[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139453,798,1,"单选题","某建设工程项目的设备及工器具购置费为2500万元，建筑安装工程费为2000万元，工程建设其他费为1500万元，基本预备费率为10%，则该项目的基本预备费为（ ）万元。 (2012)",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","200",false,{"key":16,"text":17,"correct":14},"B","400",{"key":19,"text":20,"correct":21},"C","600",true,{"key":23,"text":24,"correct":14},"D","450","（2500+2000+1500）*10%=600（万元）。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]