[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140080":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140080,798,2,"多选题","现金流量的分布情况，说明（ ）．",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","从收益方面来看，获得时间越早，数额越大，其现值越大",true,{"key":16,"text":17,"correct":18},"B","从收益方面来看，获得时间越早，数额越小，其现值越大",false,{"key":20,"text":21,"correct":14},"C","建设项目早投产，早获收益，多获收益，才能达到最佳经济效益",{"key":23,"text":24,"correct":14},"D","在投资额一定的情况下，投资支出的时间越晚，数额越小，现值越小",{"key":26,"text":27,"correct":18},"E","在投资额一定的情况下，投资支出的时间越晚，数额越小，现值越大","ACD","2020\u002F2019版教材P8 考点:现金流量的分布情况，从收益方面来看，获得的时间越早、数额越多，其现值也越大。因此，应使技术方案早日完成，早日实现生产能力，早获收益，多获收益，才能达到最佳经济效益。从投资方面看，在投资额一定的情况下，投资支出的时间越晚、数额越少，其现值也越小。因此，应合理分配各年投资额，在不影响技术方案正常实施的前提下，尽量减少建设初期投资额，加大建设后期投资比重。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]