[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-798-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":627},{"id":5,"name":6,"category":7,"favorite":8},798,"一建建设工程经济","建筑工程",0,11,50,2696,[13,34,46,58,70,86,101,115,130,140,152,164,176,188,200,212,224,239,251,263,276,288,297,312,324,335,345,356,368,382,396,408,419,431,443,455,467,479,488,502,516,527,539,551,563,575,586,596,605,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1137971,1,"单选题","某机器设备原始价值14万元，预计净残值率5%，预计使用年限6年，用年数总和法计提折旧，第2年应计提的折旧额为（ ）万元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","3.33",false,{"key":24,"text":25,"correct":26},"B","3.167",true,{"key":28,"text":29,"correct":22},"C","2.664",{"key":31,"text":32,"correct":22},"D","2.532","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1137972,"企业应当将入账的无形资产在一定年限内摊销，其摊销金额计入（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"财务费用",{"key":24,"text":41,"correct":26},"管理费用",{"key":28,"text":43,"correct":22},"营业费用",{"key":31,"text":45,"correct":22},"营业外支出",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1137973,"按照会计准则规定，固定资产的原价扣除其预计净残值，再扣除已计提固定资产减值准备累计金额后的余额是固定资产的（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"年折旧额",{"key":24,"text":53,"correct":22},"净值",{"key":28,"text":55,"correct":26},"应计折旧额",{"key":31,"text":57,"correct":22},"折余价值",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1137975,"某施工企业购买一台新型挖土机械，价格为50万元，预计使用寿命为2000台班，预计净残值为购买价格的3%，若按工作量法折旧，该机械每工作台班折旧费应为（ ）元。",[62,64,66,68],{"key":20,"text":63,"correct":26},"242.50",{"key":24,"text":65,"correct":22},"237.50",{"key":28,"text":67,"correct":22},"250.00",{"key":31,"text":69,"correct":22},"257.70",{"id":71,"libraryId":5,"type":72,"typeLabel":73,"stem":74,"options":75,"answer":85,"analysis":33},1137976,2,"多选题","我国现行《企业会计准则》，收益性支出不包括（ ）。",[76,78,80,82,83],{"key":20,"text":77,"correct":22},"外购材料支出",{"key":24,"text":79,"correct":26},"非常损失",{"key":28,"text":81,"correct":26},"固定资产盘亏",{"key":31,"text":41,"correct":22},{"key":84,"text":43,"correct":22},"E","BC",{"id":87,"libraryId":5,"type":72,"typeLabel":73,"stem":88,"options":89,"answer":100,"analysis":33},1137977,"影响固定资产折旧的因素有（ ）。",[90,92,94,96,98],{"key":20,"text":91,"correct":22},"折旧计算方法",{"key":24,"text":93,"correct":26},"固定资产原价",{"key":28,"text":95,"correct":22},"累计减值准备",{"key":31,"text":97,"correct":26},"预计净残值",{"key":84,"text":99,"correct":26},"固定资产使用寿命","BDE",{"id":102,"libraryId":5,"type":72,"typeLabel":73,"stem":103,"options":104,"answer":114,"analysis":33},1137978,"企业确定固定资产使用寿命，应当考虑的因素包括（ ）。",[105,107,109,110,112],{"key":20,"text":106,"correct":26},"预计生产能力或实物产量",{"key":24,"text":108,"correct":26},"预计有形损耗和无形损耗",{"key":28,"text":97,"correct":22},{"key":31,"text":111,"correct":22},"固定资产的原价",{"key":84,"text":113,"correct":26},"法律或类似规定对资产使用的限制","ABE",{"id":116,"libraryId":5,"type":72,"typeLabel":73,"stem":117,"options":118,"answer":129,"analysis":33},1137979,"按照企业财务制度的规定，（ ）等支出不得列入收益性支出。",[119,121,123,125,127],{"key":20,"text":120,"correct":26},"购置固定资产",{"key":24,"text":122,"correct":26},"捐赠支出",{"key":28,"text":124,"correct":22},"购置材料支出",{"key":31,"text":126,"correct":26},"资产减值准备",{"key":84,"text":128,"correct":26},"股利分配支出","ABDE",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1137980,"下列各项不属于营业外支出的是（ ）。",[134,135,136,138],{"key":20,"text":81,"correct":22},{"key":24,"text":79,"correct":22},{"key":28,"text":137,"correct":26},"坏账损失",{"key":31,"text":139,"correct":22},"处置固定资产净损失",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},1137981,"某施工企业购入一台施工机械，原价60000元，预计残值率3%，使用年限8年，按平均年限法计提折旧，该设备每年应计提的折旧额为（ ）元。",[144,146,148,150],{"key":20,"text":145,"correct":22},"5820",{"key":24,"text":147,"correct":26},"7275",{"key":28,"text":149,"correct":22},"6000",{"key":31,"text":151,"correct":22},"7500",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1137982,"某施工企业有一台原值为600000元，预计使用年限为5年，预计净残值率为1%的施工机械，如果采用年数总和法对设备计算折旧，第3年应计提的折旧额为（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":22},"200000元",{"key":24,"text":159,"correct":26},"118800",{"key":28,"text":161,"correct":22},"129000",{"key":31,"text":163,"correct":22},"98000",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1137983,"根据我国现行《企业会计准则》，不能列入工程成本支出的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":26},"处置固定资产的净损失",{"key":24,"text":171,"correct":22},"生产所耗用的人工费",{"key":28,"text":173,"correct":22},"生产所耗用的材料费",{"key":31,"text":175,"correct":22},"企业下属的施工单位为组织和管理施工生产活动所发生的费用",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},1137984,"某企业购入一项固定资产，预计使用年限为10年，预计净残值率为8%，根据企业会计准则及其相关规定，按平均年限法计提折旧，该固定资产第二年的折旧率为（ ）。",[180,182,184,186],{"key":20,"text":181,"correct":26},"9.2%",{"key":24,"text":183,"correct":22},"10%",{"key":28,"text":185,"correct":22},"17.2%",{"key":31,"text":187,"correct":22},"18%",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},1137985,"费用按经济用途可分为生产成本和期间费用，下列费用中，属于生产成本的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"材料费",{"key":24,"text":195,"correct":22},"营业费",{"key":28,"text":197,"correct":22},"财务费",{"key":31,"text":199,"correct":22},"管理费",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":28,"analysis":33},1137986,"某企业购入一台运输设备，购置成本24万元，该运输设备使用年限为10年。根据企业会计准则及相关规定，按双倍余额递减法，该运输设备第三年计提的折旧额为（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":22},"19530",{"key":24,"text":207,"correct":22},"24200",{"key":28,"text":209,"correct":26},"30720",{"key":31,"text":211,"correct":22},"32820",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1137987,"某大型设备原值50万元，折旧年限规定为10年，预计使用寿命2400台班，预计净残值率为5%，则用工作量法计算的每工作台班折旧额为（ ）元。",[216,218,220,222],{"key":20,"text":217,"correct":26},"197.92",{"key":24,"text":219,"correct":22},"126.67",{"key":28,"text":221,"correct":22},"184.33",{"key":31,"text":223,"correct":22},"156.34",{"id":225,"libraryId":5,"type":72,"typeLabel":73,"stem":226,"options":227,"answer":238,"analysis":33},1137988,"工程成本的计算方法一般应根据工程价款的结算方式来确定，下列关于工程成本月份结算法说法正确的有（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":22},"是以每个合同为对象归集施工过程中发生的施工费用，在工程竣工后按照所归集的全部施工费用结算该项工程实际成本",{"key":24,"text":231,"correct":26},"既要以建造合同为对象，又要按月计算单位工程中已完分部分项工程成本",{"key":28,"text":233,"correct":26},"是在按照单位工程归集施工费用的基础上，逐月定期结算单位工程已完工程实际成本",{"key":31,"text":235,"correct":26},"按月计算单位工程中已完分部分项工程成本，需要办理工程成本中间结算",{"key":84,"text":237,"correct":22},"该方法中的“已完工程”是指虽未完成全部工序，但已完成某一工程阶段或部位的分部分项工程。","BCD",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},1137989,"在固定资产折旧方法中，固定资产使用前期提取较多折旧，而在使用后期则提取较少折旧的方法是（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":22},"平均年限法",{"key":24,"text":246,"correct":26},"双倍余额递减法",{"key":28,"text":248,"correct":22},"工作量法",{"key":31,"text":250,"correct":22},"直线法",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1137990,"和平均年限法相比，采用双倍余额递减法对固定资产计提折旧将使（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":26},"计提折旧的初期，企业利润减少，固定资产净值减少",{"key":24,"text":258,"correct":22},"计提折旧的初期，企业利润减少，固定资产原值减少",{"key":28,"text":260,"correct":22},"计提折旧的后期，企业利润减少，固定资产净值减少",{"key":31,"text":262,"correct":22},"计提折旧的后期，企业利润减少，固定资产原值减少",{"id":264,"libraryId":5,"type":72,"typeLabel":73,"stem":265,"options":266,"answer":114,"analysis":33},1137991,"按照《企业会计准则》，下列项目中应当计入营业外支出的有（ ）。",[267,269,270,272,274],{"key":20,"text":268,"correct":26},"固定资产盘亏损失",{"key":24,"text":79,"correct":26},{"key":28,"text":271,"correct":22},"投资损失",{"key":31,"text":273,"correct":22},"税金",{"key":84,"text":275,"correct":26},"罚款支出",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":31,"analysis":33},1137992,"根据财务会计的有关规定，下列支出中，属于费用的是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":22},"购置固定资产的支出",{"key":24,"text":283,"correct":22},"向所有者分红支出",{"key":28,"text":285,"correct":22},"支付未按期纳税的滞纳金",{"key":31,"text":287,"correct":26},"支付购置原材料的价款",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":28,"analysis":33},1137993,"折旧基数随着使用年限变化而变化的折旧方法是（ ）。",[292,293,294,295],{"key":20,"text":244,"correct":22},{"key":24,"text":248,"correct":22},{"key":28,"text":246,"correct":26},{"key":31,"text":296,"correct":22},"年数总和法",{"id":298,"libraryId":5,"type":72,"typeLabel":73,"stem":299,"options":300,"answer":311,"analysis":33},1137994,"下列关于联合试运转费的描述中，正确的有（ ）。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"联合试运转费包括由设备安装工程费用开支的调试及试车费用",{"key":24,"text":304,"correct":26},"不发生试运转或试运转收入大于费用支出的工程，不列联合试运转费",{"key":28,"text":306,"correct":26},"当联合试运转收入小于试运转支出时，联合试运转费=联合试运转费用支出-联合试运转收入",{"key":31,"text":308,"correct":22},"联合试运转费包括试运转中暴露出来的因施工原因发生的处理费用",{"key":84,"text":310,"correct":26},"联合试运转支出包括施工单位参加试运转的人员工资以及专家指导费","BCE",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},1137995,"某固定资产原值为10000元，预计净残值率为4%，预计使用年限为5年，则按年数总和法计算的第三年折旧额为（ ）元。",[316,318,320,322],{"key":20,"text":317,"correct":22},"2560",{"key":24,"text":319,"correct":22},"2000",{"key":28,"text":321,"correct":22},"1280",{"key":31,"text":323,"correct":26},"1920",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":20,"analysis":33},1137996,"固定资产的账面价值是固定资产原值扣减（ ）后的余额。",[328,330,332,333],{"key":20,"text":329,"correct":26},"累计折旧和累计减值准备",{"key":24,"text":331,"correct":22},"预计净残值和累计减值准备",{"key":28,"text":97,"correct":22},{"key":31,"text":334,"correct":22},"累计折旧",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},1137997,"(2014真题)根据《企业会计准则第15号——建造合同》，属于工程成本直接费用的是()。",[339,340,342,343],{"key":20,"text":41,"correct":22},{"key":24,"text":341,"correct":22},"销售费用",{"key":28,"text":39,"correct":22},{"key":31,"text":344,"correct":26},"人工费用",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":31,"analysis":33},1137998,"采用平均年限法计算固定资产的折旧率时，固定资产的折旧率与()无关。",[349,350,352,354],{"key":20,"text":97,"correct":22},{"key":24,"text":351,"correct":22},"预计使用年限",{"key":28,"text":353,"correct":22},"固定资产原值",{"key":31,"text":355,"correct":26},"预计总量",{"id":357,"libraryId":5,"type":72,"typeLabel":73,"stem":358,"options":359,"answer":367,"analysis":33},1138000,"(2014真题)如果计划在固定资产投入使用的前期提取较多的折旧，后期提取较少的折旧，适合采用的折旧方法有()。",[360,362,364,365,366],{"key":20,"text":361,"correct":22},"工作台班法",{"key":24,"text":363,"correct":22},"行驶里程法",{"key":28,"text":246,"correct":26},{"key":31,"text":244,"correct":22},{"key":84,"text":296,"correct":26},"CE",{"id":369,"libraryId":5,"type":72,"typeLabel":73,"stem":370,"options":371,"answer":367,"analysis":33},1138002,"固定资产双倍余额递减法折旧的特点有（ ）。 2016",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"每年计算折旧的固定资产价值不变",{"key":24,"text":375,"correct":22},"折旧率逐渐降低",{"key":28,"text":377,"correct":26},"计算折旧时不考虑固定资产预算净现值",{"key":31,"text":379,"correct":22},"折旧年限比平均年限法折旧年限短",{"key":84,"text":381,"correct":26},"前期折旧额高，后期折旧额低",{"id":383,"libraryId":5,"type":72,"typeLabel":73,"stem":384,"options":385,"answer":114,"analysis":33},1138003,"（2020年真题）下列固定资产相关费用中，构成固定资产原值(原价)的有（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":26},"固定资产购买价款",{"key":24,"text":389,"correct":26},"购置固定资产发生的装卸费",{"key":28,"text":391,"correct":22},"固定资产大修理费用",{"key":31,"text":393,"correct":22},"固定资产的预计净残值",{"key":84,"text":395,"correct":26},"固定资产达到预定可使用状态前的安装费",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1138004,"在施工企业工程核算中，工程项目成本核算的主体和中心任务是（ ）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"执行国家有关成本开支范围、费用开支标准、工程预算定额和企业施工预算、成本计算的有关规定，控制费用，促使项目合理、节约地使用人力、物力和财力",{"key":24,"text":403,"correct":26},"正确及时地核算施工过程中发生的各项费用，计算施工项目的实际成本",{"key":28,"text":405,"correct":22},"反映和监督施工项目成本计划的完成情况",{"key":31,"text":407,"correct":22},"为项目成本预测，为参与项目施工生产、技术和经营决策提供可靠的成本报告和有关资 料，促进项目改善经营管理，降低成本",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":24,"analysis":33},1138005,"关于施工企业工程成本核算的任务，下列（ ）是项目成本核算的根本目的。",[412,413,415,417],{"key":20,"text":403,"correct":22},{"key":24,"text":414,"correct":26},"反映和监督施工项目成本计划的完成情况，为项目成本预测，为参与项目施工成本生产、技术和经营决策提供可靠的成本报告和有关资料，促进项目改善经营管理，降低成本，提高经济效益",{"key":28,"text":416,"correct":22},"执行国家有关成本开支范围、费用开支标准、工程预算定额和预算、成本计划的有关规定，控制费用，促进项目合理、节约地使用人力、物力和财力",{"key":31,"text":418,"correct":22},"正确确定成本核算对象，准确诡计和分配施工生产费用",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},1138006,"根据《企业会计准则第15号——建造合同》，下列费用中，不应计入工程成本的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"为订立施工合同而发生的有关费用",{"key":24,"text":426,"correct":22},"为工程施工所耗用的材料费用",{"key":28,"text":428,"correct":22},"在施工过程中发生的材料二次搬运费",{"key":31,"text":430,"correct":22},"企业下属的施工单位为组织和管理施工生产活动所产生的费用",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":31,"analysis":33},1138007,"施工企业工程成本不包括（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"耗用的机械使用费",{"key":24,"text":438,"correct":22},"施工过程中发生的二次搬运费",{"key":28,"text":440,"correct":22},"临时设施摊销费用",{"key":31,"text":442,"correct":26},"融资租赁费用",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1138008,"已知某技术方案年总成本费用为2700万元，销售费用，管理费用合计为总成本费用的15%，固定资产折旧费为300万元，摊销费为120万元，利息支出70万元。则该技术方案年经营成本为（ ）万元。",[447,449,451,453],{"key":20,"text":448,"correct":22},"1600",{"key":24,"text":450,"correct":26},"2210",{"key":28,"text":452,"correct":22},"2126",{"key":31,"text":454,"correct":22},"2480",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1138009,"某装饰企业施工的M项目于2012年10月工程完工时只发生材料费30万元，项目管理人员工资8万元，企业行政管理部门发生的水电费2万元。根据现行《企业会计准则》，应计入工程成本的费用为（ ）万元。",[459,461,463,465],{"key":20,"text":460,"correct":22},"30",{"key":24,"text":462,"correct":26},"38",{"key":28,"text":464,"correct":22},"32",{"key":31,"text":466,"correct":22},"40",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},1138010,"在工程成本核算中，要做到（ ）三同步。",[471,473,475,477],{"key":20,"text":472,"correct":26},"形象进度、产值统计、实际成本归集",{"key":24,"text":474,"correct":22},"形象进度、合同履约、产值归集",{"key":28,"text":476,"correct":22},"计划成本、责任成本、实际成本归集",{"key":31,"text":478,"correct":22},"产值统计、责任成本、实际成本归集",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},1138011,"某装饰企业所属的A项目于2011年10月完工，工程完工时共发生材料费30万元，项目施工人员工资8万元，行政管理部门发生的水电费共2万元。根据企业会计准则及相关规定，应计入工程成本的费用为（ ）万元。",[483,485,486,487],{"key":20,"text":484,"correct":22},"2",{"key":24,"text":460,"correct":22},{"key":28,"text":464,"correct":22},{"key":31,"text":462,"correct":26},{"id":489,"libraryId":5,"type":72,"typeLabel":73,"stem":490,"options":491,"answer":238,"analysis":33},1138012,"工程成本核算对象的确定方法有（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"以施工地区作为成本核算对象",{"key":24,"text":495,"correct":26},"以单项施工承包合同作为施工工程成本核算对象",{"key":28,"text":497,"correct":26},"对合同分立以确定施工工程成本核算对象",{"key":31,"text":499,"correct":26},"对合同合并以确定施工工程成本核算对象",{"key":84,"text":501,"correct":22},"以工程类型确定施工工程成本核算对象",{"id":503,"libraryId":5,"type":72,"typeLabel":73,"stem":504,"options":505,"answer":129,"analysis":33},1138013,"根据《企业会计准则第15号——建造合同》，工程成本中的其他直接费包括施工过程中发生的（ ）。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"材料二次搬运费",{"key":24,"text":509,"correct":26},"临时设施摊销费",{"key":28,"text":511,"correct":22},"施工机械安装、拆卸和进出场费",{"key":31,"text":513,"correct":26},"工程定位复测费",{"key":84,"text":515,"correct":26},"场地清理费",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1138014,"某机电安装公司2011年10月发生施工材料费用60万元，人工费25万元，机械使用费用5万元，财产保险费5万元。根据企业会计准则及其相关规定，则此项工程成本是（ ）万元。",[520,521,523,525],{"key":20,"text":460,"correct":22},{"key":24,"text":522,"correct":22},"65",{"key":28,"text":524,"correct":22},"90",{"key":31,"text":526,"correct":26},"95",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1138015,"(2014真题)施工企业收取的下列款项中，不能计人企业收入的是()。",[531,533,535,537],{"key":20,"text":532,"correct":26},"代扣职工个人的所得税",{"key":24,"text":534,"correct":22},"收到的工程价款",{"key":28,"text":536,"correct":22},"转让施工技术取得的收入",{"key":31,"text":538,"correct":22},"销售材料价款的收入",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1138016,"(2014真题)关于施工企业确定工程成本核算对象的说法，正确的是()。",[543,545,547,549],{"key":20,"text":544,"correct":26},"通常以单项建造合同作为施工工程成本核算的对象",{"key":24,"text":546,"correct":22},"工程成本核算对象宜在开工前确定，也可以开工后再确定",{"key":28,"text":548,"correct":22},"不能按分立合同来确定工程成本核算对象",{"key":31,"text":550,"correct":22},"不能按合并合同来确定工程成本核算对象",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},1138017,"工程成本核算包括的环节有：①核算与分配各项生产费用；②确定成本核算对象，设置成本核算科目，开设成本明细账；③计算年度合同费用；④计算期末工程成本；⑤编制单位工程竣工成本决算，则正确的核算程序是（ ）。( 2015真题 )",[555,557,559,561],{"key":20,"text":556,"correct":22},"①②③④⑤",{"key":24,"text":558,"correct":22},"①②④③⑤",{"key":28,"text":560,"correct":26},"②①④③⑤",{"key":31,"text":562,"correct":22},"②③①④⑤",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},1138018,"《企业会计准则第15号——建造合同》中推行的确认合同收入和结转成本费用的方法是（ ）。( 2015真题 )",[567,569,571,573],{"key":20,"text":568,"correct":26},"完工百分比法",{"key":24,"text":570,"correct":22},"竣工结算法",{"key":28,"text":572,"correct":22},"分段结算法",{"key":31,"text":574,"correct":22},"按月结算法",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":28,"analysis":33},1138021,"会计核算中，企业支付的借款利息属于（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"资本性支出",{"key":24,"text":582,"correct":22},"投资性支出",{"key":28,"text":584,"correct":26},"期间费用支出",{"key":31,"text":45,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},1138022,"在期间费用中，技术转让费属于（ ）。",[590,591,592,594],{"key":20,"text":41,"correct":26},{"key":24,"text":39,"correct":22},{"key":28,"text":593,"correct":22},"营业成本",{"key":31,"text":595,"correct":22},"公允价值变动收益",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":20,"analysis":33},1138023,"某施工企业在联系业务的过程中发生了10000元的应酬费，即业务招待费，该项费用应当计入（ ）。",[600,601,603,604],{"key":20,"text":41,"correct":26},{"key":24,"text":602,"correct":22},"工程成本",{"key":28,"text":39,"correct":22},{"key":31,"text":43,"correct":22},{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":20,"analysis":33},1138024,"根据《企业会计准则》，施工企业发生的固定资产日常修理费应作为（ ）予以确认。",[609,611,613,615],{"key":20,"text":610,"correct":26},"当期费用",{"key":24,"text":612,"correct":22},"待摊费用",{"key":28,"text":614,"correct":22},"直接费用",{"key":31,"text":616,"correct":22},"维持运营投资",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":28,"analysis":33},1138026,"根据我国现行《企业会计准则》，企业支付的广告费属于企业的（ ）。",[621,622,624,626],{"key":20,"text":580,"correct":22},{"key":24,"text":623,"correct":22},"利润分配支出",{"key":28,"text":625,"correct":26},"期间费用",{"key":31,"text":45,"correct":22},[628,631,634,637,640,643],{"id":15,"name":629,"category":7,"favorite":630},"领导干部任职前廉政法规知识测试题",92,{"id":632,"name":633,"category":7,"favorite":15},595,"建筑结构与设备",{"id":635,"name":636,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":638,"name":639,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":641,"name":642,"category":7,"favorite":8},534,"BIM工程师",{"id":644,"name":642,"category":7,"favorite":8},535]