[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139290":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139290,798,1,"单选题","根据《企业会计准则》，若企业在资产负债表日提供劳务交易结果不能够可靠估计，且已经发生的劳务成本预计不能的到补偿，则收入确认的方式是（）。 （2016）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","按照已经发生的劳务成本确认收入",false,{"key":16,"text":17,"correct":14},"B","按照合同金额确认收入",{"key":19,"text":20,"correct":21},"C","不确认提供劳务收入",true,{"key":23,"text":24,"correct":14},"D","按合同完工百分比确认收入","企业在资产负债表日提供劳务交易结果不能够可靠估计的，应当分别下列情况处理: (1)已经发生的劳务成本预计能够得到补偿的，按照已经发生的劳务成本金额确认提供劳务收入，并按相同金额结转劳务成本。 (2) 已经发生的劳务成本预计不能够得到补偿的，应当将已经发生的劳务成本计人当期损益，不确认提供劳务收入。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]