[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139558":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1139558,798,2,"多选题","在传统定额计价模式下，政府主管部产让规定的计价依据包括（ ）。 (2012)",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程预算定额",true,{"key":16,"text":17,"correct":14},"B","工程量计算规则",{"key":19,"text":20,"correct":14},"C","间接费的内容",{"key":22,"text":23,"correct":24},"D","施工方案",false,{"key":26,"text":27,"correct":14},"E","间接费的取费标准","ABCE","传统计价模式下，由主管部门制定工程预算定额，并且规定间接费的内容和取费标准。建设单位和施工单位均先根据预算定额中规定的工程量计算规则、定额单价计算人、料、机费用，再按照规定的费率和取费程序计取企业管理费、利润、规费和税金，汇总得到工程造价。其中，预算定额单价既包括了消耗量标准，又含有单位价格。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]