[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140328":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1140328,798,1,"单选题","下列不属于总成本费用的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","机会成本",true,{"key":16,"text":17,"correct":18},"B","固定成本",false,{"key":20,"text":21,"correct":18},"C","可变成本",{"key":23,"text":24,"correct":18},"D","半可变成本","2020\u002F2019版教材P33 根据成本费用与产量（或工程量）的关系可以将技术方案总成本费用分解为可变成本、固定成本和半可变（或半固定）成本。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]