[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139192":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1139192,798,2,"多选题","建设工程项目经济效果评价中的总投资包括（ ）。2017真题",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","设备及工器具购置费",true,{"key":16,"text":17,"correct":14},"B","建设期利息",{"key":19,"text":20,"correct":21},"C","总成本费用",false,{"key":23,"text":24,"correct":14},"D","流动资金",{"key":26,"text":27,"correct":21},"E","流动资金借款利息","ABD","本题考查的是投资收益率分析。总投资包括建设投资、建设期贷款利息和全部流动资金。其中建设投资是包括设备及工器具购置费的。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]