[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1139059":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1139059,798,1,"单选题","下列项目中，（ ）是一个未知数，应当根据招标具体情况、承包商对风险的承受能力等综合取定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","措施费",false,{"key":16,"text":17,"correct":14},"B","规费",{"key":19,"text":20,"correct":14},"C","利润",{"key":22,"text":23,"correct":24},"D","风险金",true,"本题主要考查了国际工程投标报价决策的影响因素。 风险金究竟取多大才算合适很难测算，需根据招标具体情况、内外部条件、竞争对手报价水平的估计，以及承包商自身对风险的承受能力与风险偏好，慎重研究后决定，尤其在外部商务环境较差（比如各类税收名目繁多、物价飞涨等）。 综上所述，本题正确答案为D项。@##",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]