[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139937":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1139937,798,1,"单选题","承包人为协调、配合发包人所产生的费用应计入（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计日工",false,{"key":16,"text":17,"correct":18},"B","总承包服务费",true,{"key":20,"text":21,"correct":14},"C","暂列金额",{"key":23,"text":24,"correct":14},"D","暂估价","总承包服务费应根据招标工程量列出的专业工程暂估价内容和供应材料、设备情况，按照招标人提出协调、配合与服务要求和施工现场管理需要自主确定",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]