[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139526":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139526,798,1,"单选题","某工程初步设计深度不够，不能准确计算工程量，但工程采用的技术比较成熟，又有类似工程概算指标可以使用，则编制该工程计算概算，适宜采用的方法是（）。(2012)",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","概算定额法",false,{"key":16,"text":17,"correct":14},"B","类似工程预算法",{"key":19,"text":20,"correct":21},"C","概算指标法",true,{"key":23,"text":24,"correct":14},"D","预算单价法","当初步设计深度不够，不能准确地计算工程量，但工程设计采用的技术比较成熟而又有类似工程概算指标可以利用时，可以采用概算指标法编制工程概算。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]