[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139493":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1139493,798,1,"单选题","建设工程施工定额的研究对象是（）。 (2013)",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部分项工程",false,{"key":16,"text":17,"correct":18},"B","工序",true,{"key":20,"text":21,"correct":14},"C","扩大的分部分项工程",{"key":23,"text":24,"correct":14},"D","整个建筑物或构筑物","施工定额是以同一性质的施工过程—工序作为研究对象",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]