[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139807":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1139807,798,1,"单选题","四个互斥性施工方案的功能系数和成本系数如下表。从价值工程角度最优的方案是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","甲",false,{"key":16,"text":17,"correct":18},"B","乙",true,{"key":20,"text":21,"correct":14},"C","丙",{"key":23,"text":24,"correct":14},"D","丁","V 甲=1.10\u002F1.10=1； V 乙=1.20\u002F1.05=1.14； V 丙=1.15\u002F1.17=0.98； V 丁=1.10\u002F1.20=0.92； 不同方案的比选，最优选V 大的。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]