[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140372":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1140372,798,1,"单选题","在进行单因素敏感性分析时，如果主要分析投资大小对方案资金回收能力的影响，一般选用()为分析指标．",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","投资回收期",false,{"key":16,"text":17,"correct":14},"B","净现值",{"key":19,"text":20,"correct":21},"C","FIRR",true,{"key":23,"text":24,"correct":14},"D","FNPVR","2020\u002F2019版教材P38 如果主要分析技术方案状态和参数变化对技术方案投资回收快慢的影响，则可选用静态投资回收期作为分析指标；如果主要分析产品价格波动对技术方案超额净收益的影响，则可选用财务净现值作为分析指标；如果主要分析投资大小对技术方案资金回收能力的影响，则可选用财务内部收益率指标等。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]