[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139646":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1139646,798,2,"多选题","根据《建设工程工程量清单计价规范》，关于单价项目中风险及其费用的说法，正确的有（）。2018真题",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","对于招标文件中要求投标人承担的风险，投标人应在综合单价中予以考虑",true,{"key":16,"text":17,"correct":14},"B","投标人的综合单价中考虑风险费通常以风险费率的形式进行计算",{"key":19,"text":20,"correct":21},"C","招标文件中没有提到的风险，投标人在综合单价中不予考虑",false,{"key":23,"text":24,"correct":14},"D","对于风险范围和风险费用的计算方法应在合同专用条款中作出约定",{"key":26,"text":27,"correct":14},"E","施工中出现的风险内容及其范围在招标文件规定的范围内时，综合单价不得变动","ABDE","本题考查的是合同价款的约定。选项C，招标文件中没有提及到的风险，投标人也应当予以考虑，保证项目的顺利完成。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]