[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139194":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1139194,798,1,"单选题","某项目估计建设投资为1000万元，全部流动资金为200万元，建设当年即投产并达到设计生产能力，各年净收益均为270万元，则该项目的静态投资回收期为（）年",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2.13",false,{"key":16,"text":17,"correct":14},"B","3.70",{"key":19,"text":20,"correct":14},"C","3.93",{"key":22,"text":23,"correct":24},"D","4.44",true,"本题考查的是投资回收期分析。总投资是建设投资、建设期利息和流动资金之和。静态回收期=技术方案总投资\u002F技术方案每年的净收益=（1000+200）\u002F270=4.44（年）。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]