[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139281":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1139281,798,1,"单选题","有确凿证据表明合同折扣与多项（非全部）履约义务相关的，在估计各项履约义务对应商品的单独售价时，合同折扣的处理方法应为（）。2018真题",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","在相关多项履约义务之间平均分摊",false,{"key":16,"text":17,"correct":14},"B","将折扣计入单项履约义务中利润最高的项目",{"key":19,"text":20,"correct":21},"C","在相关多项履约义务之间按比例分摊",true,{"key":23,"text":24,"correct":14},"D","将折扣计入单项履约义务中单价最低的项目","本题考查的是建造（施工）合同收入的核算。对于合同折扣，企业应当在各单项履约义务之间按比例分摊。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]