[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139297":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1139297,798,1,"单选题","（2019年真题）当企业与客户之间的合同变更之后发生可变对价后续变动，且合同变更增加了可明确区分的商品及合同价款，同时新增合同价款反映了新增商品单独售价，对该合同变更部分进行了会计处理时，正确的做法是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","将合同变更部分作为原合同的组成部分处理",false,{"key":16,"text":17,"correct":18},"B","将合同变更部分作为一份单独的合同处理",true,{"key":20,"text":21,"correct":14},"C","将原合问未履行的部分和变更部分合并为新合同处理",{"key":23,"text":24,"correct":14},"D","将原合同与变更部分合并形成新合同处理","P111-114 合同变更增加了可明确区分的商品及合同价款，且新增合同价款反映了新增商品单独售价的，应当将该合同变更部分作为一份单独的合同进行会计处理。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]