[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139582":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1139582,798,1,"单选题","工程量清单计价模式下，关于分部分项工程量和定额子目的说法，错误的是（ ）。2017真题",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","清单工程量是按施工图图示尺寸和工程量清单计算规则计算得到的工程净量",false,{"key":16,"text":17,"correct":14},"B","定额子目工程量应严格按照与所采用的定额相对应的工程量计算规则计算",{"key":19,"text":20,"correct":14},"C","一个清单项目对应一个定额子目时，清单工程量和定额工程量很可能不同",{"key":22,"text":23,"correct":24},"D","清单工程量是承包人履行合同义务中应予完成的实际施工工程量",true,"本题考查的是分部分项工程项目清单的编制。选项D，清单工程量是按照施工图计算的工程量，通常情况下，小于施工单位实际完成的工程量。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]