[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139935":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1139935,798,1,"单选题","根据《建设工程工程量清单计价规范》(GB50500-2013)，关于工程量清单的说法，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","措施项目费都应该以“项”为计量单位",true,{"key":16,"text":17,"correct":18},"B","同一招标工程的项目编码不能重复",false,{"key":20,"text":21,"correct":18},"C","施工单位投标报价时清单项目的工程量不可以更改",{"key":23,"text":24,"correct":18},"D","暂列金额可以用于施工中可能发生工程变更时的工程价款调整","措施项目费分为可计量和不可计量的，可计量的是相应工程量乘以综合单价。不可计量的可以用“项”为计量单位。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]