[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140190":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140190,798,2,"多选题","建设项目财务评价时，可以采用静态评价指标进行评价的情形有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","技术上更新迅速的技术方案",true,{"key":16,"text":17,"correct":14},"B","资金相当短缺的技术方案",{"key":19,"text":20,"correct":21},"C","评价精度要求较高",false,{"key":23,"text":24,"correct":14},"D","未来的情况很难预测而投资者又特别关心资金补偿的技术方案",{"key":26,"text":27,"correct":21},"E","项目现金流量变动大","ABD","2020\u002F2019版教材P23 考点:静态投资回收期的特点，对于那些在技术上更新迅速的技术方案，或资金相当短缺的技术方案，或未来的情况很难预测而投资者又特别关心资金补偿的技术方案，采用静态投资回收期评价特别有实用意义。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]