[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139658":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139658,798,1,"单选题","（2019年真题）国际工程投标中，投标人在投标截止日前一天发现招标工程量清单中某分项工程量有明显的计算错误，则最适宜采取的做法是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按照施工中可能的工程量填报单价，不做任何额外说明",false,{"key":16,"text":17,"correct":14},"B","电话咨询招标人，根据招标人口头认可的数量填报单价",{"key":19,"text":20,"correct":21},"C","按照原招标文件的工程量填报单价，另在投标致函中予以说明",true,{"key":23,"text":24,"correct":14},"D","按照投标人修正的工程量填报单价，另在投标致函中予以说明","P245-252 投标人必须按招标工程量清单填报价格。实行工程量清单招标，招标人在招标文件中提供工程量清单，其目的是使各投标人在投标报价中具有共同的竞争平台。因此，为避免出现差错，要求投标人必须按招标人提供的招标工程量清单填报投标价格，填写的项目编码、项目名称、项目特征、计量单位、工程量必须与招标工程量清单一致。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]