[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140181":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1140181,798,1,"单选题","关于静态投资回收期说法正确的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","静态投资回收期宜从技术方案投产开始年算起",false,{"key":16,"text":17,"correct":14},"B","静态投资回收期等于投资利润率的倒数",{"key":19,"text":20,"correct":21},"C","静态投资回收期只考虑回收之前的效果，不能反映投资回收之后的情况",true,{"key":23,"text":24,"correct":14},"D","静态投资回收期可以单独用来评价方案是否可行","2020\u002F2019版教材P22 静态投资回收期宜从技术方案建设开始年算起。由于技术方案的年净收益不等于年利润额，所以静态投资回收期不等于投资利润率的倒数。静态投资回收期没有全面地考虑技术方案整个计算期内现金流量，即只考虑回收之前的效果，不能反映投资回收之后的情况，故无法准确衡量技术方案在整个计算期内的经济效果。所以，静态投资回收期作为技术方案选择和技术方案排队的评价准则是不可靠的，它只能作为辅助评价指标，或与其他评价指标结合应用。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]