[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139146":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1139146,798,1,"单选题","价值工程活动中，计算产品成品的方法是以产品（）为中心分析成本的事前成本计算方法。 (2012)",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","功能",true,{"key":16,"text":17,"correct":18},"B","质量",false,{"key":20,"text":21,"correct":18},"C","价格",{"key":23,"text":24,"correct":18},"D","性能","因此，可以说价值工程是以功能为中心，在可靠地实现必要的功能基础上来考虑降低产品成本的。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]