[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139479":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":20},1139479,798,1,"单选题","以建筑物或构筑物各个分部分项工程为对象编制的定额是（ ）。 (2012)",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工定额",false,{"key":16,"text":17,"correct":14},"B","材料消耗定额",{"key":19,"text":20,"correct":21},"C","预算定额",true,{"key":23,"text":24,"correct":14},"D","概算定额",{"id":6,"name":26,"category":27,"favorite":28},"一建建设工程经济","建筑工程",0]