[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139580":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1139580,798,1,"单选题","根据《建设工程工程量清单计价规范》GB50500-2013，某分部分项工程的项目编码为01-02-03-004-005，其中“004”这一级编码的含义是（ ）。2017真题",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程分类顺序码",false,{"key":16,"text":17,"correct":14},"B","清单项目顺序码",{"key":19,"text":20,"correct":14},"C","分部工程顺序码",{"key":22,"text":23,"correct":24},"D","分项工程顺序码",true,"本题考查的是分部分项工程项目清单的编制。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]