[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139887":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1139887,798,1,"单选题","某拟建项目的建筑安装工程费为500 万元，设备及工器具购置费为300 万元，工程建设其它费为150 万元，基本预备费率5%，基本预备费为（ ）万元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","47.5",true,{"key":16,"text":17,"correct":18},"B","15",false,{"key":20,"text":21,"correct":18},"C","30",{"key":23,"text":24,"correct":18},"D","28.5","（500+300+150）×5%=47.5 万元。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]