[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139718":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1139718,798,1,"单选题","（2019年真题）根据《建设工程施工合同(示范文本)》，除专用合同条款另有约定外，承包人应提交最终结清申请单及证明材料的最迟时间为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","竣工验收合格后7天",false,{"key":16,"text":17,"correct":18},"B","缺陷责任期终止证书颁发后7天",true,{"key":20,"text":21,"correct":14},"C","签发竣工付款征书后14天",{"key":23,"text":24,"correct":14},"D","工程竣工验收合格后28天","P286-292 除专用合同条款另有约定外，承包人应在缺陷责任期终止证书颁发后7 天内，按专用合同条款约定的份数向发包人提交最终结清申请单，并提供相关证明材料。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]