[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139490":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1139490,798,2,"多选题","编制机械台班使用定额时，机械工程必需消耗的时间包括（ ). (2013)",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","不可避免的中断时间",true,{"key":16,"text":17,"correct":14},"B","不可避免的无负荷工作时间",{"key":19,"text":20,"correct":14},"C","有效工作时间",{"key":22,"text":23,"correct":24},"D","低负荷下工作时间",false,{"key":26,"text":27,"correct":24},"E","由于劳动组织不当引起的中断时间","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]