[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139950":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139950,798,1,"单选题","主要适用于施工过程中必须发生，但在投标时很难具体分项预测，又无法单独列出项目内容的措施项目的措施项目费的计价方法是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","综合单价法",false,{"key":16,"text":17,"correct":14},"B","定额基价法",{"key":19,"text":20,"correct":21},"C","参数法计价",true,{"key":23,"text":24,"correct":14},"D","分包法计价","本题考查的是不同种类措施项目费计算方法的区分。（1）综合单价法适用于可以计算工程量的措施项目，如混凝土模板、脚手架、垂直运输等；（2）参数法计价适用于施工过程中必须发生，但在投标时很难具体分项预测，又无法单独列出项目内容的措施项目。如夜间施工费、二次搬运费、冬雨期施工；（3）分包法计价适合于可以分包的独立项目，如室内空气污染测试等。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]