需甲材料，年度采购总量为200吨，每吨单价为1000元，一次订货成本为100元。每吨材料的年平均储备成本为400元。则该材料的经济采购批量为（ ）吨。( 2015真题 )",[68,70,72,74],{"key":20,"text":69,"correct":26},"6.32",{"key":24,"text":71,"correct":26},"7.07",{"key":28,"text":73,"correct":22},"10.00",{"key":31,"text":75,"correct":26},"100.00",{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":24,"analysis":33},1138330,"应收账款管理的目标是（ ）。",[80,82,84,86],{"key":20,"text":81,"correct":26},"扩大销售",{"key":24,"text":83,"correct":22},"求得利润",{"key":28,"text":85,"correct":26},"降低坏账",{"key":31,"text":87,"correct":26},"提高信用",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":24,"analysis":33},1138331,"企业应收账款管理中，可以通过“5C”系统对顾客的（ ）进行评估。",[92,94,96,98],{"key":20,"text":93,"correct":26},"资产状况",{"key":24,"text":95,"correct":22},"信用品质",{"key":28,"text":97,"correct":26},"偿债能力",{"key":31,"text":99,"correct":26},"盈利能力",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},1138332,"企业的应收账款增加将导致企业（ ）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"时段净资产减少",{"key":24,"text":107,"correct":26},"流动资产减少",{"key":28,"text":109,"correct":26},"总资产减少",{"key":31,"text":111,"correct":22},"坏账的风险增加",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":28,"analysis":33},1138333,"企业对某一客户的信用标准进行评估时，可以不考虑（ ）的内容。",[116,118,120,122],{"key":20,"text":117,"correct":26},"客户信誉",{"key":24,"text":119,"correct":26},"支付能力",{"key":28,"text":121,"correct":22},"员工素质",{"key":31,"text":123,"correct":26},"财务实力",{"id":125,"libraryId":5,"type":36,"typeLabel":37,"stem":126,"options":127,"answer":138,"analysis":33},1138334,"应收账款赊销的效果好坏，依赖于企业的信用政策。信用政策主要包括（ ）。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"现金折扣",{"key":24,"text":131,"correct":26},"信贷额度",{"key":28,"text":133,"correct":22},"信用标准",{"key":31,"text":135,"correct":26},"偿还条件",{"key":49,"text":137,"correct":22},"信用期限","ACE",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1138336,"以工序为编制对象的定额（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"施工定额",{"key":24,"text":146,"correct":26},"基础定额",{"key":28,"text":148,"correct":26},"概算定额",{"key":31,"text":150,"correct":26},"概算指标",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":20,"analysis":33},1138337,"建筑安装工程费用定额是按（ ）划分的。",[155,157,159,161],{"key":20,"text":156,"correct":22},"按照投资的费用性质",{"key":24,"text":158,"correct":26},"按照专业性质",{"key":28,"text":160,"correct":26},"按照主编单位和管理权限",{"key":31,"text":162,"correct":26},"按同一性质的施工过程",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":20,"analysis":33},1138338,"单台设备安装后的调试费属于（ ） 。",[167,169,171,173],{"key":20,"text":168,"correct":22},"安装工程费",{"key":24,"text":170,"correct":26},"建筑工程费",{"key":28,"text":172,"correct":26},"设备购置费",{"key":31,"text":174,"correct":26},"工程建设其他费",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":31,"analysis":33},1138339,"建设工程人工定额是在（ ）的施工条件下测定和计算的。",[179,181,183,185],{"key":20,"text":180,"correct":26},"最差",{"key":24,"text":182,"correct":26},"平均先进",{"key":28,"text":184,"correct":26},"先进",{"key":31,"text":186,"correct":22},"正常",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":24,"analysis":33},1138340,"预算定额是以（ ）为对象编制的。",[191,193,195,197],{"key":20,"text":192,"correct":26},"同一性质的施工过程--工序",{"key":24,"text":194,"correct":22},"建筑物或构筑物各个分部分项工程",{"key":28,"text":196,"correct":26},"扩大的部分分项工程",{"key":31,"text":198,"correct":26},"独立的单项程或完整的工程项目",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},1138341,"在建设工程项目可行性研究阶段，计算投资应依据的定额或指标是（ ）。",[203,205,207,208],{"key":20,"text":204,"correct":22},"投资估算指标",{"key":24,"text":206,"correct":26},"预算定额",{"key":28,"text":148,"correct":26},{"key":31,"text":150,"correct":26},{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},1138342,"预算定额是以建筑物或构筑物（ ）为编制对象编制的定额。",[213,215,217,219],{"key":20,"text":214,"correct":26},"各个工序",{"key":24,"text":216,"correct":26},"单项工程",{"key":28,"text":218,"correct":22},"各个分部分项工程",{"key":31,"text":220,"correct":26},"单位工程",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1138343,"材料消耗定额是在合理和节约使用材料的条件下，生产单位质量（ ）产品所必须消耗的一定规格的材料、成品、半成品和水、电等资源的数量标准。",[225,227,229,231],{"key":20,"text":226,"correct":26},"低劣",{"key":24,"text":228,"correct":22},"合格",{"key":28,"text":230,"correct":26},"高档",{"key":31,"text":232,"correct":26},"低档",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1138344,"（ ）是施工企业组织生产和加强管理在企业内部使用的一种定额，属于企业定额的性质。",[237,238,239,240],{"key":20,"text":144,"correct":22},{"key":24,"text":148,"correct":26},{"key":28,"text":150,"correct":26},{"key":31,"text":206,"correct":26},{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":20,"analysis":33},1138345,"全国统一定额是由（ ）综合全国工程建设中技术和施工组织管理的情况编制。",[245,247,249,251],{"key":20,"text":246,"correct":22},"国家建设行政主管部门",{"key":24,"text":248,"correct":26},"行业建设行政主管部门",{"key":28,"text":250,"correct":26},"地区建设行政主管部门",{"key":31,"text":252,"correct":26},"施工企业",{"id":254,"libraryId":5,"type":36,"typeLabel":37,"stem":255,"options":256,"answer":264,"analysis":33},1138346,"按照编制的程序和用途，可将建设工程定额分为（ ）等几种。",[257,259,260,261,263],{"key":20,"text":258,"correct":26},"人工定额",{"key":24,"text":144,"correct":22},{"key":28,"text":206,"correct":22},{"key":31,"text":262,"correct":26},"产量定额",{"key":49,"text":148,"correct":22},"BCE",{"id":266,"libraryId":5,"type":36,"typeLabel":37,"stem":267,"options":268,"answer":278,"analysis":33},1138347,"按照反映的生产要素消耗内容，可将建设工程定额分为（ ）。",[269,271,273,274,276],{"key":20,"text":270,"correct":26},"建筑工程定额",{"key":24,"text":272,"correct":26},"安装工程定额",{"key":28,"text":258,"correct":22},{"key":31,"text":275,"correct":22},"材料消耗定额",{"key":49,"text":277,"correct":22},"机械台班定额","CDE",{"id":280,"libraryId":5,"type":36,"typeLabel":37,"stem":281,"options":282,"answer":292,"analysis":33},1138348,"按照编制单位和适用范围，可将建设定额分为国家定额、行业定额和（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"地区定额",{"key":24,"text":286,"correct":26},"专业专用定额",{"key":28,"text":288,"correct":22},"企业定额",{"key":31,"text":290,"correct":26},"补充定额",{"key":49,"text":206,"correct":26},"AC",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1138349,"设计单位编制设计概算或建设单位编制年度投资计划的依据是（ ）。",[297,298,299,300],{"key":20,"text":206,"correct":26},{"key":24,"text":150,"correct":22},{"key":28,"text":148,"correct":26},{"key":31,"text":301,"correct":26},"估算指标",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1138350,"建设工程定额和指标中分项最细、定额和指标子目最多的是（ ） 。",[306,307,308,309],{"key":20,"text":206,"correct":26},{"key":24,"text":144,"correct":22},{"key":28,"text":148,"correct":26},{"key":31,"text":150,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1138351,"按照编制程序和用途，以建筑物或构筑物各个分部分项工程为对象编制的定额是（ ）。",[314,315,316,317],{"key":20,"text":204,"correct":26},{"key":24,"text":206,"correct":22},{"key":28,"text":144,"correct":26},{"key":31,"text":148,"correct":26},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},1138352,"建设工程施工定额的研究对象是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":26},"分部分项工程",{"key":24,"text":325,"correct":22},"工序",{"key":28,"text":327,"correct":26},"扩大的分部分项工程",{"key":31,"text":329,"correct":26},"整个建筑物",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},1138353,"施工定额研究的对象是（ ）。",[334,335,336,337],{"key":20,"text":325,"correct":22},{"key":24,"text":329,"correct":26},{"key":28,"text":327,"correct":26},{"key":31,"text":323,"correct":26},{"id":339,"libraryId":5,"type":36,"typeLabel":37,"stem":340,"options":341,"answer":347,"analysis":33},1138354,"建筑工程定额是建筑工程的（ ）的统称。",[342,343,344,345,346],{"key":20,"text":144,"correct":22},{"key":24,"text":206,"correct":22},{"key":28,"text":148,"correct":22},{"key":31,"text":258,"correct":26},{"key":49,"text":150,"correct":22},"ABCE",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1138355,"(2014真题)对于同类型产品规格多、工序复杂、工作量小的施工过程，若已有部分产品施工的人工定额，则其他同类型产品施工人工定额的制定适宜采用的方法是()。",[352,354,356,358],{"key":20,"text":353,"correct":22},"比较类推法",{"key":24,"text":355,"correct":26},"技术测定法",{"key":28,"text":357,"correct":26},"统计分析法",{"key":31,"text":359,"correct":26},"经验估计法",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":28,"analysis":33},1138356,"以建筑物或构筑物各个分部分项工程为对象编制的定额是（ ）。",[364,365,366,367],{"key":20,"text":144,"correct":26},{"key":24,"text":275,"correct":26},{"key":28,"text":206,"correct":22},{"key":31,"text":148,"correct":26},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1138358,"施工企业可以直接来用编制施工作业计划、签发施工任务单的定额是（ ）。 2016",[372,373,374,375],{"key":20,"text":206,"correct":26},{"key":24,"text":148,"correct":26},{"key":28,"text":144,"correct":22},{"key":31,"text":376,"correct":26},"工器具定额",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1138360,"已知某工人班组完成某单位产品所必须的工作时间为2.5个小时，则该产品的产量定额为（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"0.4",{"key":24,"text":384,"correct":26},"4",{"key":28,"text":386,"correct":26},"3.2",{"key":31,"text":388,"correct":26},"0.3125",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":28,"analysis":33},1138361,"根据计时观察法测得某工序工人工作时间：基本工作时间48min，辅助工作时间5min，准备与结束工作时间4min，休息时间3min，不可避免的中断时间2min，停工时间1min，则定额时间是（ ）min。",[393,395,397,399],{"key":20,"text":394,"correct":26},"56",{"key":24,"text":396,"correct":26},"60",{"key":28,"text":398,"correct":22},"62",{"key":31,"text":400,"correct":26},"63",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1138362,"某斗容量1m3正铲挖土机的机械台班产量为4.96（定额单位100m3），小组成员两人，则挖100m3土的人工时间定额为（ ）工日。",[405,407,409,411],{"key":20,"text":406,"correct":22},"0.40",{"key":24,"text":408,"correct":26},"0.20",{"key":28,"text":410,"correct":26},"2.48",{"key":31,"text":412,"correct":26},"4.96",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1138363,"编制人工定额时，工人在工作班内消耗的工作时间属于损失时间的是（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"停工时间",{"key":24,"text":420,"correct":26},"休息时间",{"key":28,"text":422,"correct":26},"准备与结束工作时间",{"key":31,"text":424,"correct":26},"不可避免中断时间",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},1138364,"（ ）简单易行，适用于施工条件正常、产品稳定、工序重复量大和统计工作制度健全的施工过程。",[429,430,431,432],{"key":20,"text":355,"correct":26},{"key":24,"text":357,"correct":22},{"key":28,"text":353,"correct":26},{"key":31,"text":359,"correct":26},{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":28,"analysis":33},1138365,"对于同类型产品规格多、工序重复、工作量小的施工过程，常用（ ）制定人工定额。",[437,438,439,440],{"key":20,"text":355,"correct":26},{"key":24,"text":357,"correct":26},{"key":28,"text":353,"correct":22},{"key":31,"text":359,"correct":26},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":28,"analysis":33},1138366,"不属于技术测定的方法的有（ ）等。",[445,447,449,451],{"key":20,"text":446,"correct":26},"写实记录法",{"key":24,"text":448,"correct":26},"测时法",{"key":28,"text":450,"correct":22},"背诵法",{"key":31,"text":452,"correct":26},"工作日写实法",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1138367,"在人工定额的编制过程中，对于同类型产品规格多、工序重复、工作量小的施工过程，适宜采用（ ）进行编制。",[457,458,459,460],{"key":20,"text":355,"correct":26},{"key":24,"text":357,"correct":26},{"key":28,"text":353,"correct":22},{"key":31,"text":359,"correct":26},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1138368,"根据生产技术和施工组织条件，对施工过程中各工序采用一定的方法测出其工时消耗等资料，再对所获得的资料进行分析，制订出人工定额的方法是（ ）。",[465,466,467,468],{"key":20,"text":357,"correct":26},{"key":24,"text":353,"correct":26},{"key":28,"text":359,"correct":26},{"key":31,"text":355,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1138369,"有关人工定额的计算方法，表达不正确的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":26},"单位产品时间定额（工日）=1\u002F每工产量",{"key":24,"text":476,"correct":22},"单位产品时间定额（工日）=机械台班产量\u002F小组成员工日数总和",{"key":28,"text":478,"correct":26},"时间定额=1\u002F产量定额",{"key":31,"text":480,"correct":26},"综合产量定额=1\u002F综合时间定额（工日）",{"id":482,"libraryId":5,"type":36,"typeLabel":37,"stem":483,"options":484,"answer":494,"analysis":33},1138370,"编制人工定额时，属于工人工作必需消耗的时间有（ ）。",[485,487,489,491,492],{"key":20,"text":486,"correct":26},"违背劳动纪律损失时间",{"key":24,"text":488,"correct":22},"基本工作时间",{"key":28,"text":490,"correct":22},"辅助工作时间",{"key":31,"text":422,"correct":22},{"key":49,"text":493,"correct":22},"不可避免的中断时间","BCDE",{"id":496,"libraryId":5,"type":36,"typeLabel":37,"stem":497,"options":498,"answer":51,"analysis":33},1138371,"在制订人工定额时，拟定施工作业定额时间是在拟定（ ）的基础上编制的。",[499,500,502,504,505],{"key":20,"text":488,"correct":22},{"key":24,"text":501,"correct":22},"辅助工作时问",{"key":28,"text":503,"correct":26},"超负荷下的工作时间",{"key":31,"text":420,"correct":22},{"key":49,"text":493,"correct":22},{"id":507,"libraryId":5,"type":36,"typeLabel":37,"stem":508,"options":509,"answer":278,"analysis":33},1138372,"编制人工定额时，工人工作必须消耗的时间包括（ ）。",[510,512,514,516,518],{"key":20,"text":511,"correct":26},"由于材料供应不及时引起的停工时间",{"key":24,"text":513,"correct":26},"工人擅自离开工作岗位造成的时间损失",{"key":28,"text":515,"correct":22},"准备工作时间",{"key":31,"text":517,"correct":22},"由于施工工艺特点引起的工作中断所必需的时间",{"key":49,"text":519,"correct":22},"工人下班前清洗整理工具的时间",{"id":521,"libraryId":5,"type":36,"typeLabel":37,"stem":522,"options":523,"answer":531,"analysis":33},1138373,"企业编制人工定额时要拟定施工作业的定额时间，应当包括在定额时间内的工人工作时间消耗有（ ）。",[524,525,527,528,529],{"key":20,"text":488,"correct":22},{"key":24,"text":526,"correct":26},"施工组织不善造成的停工时间",{"key":28,"text":490,"correct":22},{"key":31,"text":493,"correct":22},{"key":49,"text":530,"correct":22},"准备与结束的工作时间","ACDE",{"id":533,"libraryId":5,"type":36,"typeLabel":37,"stem":534,"options":535,"answer":546,"analysis":33},1138374,"人工定额中的定额时间不包括（ ）。",[536,538,540,542,544],{"key":20,"text":537,"correct":26},"工人下班前对搅拌机进行清洗的时间",{"key":24,"text":539,"correct":26},"工人由于施工工艺原因必需的中断时间",{"key":28,"text":541,"correct":22},"由于设计错误造成的工人窝工时间",{"key":31,"text":543,"correct":26},"工人必须的休息时间",{"key":49,"text":545,"correct":22},"由于施工机械故障造成的工人窝工时间","CE",{"id":548,"libraryId":5,"type":36,"typeLabel":37,"stem":549,"options":550,"answer":278,"analysis":33},1138376,"编制人工定额时，属于工人工作必需消耗的时间有（ ）。 2016",[551,553,555,556,557],{"key":20,"text":552,"correct":26},"多余和偶然工作时间",{"key":24,"text":554,"correct":26},"施工本身造成的停工时间",{"key":28,"text":493,"correct":22},{"key":31,"text":490,"correct":22},{"key":49,"text":422,"correct":22},{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},1138377,"编制人工定额时，基本工作结束后的整理劳动工具时间应计入（ ）。 2016",[562,563,564,566],{"key":20,"text":420,"correct":26},{"key":24,"text":493,"correct":26},{"key":28,"text":565,"correct":22},"有效工作时间",{"key":31,"text":567,"correct":26},"损失时间",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":28,"analysis":33},1138378,"某施工企业编制砌砖墙人工定额，该企业有近5年同类工程的施工工时消耗资料，则制定人工定额适合选用的方法是（ ）。( 2015真题 )",[572,573,574,575],{"key":20,"text":355,"correct":26},{"key":24,"text":353,"correct":26},{"key":28,"text":357,"correct":22},{"key":31,"text":359,"correct":26},{"id":577,"libraryId":5,"type":36,"typeLabel":37,"stem":578,"options":579,"answer":51,"analysis":33},1138379,"编制人工定额时需拟定施工的正常条件，其内容包括拟定（ ）。( 2015真题 )",[580,582,584,586,588],{"key":20,"text":581,"correct":22},"施工作业内容",{"key":24,"text":583,"correct":22},"施工作业方法",{"key":28,"text":585,"correct":26},"施工企业技术水平",{"key":31,"text":587,"correct":22},"施工作业地点组织",{"key":49,"text":589,"correct":22},"施工作业人员组织",[591,594,597,600,603,606],{"id":15,"name":592,"category":7,"favorite":593},"领导干部任职前廉政法规知识测试题",92,{"id":595,"name":596,"category":7,"favorite":15},595,"建筑结构与设备",{"id":598,"name":599,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":601,"name":602,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":604,"name":605,"category":7,"favorite":8},534,"BIM工程师",{"id":607,"name":605,"category":7,"favorite":8},535]