[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139525":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1139525,798,1,"单选题","根据《财政投资项目评审操作规程》（试行）（财办理[2002]619号），投送评审机构评审的项目概算应由项目（ ）提供。 (2012)",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","主管部门",false,{"key":20,"text":21,"correct":18},"C","设计单位",{"key":23,"text":24,"correct":18},"D","施工单位","建设单位 .项目概算应由项目建设单位提供，项目建设单位委托其他单位编制项目概算的，由项目单位确认后报送评审机构进行评审。项目建设单位没有编制项目概算的，评审机构应督促项目建设单位尽快编制。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]