[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139668":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1139668,798,2,"多选题","根据《建设工程工程量清单计价规范》GB50500-2013，关于单价合同工程计量的说法，正确的有（ ）。2017真题",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承包人认为发包人核实后的计量结果有误，应及时口头告知发包人",false,{"key":16,"text":17,"correct":18},"B","发包人在现场计量前24小时通知承包人，承包人未派人参加计量结果有效",true,{"key":20,"text":21,"correct":18},"C","工程量按承包人在履行合同义务过程中实际完成应予计量的工程量确定",{"key":23,"text":24,"correct":18},"D","对于承包人原因造成超出施工图纸范围施工的工程量，不予计量",{"key":26,"text":27,"correct":18},"E","对工程变更引起工程量的增减变化，应据实调整，正确计量","BCDE","本题考查的是单价合同的计量。选项A，计量结果有误时，承包人应当向发包人提出书面意见；选项E，当发现招标工程量清单中出现缺项、工程量偏差，或因工程变更引起工程量增减时，应按承包人在履行合同义务中完成的工程量计量。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]